Appendix
Attachment 2. Site Servicing Schematic – Westbrook Consulting Ltd.
January 8, 2019Page 631 section
Preliminary drawing showing the proposed servicing and layout for the 231 Heddle Ave strata lots.
December 19, 2018Westbrook Consulting Ltd.
Preliminary Drawing: 231 Heddle Ave
Project Information
- Project: 231 Heddle Ave
- Client: John Koren
- Westbrook Project No.: 3214
- Date: 2018-04-27
- Sheet Title: Site Servicing Schematic
- Scale: 1:250
- Designed: TK
- Drawn: PC
Legend - Proposed Services (Shown Bold)
| Symbol/Code | Description |
|---|---|
| W | Water |
| S | Sewer |
| D | Drain |
| —— | Edge Pave. |
| NMC | Non-Mtble Curb |
| MC | Mountable Curb |
| G | Gas |
| U/G | Underground Util. |
| NO | Cobra/Davit Light |
| (Arrow) | Road Sign |
| (Shaded) | Asphalt |
| (Stippled) | Concrete |
| (Hydrant Symbol) | Hydrant |
| (Valve Symbol) | Valve |
| (Meter Symbol) | Meter |
| (Manhole Symbol) | Manhole |
| C/O or CO | Cleanout |
| CB | Catchbasin |
Other Symbols
- Tree Symbol (Solid): Tree to remain. See arborist report.
- Tree Symbol (Empty): Tree to be removed.
- EP: Edge of Pavement
- WC: Asphalt Water Control
Site Plan Notes and Labels
- Property Boundaries: Includes SL 1, SL 2, SL 3, and SL 4.
- Roads: Heddle Ave, Island Hwy.
- Access: 5.0m access easement over SL1 in favor of SL4.
- Common Access: 8.0m wide common access (6.0m paved driveway and retaining wall as required).
- Infrastructure Details:
- Storm water detention gallery (typical).
- Retaining wall.
- Backflow prevention valve chamber.
- Water meter chamber to CRD detail 2.8.
- Remove lawn basin and replace with manhole.
- Perforated foundation drain.
- Disclaimer: The location and elevation of existing underground services on this drawing may not be accurate or complete. The actual horizontal and vertical locations must be confirmed by utility companies and [remainder of text truncated].
Page 63
Extracted from: 2019 01 08 Committee of the Whole Agenda - Agenda - Pdf