Engineering concept plans for laning upgrades, including a second westbound through lane and pedestrian refuge, and a northbound left-turn lane.

9.2.3 a) Rezoning - 1449 Burnside Road West (Eagles Nest)
2nd WB Thru Lane with Pedestrian RefugeBurnside Rd NB LT LaneDate: March 12, 2019

Eagle Nest Helmcken Road Report

Page 477–479

APPENDIX B: ROADWAY MODIFICATIONS CONCEPT PLANS


Page 477–479

2ND WB THRU LANE W/ PED REFUGE HELMCKEN RD / WATKISS WAY

EAGLE NEST TIA

CONCEPT DESIGN ONLY - NOT FOR CONSTRUCTION

Project Information

Field Value
Designed TV
Drawn TV
Project No. 2497.B01
Date MAR 12, 2019
Scale 1:750

These Design Documents are prepared solely for the use by the party with whom the Design Professional has entered into a contract, and there are no representations of any kind made by the Design Professional to any party with whom the Design Professional has not entered into contract.

Aerial view segment showing the intersection of Helmcken Road and Chancellor Avenue
Aerial view segment showing the intersection of Helmcken Road and Chancellor Avenue
Aerial view segment of residential housing along Chancellor Avenue
Aerial view segment of residential housing along Chancellor Avenue
Aerial view segment of the Helmcken Road and Watkiss Way intersection
Aerial view segment of the Helmcken Road and Watkiss Way intersection
Aerial view segment showing the approach from Watkiss Way
Aerial view segment showing the approach from Watkiss Way
Aerial view segment of the eastern portion of Helmcken Road
Aerial view segment of the eastern portion of Helmcken Road
Detailed aerial view segment of the Watkiss Way and Helmcken Road intersection layout
Detailed aerial view segment of the Watkiss Way and Helmcken Road intersection layout

Page 477–479

BURNSIDE RD NB LT LANE BURNSIDE RD / HELMCKEN RD

EAGLE NEST TIA

CONCEPT DESIGN ONLY - NOT FOR CONSTRUCTION

Project Information

Field Value
Designed TV
Drawn TV
Project No. 2497.B01
Drawing No. S-2
Date NOV 15, 2018
Revision 0
Scale 1:500

These Design Documents are prepared solely for the use by the party with whom the Design Professional has entered into a contract, and there are no representations of any kind made by the Design Professional to any party with whom the Design Professional has not entered into contract.

Concept design plan for a northbound left turn lane on Burnside Road at the intersection with Helmcken Road
Concept design plan for a northbound left turn lane on Burnside Road at the intersection with Helmcken Road