This site is in beta — data may be incomplete and features are still being added.
Committee of the Whole/Documents/EAGLES NEST Development Proposal Presentation
Presentation

EAGLES NEST Development Proposal Presentation

March 10, 2020Pages 257–27113 sections

A visual presentation for the 'Eagles Nest' development project covering traffic impact assessments, community engagement history, site evolution, and the proposed development plan.

9.2.3 a) Rezoning - 1449 Burnside Road West (Eagles Nest)
1449 Burnside Road West247 units1.5 FSR (Floor Space Ratio)3 to 6 storeysTraffic assessment by WATT ConsultingConstruction projected to start Spring 2021 and finish Spring 2023

Traffic Impact Assessment

WATT Consulting completed a Traffic Impact Assessment (TIA) for the project. The following summarizes the key findings:

  • Existing conditions at the Helmcken / Watkiss / Chancelor intersection indicate unstable conditions for the eastbound left turn movement during the AM peak and severe westbound queuing and delay that spills back ~1 km beyond Burnside Road during the PM peak.
  • Existing conditions at the Helmcken / Burnside intersection indicate failing conditions for northbound and southbound movements on Burnside Rd during the AM peak and failing conditions for northbound movements on Burnside Rd during the PM peak.
  • Site generated traffic will add one vehicle to the study area road network approximately every 45 seconds during the AM peak and every 35 seconds during the PM peak.
  • Site generated traffic will have a negligible impact on traffic operations at the Helmcken / Watkiss / Chancelor and Helmcken / Burnside intersections at buildout (2023) and 10 years beyond buildout (2033).
  • The site access will operate well 10 years beyond full buildout and does not require a northbound left turn lane.
  • Transportation Demand Management strategies may reduce the development’s impact on traffic operations at study area intersections.
  • A sidewalk is recommended along the site’s frontage on Helmcken Road and Burnside Road West.
  • The installation of bus bay on Helmcken Rd fronting the site should be discussed with BC Transit.
  • Since December 2019 when the McKenzie / Highway 1 underpass was opened, media estimates indicate commute times between Langford and Victoria have been reduced 10 – 15 minutes. The McKenzie interchange project may in turn improve conditions on Helmcken Road and Burnside Road which should be reassessed once the interchange project is complete.
Aerial photograph of the development site and surrounding road network
Aerial photograph of the development site and surrounding road network
Page 257–271

2.0 Community Engagement & Site Planning

The site was the subject of a previous Rezoning Application, originally submitted in 2018 and withdrawn in 2019, to allow more community engagement and further site and technical analysis. This new application builds upon the input received during the original application process, and has benefited from collaborative consultation with the immediate neighbours to bring about a renewed and refined site plan.

At its core, however, the application remains committed to implementing the goals and objectives of the OCP and realizing a contribution to the regional housing needs with a site design that is respectful and responsive to its neighbourhood context.

The development planning team hosted two workshops with neighbours in November and December of 2019. The purpose of the workshops was to invite the immediate neighbours to participate in the planning process as the project reset and worked toward a new application. The workshop sessions were designed to allow collaborative discussion and engagement around the site plan to gather input and ideas to help shape the proposed buildings. A review of the View Royal planning policies for the site was shared, highlighting the community goal of achieving a greater variety of housing choice, affordability and better use of land. The team listened to gather input on issues and opportunities to be addressed by the plan.

The topics of traffic, transportation, tree retention, privacy, and building heights and stepping were discussed at the workshops. Input received during the first session in November informed refinement to the site plan, which was then brought forward for review and discussion at the second session in December.

A Community Meeting was scheduled to be hosted on January 15, 2020 to present the new plan and proposal prior to submission of this new Rezoning Application. Due to winter weather conditions, the Community Meeting had to be postponed, and is now scheduled for Monday, February 3, 2020.

The planning and design team believes the plan has been positively shaped by the community input and now better responds to a number of key issues raised.

Workshop participants reviewing a site plan layout
Workshop participants reviewing a site plan layout
Page 257–271

Site Plan Evolution with Community Input

Site Plan Version 1

Aerial photograph showing the undeveloped site area and surrounding residential properties
Aerial photograph showing the undeveloped site area and surrounding residential properties

OCTOBER 23, 2018 Community Meeting +/- 70 attendees (52 signed-in)

What we heard:

Traffic

  • concern about commuter traffic on Helmcken and capacity to accommodate proposed growth given regional traffic issues
  • challenge getting in and out of residential driveways
  • turnaround traffic into Hidden Oaks’ driveway

Building Height/Shadowing

  • concern about potential overshadowing of Hidden Oaks townhouses
  • question about the building massing/presence at the corner

Density

  • some concern about density, particularly relative to traffic impacts

Streetscape

  • questions about streetscape design - sidewalks?

Site Plan Version 2

JANUARY 9, 2019 Hidden Oaks Resident Meeting 9 attendees

What we heard:

Traffic

  • concern about turn-around traffic into Hidden Oaks’ driveway
  • discussion on strategies to deter turn-around traffic (signage, dedicated left-hand turn lane into Eagle Creek Village off of Helmcken.

Building Height/Shadowing

  • concern about 6-storey building being located adjacent to townhouses

Site Plan Version 3

JULY 9, 2019 Community Meeting 50 attendees (all signed-in)

What we heard:

Traffic

  • concern about traffic and impact of development on an already challenging traffic situation

Building Height/Shadowing

  • concern about 8-storey building at the back of the site
Page 257–271

Neighbours’ Workshops

NOVEMBER 18, 2019

Neighbours’ Workshop #1 13 attendees Site & Landscape Design

Discussion Topics:

  • Building heights & distribution
  • Site access & circulation
  • Edge conditions and screening / buffer
  • Landscape design ideas
  • Streetscape improvements
  • Density, traffic impacts

DECEMBER 2, 2019

Neighbours’ Workshop #2 8 attendees Site Plan Revisions

Discussion Topics:

  • Building heights & distribution
  • Traffic, speed and volume
  • Density measurements and design
  • Site access & circulation
  • Edge conditions and screening / buffer
  • Site grades and topography and stormwater management
  • Potential to retain some existing trees for privacy
  • Potential to retain rocky outcropping at western edge of site
  • Design of internal courtyard, on-site circulation
Overhead view of hands pointing to building footprints on a large-scale workshop site plan
Overhead view of hands pointing to building footprints on a large-scale workshop site plan
Close-up of workshop attendees' hands pointing to a detailed residential building plan
Close-up of workshop attendees' hands pointing to a detailed residential building plan
Group of participants standing around tables during a community workshop
Group of participants standing around tables during a community workshop
Workshop attendees viewing presentation boards pinned to a wall
Workshop attendees viewing presentation boards pinned to a wall
Page 257–271

3.0 Proposed Development Plan

To reset the site planning process, the team revisited the site analysis in collaboration with the neighbours’ planning workshops. This approach was informed by detailed site and tree surveys along with input from the neighbours with respect to building location, setbacks, height, stepping and privacy. Existing trees along the western property line were assessed and it was determined that setting the buildings back away from the property line would allow retention of important existing trees, and the rocky outcropping, that serve to provide privacy, screening and a natural setting for the neighbours.

The plan was also shaped by an urban planning objective to create strong pedestrian-oriented streetscapes along Helmcken Road and Burnside Road West. Buildings along these frontages are designed with ground-floor units that each have their own individual entry from the street. These units, and the daily activity of residents coming and going provide ‘eyes on the street’ and contribute to the place-making that can help encourage walking.

With all parking located underground, the internal courtyard is designed as a ‘woonerf’, a Dutch concept of a ‘living street’ with room for pedestrians, cyclists and cars. While the space allows for pick-up and drop-off vehicular use, it is intended as a social place for gathering, play, and interaction, rather than a space solely for vehicles. The adjacent central green space provides an additional amenity for residents and contributes to the overall greening of the site, with more landscaping and pervious surface than has been achieved within neighbouring developments that devote more space to paved vehicular use.

Building heights have been strategically stepped from three to six storeys, to maximize privacy for adjacent neighbours and to respond to site topography. The building massing and architecture contribute to creating a strong gateway at the important intersection of Burnside Road West and Helmcken Road, marking a welcome to View Royal. The landscape at the corner includes a feature rain garden and a small plaza space that contribute to the public realm.

The project proposes a development density of 1.5 FSR, with 247 units, including one-bedroom, two-bedroom, and family-friendly three-bedroom units. With close proximity to shopping and services at Eagle Creek Village, new residents will have access to daily needs within walking distance. A new bus bay on Helmcken supports access to transit and connectivity to the Galloping Goose Regional Trail further supports alternate transportation. The project is also investing in Transportation Demand Management (TDM) strategies, including an e-bike rebate and car share program.

Aerial perspective rendering showing the proposed multi-building development and internal courtyard
Aerial perspective rendering showing the proposed multi-building development and internal courtyard
Page 257–271

Proposed Site Plan & Development Statistics

Detailed site plan layout showing building footprints, heights, and landscaping features
Detailed site plan layout showing building footprints, heights, and landscaping features

Development Data

Category Value
Site Area (sf) 148,120
Total Units 247
Units Per Hectare 179
Gross Floor Area (sf) 228,750
FAR 1.5
Coverage 33%
Height (ft) 64
Height (storeys) 3 - 6

Unit Type

Unit Type Count Percent
1-Bed (587 sf) 97 39%
2-Bed (878 sf) 138 56%
3-Bed (1,050 sf) 12 5%

Setbacks (m)

Setbacks (m) Required Minimum Proposed Minimum Proposed Average
Front (Helmcken) 7.5 10.5 16.2
Flanking (Burnside) 4.0 8.2 8.2
Side (West) 4.0 11.2 16.4
Side (North) 4.0 8.1 8.1
Page 257–271

Site Analysis: Impervious Surfaces vs. Green Space

Map comparing impervious surfaces (grey) to green space (green) within the project area
Map comparing impervious surfaces (grey) to green space (green) within the project area
Page 257–271

Perspective Rendering of Corner Gateway & Site Sections

Perspective sketch of the corner gateway showing modern buildings and landscaped plaza
Perspective sketch of the corner gateway showing modern buildings and landscaped plaza
Page 257–271

Aerial Perspective Rendering

Full aerial perspective rendering of the development within the existing urban context
Full aerial perspective rendering of the development within the existing urban context
Page 257–271

Site & Landscape Plan

Illustration of children playing in a large open green space
Illustration of children playing in a large open green space
Photograph of preserved mature trees and natural landscape
Photograph of preserved mature trees and natural landscape
Photograph of a preserved natural rock outcropping on the site
Photograph of a preserved natural rock outcropping on the site
Photograph of an internal courtyard area designed as a 'woonerf' shared space
Photograph of an internal courtyard area designed as a 'woonerf' shared space
Page 257–271

Landscape Site Sections

Cross-section drawing 1 "Section 1 Through Western Landscape" (Scale: 1:100)
Cross-section drawing 1 "Section 1 Through Western Landscape" (Scale: 1:100)
Cross-section drawing 2 "Section 2 Through Northern Landscape" (Scale: 1:100)
Cross-section drawing 2 "Section 2 Through Northern Landscape" (Scale: 1:100)
Page 257–271

Timeline

SUMMER 2018 Pre-Application

  • Site & Technical Analysis
  • Review of Planning Regulations/OCP
  • Initial Meetings with View Royal Staff
  • Conceptual Design

FALL 2018 Rezoning Application

  • Submission to View Royal
  • Technical review and feedback
  • Response to Staff comments

OCTOBER 23, 2018 Community Meeting Site Plan Version 1

NOVEMBER 13, 2018 Committee of the Whole

  • Concern about density
  • Concern about massing at the corner

WINTER 2018/2019 Site Plan Revisions

  • Site & Technical Analysis
  • Response to community and COTW comments

JANUARY 9, 2019 Hidden Oaks Resident Meeting Site Plan Version 2

SPRING/SUMMER 2019 Site Plan Revisions

  • Site plan revisions, response to community input

Committee of the Whole

  • Delegation, April 9, 2019

JULY 9, 2019 Community Meeting Site Plan Version 3

SEPTEMBER 17, 2019 Committee of the Whole

  • Withdrew application

NOVEMBER 18, 2019 Neighbours’ Workshop #1 Site & Landscape Design

DECEMBER 2, 2019 Neighbours’ Workshop #2 Site Plan Revisions

NOVEMBER/DECEMBER 2019 Site Plan Revisions

  • Site plan revisions, response to neighbours’ input
  • Site analysis, technical analysis
  • Preparation of new site plan

FEBRUARY 2, 2020 Community Meeting

Page 257–271

Next Steps

JANUARY - FEBRUARY 2020 Rezoning Application

  • Submission to View Royal
  • Technical review and feedback
  • Response to Staff comments

Committee of the Whole, February 11, 2020

SPRING 2020 Public Hearing

SUMMER 2020 Rezoning Final Adoption

FALL 2020 Development Permit Application

  • Submission to View Royal
  • The DP may run concurrently with the Rezoning, or could follow Final Adoption of the zoning.
  • Technical review and feedback
  • Response to Staff comments

FALL/WINTER 2020 Development Permit Approval

SPRING 2021 Building Permit

SPRING 2021 Construction Start

SPRING 2023 Construction Finish

Page 257–271
Extracted from: 2020 03 10 Committee of the Whole Agenda - Agenda - Pdf