Appendix A: Roadway Modification Queue Length Impacts
A diagram illustrating existing and estimated 2028 post-development queue lengths with proposed laning upgrades at Helmcken Rd and Burnside Rd.
APPENDIX A: ROADWAY MODIFICATION QUEUE LENGTH IMPACTS
Eagle Nest Helmcken Road Report
QUEUE LENGTHS (PM PEAK HOUR) EXISTING AND PROPOSED LANING HELMCKEN RD / BURNSIDE RD





EXISTING QUEUE LENGTHS
The first map illustrates current traffic queue conditions around the proposed development site at Helmcken Rd, Watkiss Way, and Burnside Rd.
ESTIMATED 2028 POST DEVELOPMENT QUEUE LENGTHS WITH PROPOSED LANING UPGRADES
The second map illustrates projected traffic queue conditions for the year 2028, incorporating background volume growth and additional traffic generated by the proposed development, alongside proposed roadway improvements.
Legend
- Red line: 95% QUEUE LENGTHS - EXISTING CONDITIONS
- Blue line: 95% QUEUE LENGTHS - PROPOSED LANE CHANGES WITH 2028 BACKGROUND VOLUMES
- Yellow line: ADDITIONAL QUEUE LENGTH DUE TO PROPOSED DEVELOPMENT TRAFFIC
Project Details
| Field | Description |
|---|---|
| Project Name | Eagle Nest |
| Title | QUEUE LENGTHS (PM PEAK HOUR) EXISTING AND PROPOSED LANING HELMCKEN RD / BURNSIDE RD |
| Project No. | 2497.B01 |
| Designed | TV |
| Drawn | TV |
| Date | MAR 27, 2019 |
| Scale | 1:2,500 |
These Design Documents are prepared solely for the use by the party with whom the Design Professional has entered into a contract, and there are no representations of any kind made by the Design Professional to any party with whom the Design Professional has not entered into contract.