This site is in beta — data may be incomplete and features are still being added.
Committee of the Whole/Documents/APPENDIX C - Technical Reports (Cover Page)
Appendix

APPENDIX C - Technical Reports (Cover Page)

March 10, 2020Page 1291 section

A table of contents for the technical reports included in the conservation plan, covering structural, material, geotechnical, and tree assessments.

9.2.2 a) 1. Report titled "Draft Lime Kiln Conservation Plan" from the Director of Development Services dated May 1, 2012
Includes reports from Read Jones Christoffersen, GOAL Engineering, Thurber Engineering, and Dunster & AssociatesReports date from January to February 2012

APPENDIX C - Technical Reports

Structural Review, RJC, January 2012

Material Assessment, GOAL Engineering, February 2012

Geotechnical Assessment, Thurber Engineering Ltd., January 2012

Tree Issues, Dunster & Associates Ltd, February 2012

Page 129

Document Images

(1)
Document image
Extracted from: 2020 03 10 Committee of the Whole Agenda - Agenda - Pdf