Committee of the Whole/Documents/Attachment 6, APPENDIX E: POST DEVELOPMENT TRAFFIC CONDITIONS
Appendix

Attachment 6, APPENDIX E: POST DEVELOPMENT TRAFFIC CONDITIONS

March 10, 2020Pages 593–6097 sections

Traffic impact analysis evaluating intersection performance upon opening and at 10-year growth horizons with the proposed development traffic added.

9.2.3 b) Rezoning Application No. 2020/02 - 9 Erskine Lane
Includes Full Buildout and 2032 Post Development scenariosAnalyzes AM and PM peak periodsDate of analysis: 11-06-2019

APPENDIX E: POST DEVELOPMENT TRAFFIC CONDITIONS

9 Erskine Lane Development Traffic Impact Assessment

HCM 2010 TWSC

8: Erskine Ln/Stoneridge Dr & Watkiss Way 11-06-2019 9 Erskine Lane TIA 8:00 am 11-16-2018 2022 Opening Day AM w Full Buildout

Intersection Int Delay, s/veh: 6.3

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations $\uparrow$ $\uparrow$ $\uparrow$ $\uparrow$
Traffic Vol, veh/h 5 385 22 26 118 2 46 5 103 12 5 5
Future Vol, veh/h 5 385 22 26 118 2 46 5 103 12 5 5
Conflicting Peds, #/hr 1 0 7 7 0 1 4 0 2 2 0 4
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 63 85 63 33 79 50 67 60 85 46 63 42
Heavy Vehicles, % 0 2 0 0 1 0 0 0 0 0 0 0
Mvmt Flow 8 453 35 79 149 4 69 8 121 26 8 12
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 154 0 0 495 0 0 817 806 480 863 821 156
Stage 1 - - - - - - 494 494 - 310 310 -
Stage 2 - - - - - - 323 312 - 553 511 -
Critical Hdwy 4.1 - - 4.1 - - 7.1 6.5 6.2 7.1 6.5 6.2
Critical Hdwy Stg 1 - - - - - - 6.1 5.5 - 6.1 5.5 -
Critical Hdwy Stg 2 - - - - - - 6.1 5.5 - 6.1 5.5 -
Follow-up Hdwy 2.2 - - 2.2 - - 3.5 4 3.3 3.5 4 3.3
Pot Cap-1 Maneuver 1439 - - 1079 - - 298 318 590 277 312 895
Stage 1 - - - - - - 561 550 - 705 663 -
Stage 2 - - - - - - 693 661 - 521 540 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1438 - - 1072 - - 266 288 585 200 282 891
Mov Cap-2 Maneuver - - - - - - 266 288 - 200 282 -
Stage 1 - - - - - - 553 542 - 699 609 -
Stage 2 - - - - - - 618 607 - 403 532 -
Approach EB WB NB SB
HCM Control Delay, s 0.1 2.9 22.4 21.3
HCM LOS C C
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 401 1438 - - 1072 - - 267
HCM Lane V/C Ratio 0.494 0.006 - - 0.073 - - 0.172
HCM Control Delay (s) 22.4 7.5 0 - 8.6 0 - 21.3
HCM Lane LOS C A A - A A - C
HCM 95th %tile Q(veh) 2.7 0 - - 0.2 - - 0.6

Lanes, Volumes, Timings

11: Burnside Rd & Watkiss Way 11-06-2019 9 Erskine Lane TIA 8:00 am 11-16-2018 2022 Opening Day AM w Full Buildout

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations $\uparrow$ $\uparrow$ $\uparrow$ $\uparrow$ $\uparrow$
Traffic Volume (vph) 51 67 38 96 40 68 50 527 320 49 104 6
Future Volume (vph) 51 67 38 96 40 68 50 527 320 49 104 6
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor 0.99 0.99 1.00 0.97 1.00
Frt 0.970 0.966 0.850 0.991
Flt Protected 0.981 0.971 0.993 0.985
Satd. Flow (prot) 0 1771 0 0 1754 0 0 1870 1601 0 1836 0
Flt Permitted 0.792 0.712 0.925 0.750
Satd. Flow (perm) 0 1427 0 0 1283 0 0 1742 1550 0 1396 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 27 33 364 7
Link Speed (k/h) 50 50 50 50
Link Distance (m) 82.4 175.2 109.2 122.0
Travel Time (s) 5.9 12.6 7.9 8.8
Confl. Peds. (#/hr) 6 4 4 6 2 8 8 2
Confl. Bikes (#/hr) 25
Peak Hour Factor 0.60 0.78 0.80 0.53 0.84 0.87 0.52 0.96 0.88 0.83 0.88 0.50
Adj. Flow (vph) 85 86 48 181 48 78 96 549 364 59 118 12
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 219 0 0 307 0 0 645 364 0 189 0
Turn Type Perm NA Perm NA pm+pt NA Perm Perm NA
Protected Phases 4 8 5 2 6
Permitted Phases 4 8 2 2 6
Detector Phase 4 4 8 8 5 2 2 6 6
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 22.5 22.5 22.5 22.5 9.5 22.5 22.5 22.5 22.5
Total Split (s) 22.5 22.5 22.5 22.5 9.5 32.5 32.5 23.0 23.0
Total Split (%) 40.9% 40.9% 40.9% 40.9% 17.3% 59.1% 59.1% 41.8% 41.8%
Maximum Green (s) 18.0 18.0 18.0 18.0 5.0 28.0 28.0 18.5 18.5
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 4.5 4.5 4.5 4.5 4.5
Lead/Lag Lead Lag Lag
Lead-Lag Optimize? Yes Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None None None None None Max Max Max Max
Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0
Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0
Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0
Act Effct Green (s) 15.0 15.0 28.1 28.1 28.1
Actuated g/C Ratio 0.29 0.29 0.54 0.54 0.54
v/c Ratio 0.51 0.78 0.69 0.36 0.25
Control Delay 17.8 31.0 14.7 2.2 8.1
Queue Delay 0.0 0.0 0.0 0.0 0.0
Total Delay 17.8 31.0 14.7 2.2 8.1
Page 593–609
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
LOS B C B A A
Approach Delay 17.8 31.0 10.2 8.1
Approach LOS B C B A
Queue Length 50th (m) 14.5 23.0 43.8 0.0 8.9
Queue Length 95th (m) 24.8 #44.2 79.9 9.1 18.4
Internal Link Dist (m) 58.4 151.2 85.2 98.0
Turn Bay Length (m)
Base Capacity (vph) 512 466 938 1003 755
Starvation Cap Reductn 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0
Reduced v/c Ratio 0.43 0.66 0.69 0.36 0.25

Intersection Summary Area Type: Other Cycle Length: 55 Actuated Cycle Length: 52.2 Natural Cycle: 55 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.78 Intersection Signal Delay: 14.7 Intersection LOS: B Intersection Capacity Utilization 74.8% ICU Level of Service D Analysis Period (min) 15

95th percentile volume exceeds capacity, queue may be longer.

Queue shown is maximum after two cycles.

Page 593–609

MOVEMENT SUMMARY

Site: 101 [Watkiss Way / Hospital Access / Eagle Creek Access_2022AMPD] New Site Site Category: (None) Roundabout Processed: Wednesday, November 6, 2019 5:49:52 PM

Movement Performance - Vehicles

Mov ID Turn Demand Flows Deg. Satn v/c Average Delay sec Level of Service 95% Back of Queue Prop. Queued Effective Stop Rate Aver. No. Cycles Average Speed km/h
Total veh/h HV % Vehicles veh Distance m
South: Hospital Access
3 L2 16 0.0 0.120 7.0 LOS A 0.4 3.1 0.51 0.49 0.51 51.1
8 T1 8 0.0 0.120 7.0 LOS A 0.4 3.1 0.51 0.49 0.51 50.9
18 R2 44 22.6 0.120 8.3 LOS A 0.4 3.1 0.51 0.49 0.51 49.1
Approach 68 14.7 0.120 7.8 LOS A 0.4 3.1 0.51 0.49 0.51 49.7
East: Watkiss Way
1 L2 116 6.4 0.371 7.8 LOS A 1.7 13.6 0.31 0.19 0.31 50.9
6 T1 239 5.3 0.371 7.8 LOS A 1.7 13.6 0.31 0.19 0.31 50.8
16 R2 134 2.8 0.082 0.0 LOS A 0.0 0.0 0.00 0.00 0.00 56.8
Approach 489 4.9 0.371 5.7 LOS A 1.7 13.6 0.22 0.13 0.22 52.3
North: Eagle Creek Access
7 L2 66 2.2 0.271 7.9 LOS A 1.1 8.2 0.50 0.47 0.50 50.8
4 T1 30 0.0 0.271 7.8 LOS A 1.1 8.2 0.50 0.47 0.50 50.6
14 R2 108 1.5 0.271 7.9 LOS A 1.1 8.2 0.50 0.47 0.50 49.3
Approach 204 1.5 0.271 7.9 LOS A 1.1 8.2 0.50 0.47 0.50 50.0
West: Watkiss Way
5 L2 84 2.9 0.626 13.9 LOS B 6.4 50.5 0.60 0.62 0.86 47.6
2 T1 379 5.1 0.626 14.0 LOS B 6.4 50.5 0.60 0.62 0.86 47.4
12 R2 82 0.0 0.626 13.8 LOS B 6.4 50.5 0.60 0.62 0.86 46.3
Approach 545 4.0 0.626 13.9 LOS B 6.4 50.5 0.60 0.62 0.86 47.3
All Vehicles 1306 4.5 0.626 9.6 LOS A 6.4 50.5 0.44 0.41 0.55 49.6

Site Level of Service (LOS) Method: Delay & v/c (HCM 6). Site LOS Method is specified in the Parameter Settings dialog (Site tab). Roundabout LOS Method: Same as Signalised Intersections. Vehicle movement LOS values are based on average delay and v/c ratio (degree of saturation) per movement. LOS F will result if v/c > 1 irrespective of movement delay value (does not apply for approaches and intersection). Intersection and Approach LOS values are based on average delay for all movements (v/c not used as specified in HCM 6). Roundabout Capacity Model: US HCM 2010. HCM Delay Formula option is used. Control Delay does not include Geometric Delay since Exclude Geometric Delay option applies. Gap-Acceptance Capacity: Traditional M1. HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.

HCM 2010 TWSC

8: Erskine Ln/Stoneridge Dr & Watkiss Way 11-06-2019 9 Erskine Lane TIA 4:00 pm 11-16-2018 2022 Opening Day PM w Full Buildout

Intersection Int Delay, s/veh: 4.8

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations $\uparrow$ $\uparrow$ $\uparrow$ $\uparrow$
Traffic Vol, veh/h 4 198 59 86 163 11 24 5 65 11 5 1
Future Vol, veh/h 4 198 59 86 163 11 24 5 65 11 5 1
Conflicting Peds, #/hr 5 0 4 4 0 5 1 0 4 4 0 1
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 33 83 40 75 95 63 38 63 92 63 63 25
Heavy Vehicles, % 0 2 0 0 1 0 0 0 0 0 0 0
Mvmt Flow 12 239 148 115 172 17 63 8 71 17 8 4
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 194 0 0 391 0 0 759 765 321 797 831 187
Stage 1 - - - - - - 341 341 - 416 416 -
Stage 2 - - - - - - 418 424 - 381 415 -
Critical Hdwy 4.1 - - 4.1 - - 7.1 6.5 6.2 7.1 6.5 6.2
Critical Hdwy Stg 1 - - - - - - 6.1 5.5 - 6.1 5.5 -
Critical Hdwy Stg 2 - - - - - - 6.1 5.5 - 6.1 5.5 -
Follow-up Hdwy 2.2 - - 2.2 - - 3.5 4 3.3 3.5 4 3.3
Pot Cap-1 Maneuver 1391 - - 1179 - - 326 336 724 307 307 860
Stage 1 - - - - - - 678 642 - 618 595 -
Stage 2 - - - - - - 616 590 - 645 596 -
Mov Cap-1 Maneuver 1385 - - 1175 - - 287 293 719 244 268 855
Mov Cap-2 Maneuver - - - - - - 287 293 - 244 268 -
Stage 1 - - - - - - 668 632 - 608 527 -
Stage 2 - - - - - - 537 523 - 566 587 -
Approach EB WB NB SB
HCM Control Delay, s 0.2 3.2 18.3 19.5
HCM LOS C C
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 410 1385 - - 1175 - - 278
HCM Lane V/C Ratio 0.346 0.009 - - 0.098 - - 0.106
HCM Control Delay (s) 18.3 7.6 0 - 8.4 0 - 19.5
HCM Lane LOS C A A - A A - C
HCM 95th %tile Q(veh) 1.5 0 - - 0.3 - - 0.4

Lanes, Volumes, Timings

11: Burnside Rd & Watkiss Way 11-06-2019 9 Erskine Lane TIA 4:00 pm 11-16-2018 2022 Opening Day PM w Full Buildout

Page 593–609
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations $\uparrow$ $\uparrow$ $\uparrow$ $\uparrow$ $\uparrow$
Traffic Volume (vph) 14 49 39 129 54 41 97 233 148 48 433 40
Future Volume (vph) 14 49 39 129 54 41 97 233 148 48 433 40
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor 0.94 0.99 1.00 0.97 1.00
Frt 0.937 0.973 0.850 0.989
Flt Protected 0.994 0.975 0.987 0.994
Satd. Flow (prot) 0 1654 0 0 1777 0 0 1859 1601 0 1848 0
Flt Permitted 0.951 0.795 0.750 0.914
Satd. Flow (perm) 0 1582 0 0 1439 0 0 1412 1557 0 1699 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 61 19 174 9
Peak Hour Factor 0.81 0.94 0.64 0.91 0.66 0.75 0.89 0.80 0.85 0.64 0.85 0.79
Adj. Flow (vph) 17 52 61 142 82 55 109 291 174 75 509 51
Lane Group Flow (vph) 0 130 0 0 279 0 0 400 174 0 635 0
Turn Type Perm NA Perm NA pm+pt NA Perm Perm NA
Protected Phases 4 8 5 2 6
Permitted Phases 4 8 2 2 6
Detector Phase 4 4 8 8 5 2 2 6 6
Total Split (s) 22.5 22.5 22.5 22.5 9.5 42.5 42.5 33.0 33.0
Total Split (%) 34.6% 34.6% 34.6% 34.6% 14.6% 65.4% 65.4% 50.8% 50.8%
Act Effct Green (s) 15.2 15.2 38.9 38.9 38.9
v/c Ratio 0.30 0.77 0.46 0.17 0.61
Control Delay 13.0 36.1 9.3 1.6 11.1
Total Delay 13.0 36.1 9.3 1.6 11.1
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
LOS B D A A B
Approach Delay 13.0 36.1 7.0 11.1
Approach LOS B D A B
Queue Length 50th (m) 6.2 27.7 23.5 0.0 41.8
Queue Length 95th (m) 17.8 33.0 36.1 5.3 66.5
Base Capacity (vph) 495 425 869 1025 1049
Reduced v/c Ratio 0.26 0.66 0.46 0.17 0.61

Intersection Summary Area Type: Other Cycle Length: 65 Actuated Cycle Length: 63.1 Natural Cycle: 65 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.77 Intersection Signal Delay: 14.1 Intersection LOS: B Intersection Capacity Utilization 76.0% ICU Level of Service D

Page 593–609

MOVEMENT SUMMARY

Site: 101 [Watkiss Way / Hospital Access / Eagle Creek Access_2022PMPD] New Site Roundabout Processed: Wednesday, November 6, 2019 5:49:55 PM

Movement Performance - Vehicles

Mov ID Turn Demand Flows Deg. Satn v/c Average Delay sec Level of Service 95% Back of Queue Prop. Queued Effective Stop Rate Aver. No. Cycles Average Speed km/h
Total veh/h HV % Vehicles veh Distance m
South: Hospital Access
3 L2 45 0.0 0.617 17.2 LOS B 4.9 37.5 0.75 0.95 1.32 45.7
8 T1 86 0.0 0.617 17.2 LOS B 4.9 37.5 0.75 0.95 1.32 45.5
18 R2 268 0.0 0.617 17.2 LOS B 4.9 37.5 0.75 0.95 1.32 44.5
Approach 400 0.0 0.617 17.2 LOS B 4.9 37.5 0.75 0.95 1.32 44.8
East: Watkiss Way
1 L2 38 0.0 0.360 7.6 LOS A 1.7 13.0 0.36 0.24 0.36 52.0
6 T1 280 3.8 0.360 7.8 LOS A 1.7 13.0 0.36 0.24 0.36 51.7
16 R2 194 0.0 0.360 0.9 LOS A 1.7 13.0 0.04 0.03 0.04 56.1
Approach 513 2.1 0.360 5.1 LOS A 1.7 13.0 0.24 0.16 0.24 53.2
North: Eagle Creek Access
7 L2 148 1.0 0.513 12.0 LOS B 3.6 27.4 0.62 0.71 0.87 48.0
4 T1 30 0.0 0.513 12.0 LOS B 3.6 27.4 0.62 0.71 0.87 47.8
14 R2 219 0.0 0.513 12.0 LOS B 3.6 27.4 0.62 0.71 0.87 46.6
Approach 397 0.4 0.513 12.0 LOS B 3.6 27.4 0.62 0.71 0.87 47.2
West: Watkiss Way
5 L2 16 0.0 0.522 10.9 LOS B 3.0 23.6 0.52 0.43 0.54 49.9
2 T1 377 3.2 0.522 11.1 LOS B 3.0 23.6 0.52 0.43 0.54 49.7
12 R2 69 0.0 0.522 10.9 LOS B 3.0 23.6 0.52 0.43 0.54 48.4
Approach 462 2.6 0.522 11.0 LOS B 3.0 23.6 0.52 0.43 0.54 49.5
All Vehicles 1771 1.4 0.617 10.9 LOS B 4.9 37.5 0.51 0.53 0.70 48.8

HCM 2010 TWSC

8: Erskine Ln/Stoneridge Dr & Watkiss Way 11-06-2019 9 Erskine Lane TIA 8:00 am 11-16-2018 2032 Post Development AM

Intersection Int Delay, s/veh: 8.2

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations $\uparrow$ $\uparrow$ $\uparrow$ $\uparrow$
Traffic Vol, veh/h 6 470 23 27 144 3 48 6 107 14 6 6
Future Vol, veh/h 6 470 23 27 144 3 48 6 107 14 6 6
Conflicting Peds, #/hr 1 0 7 7 0 1 4 0 2 2 0 4
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
Mvmt Flow 10 553 37 82 182 6 72 10 126 30 10 14
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 189 0 0 597 0 0 964 952 581 1012 967 190
Stage 1 - - - - - - 599 599 - 350 350 -
Stage 2 - - - - - - 365 353 - 662 617 -
Critical Hdwy 4.1 - - 4.1 - - 7.1 6.5 6.2 7.1 6.5 6.2
Pot Cap-1 Maneuver 1397 - - 989 - - 237 261 517 220 256 857
Mov Cap-1 Maneuver 1396 - - 983 - - 206 233 513 148 228 853
Mov Cap-2 Maneuver - - - - - - 206 233 - 148 228 -
Approach EB WB NB SB
HCM Control Delay, s 0.1 2.7 33.5 28.8
HCM LOS D D
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 326 1396 - - 983 - - 205
HCM Lane V/C Ratio 0.637 0.007 - - 0.083 - - 0.265
HCM Control Delay (s) 33.5 7.6 0 - 9 0 - 28.8
HCM Lane LOS D A A - A A - D
HCM 95th %tile Q(veh) 4.1 0 - - 0.3 - - 1

Lanes, Volumes, Timings

11: Burnside Rd & Watkiss Way 11-06-2019 9 Erskine Lane TIA 8:00 am 11-16-2018 2032 Post Development AM

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations $\uparrow$ $\uparrow$ $\uparrow$ $\uparrow$ $\uparrow$
Traffic Volume (vph) 62 81 47 112 49 80 61 643 387 59 127 8
Future Volume (vph) 62 81 47 112 49 80 61 643 387 59 127 8
Adj. Flow (vph) 103 104 59 211 58 92 117 670 440 71 144 16
Lane Group Flow (vph) 0 266 0 0 361 0 0 787 440 0 231 0
Turn Type Perm NA Perm NA pm+pt NA Perm Perm NA
Total Split (s) 26.0 26.0 26.0 26.0 9.5 39.0 39.0 29.5 29.5
Total Split (%) 40.0% 40.0% 40.0% 40.0% 14.6% 60.0% 60.0% 45.4% 45.4%
Act Effct Green (s) 20.3 20.3 34.5 34.5 34.5
v/c Ratio 0.58 0.91 0.85 0.42 0.43
Control Delay 22.5 49.8 24.2 2.4 12.1
Total Delay 22.5 49.8 24.2 2.4 12.1
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
LOS C D C A B
Approach Delay 22.5 49.8 16.4 12.1
Approach LOS C D B B
Queue Length 50th (m) 23.4 37.3 75.4 0.0 15.0
Queue Length 95th (m) 36.0 #73.6 #144.7 10.1 29.6
Base Capacity (vph) 482 420 929 1039 537
Reduced v/c Ratio 0.55 0.86 0.85 0.42 0.43

Intersection Summary Maximum v/c Ratio: 0.91 Intersection Signal Delay: 22.5 Intersection LOS: C Intersection Capacity Utilization 84.7% ICU Level of Service E

Page 593–609

MOVEMENT SUMMARY

Site: 101 [Watkiss Way / Hospital Access / Eagle Creek Access_2032AMPD] New Site Roundabout Processed: Wednesday, November 6, 2019 5:49:53 PM

Movement Performance - Vehicles

Mov ID Turn Demand Flows Deg. Satn v/c Average Delay sec Level of Service 95% Back of Queue Prop. Queued Effective Stop Rate Aver. No. Cycles Average Speed km/h
Total veh/h HV % Vehicles veh Distance m
South: Hospital Access
Approach 85 11.8 0.160 8.9 LOS A 0.5 4.1 0.56 0.56 0.56 49.1
East: Watkiss Way
Approach 592 4.0 0.453 6.7 LOS A 2.3 18.4 0.27 0.18 0.27 51.6
North: Eagle Creek Access
Approach 251 1.2 0.359 9.8 LOS A 1.5 11.9 0.58 0.59 0.61 48.8
West: Watkiss Way
Approach 644 3.4 0.769 20.9 LOS C 14.0 109.6 0.79 1.09 1.61 43.4
All Vehicles 1571 3.7 0.769 13.1 LOS B 14.0 109.6 0.55 0.64 0.89 47.4

HCM 2010 TWSC

8: Erskine Ln/Stoneridge Dr & Watkiss Way 11-06-2019 9 Erskine Lane TIA 4:00 pm 11-16-2018 2032 Post Development PM

Intersection Int Delay, s/veh: 5.4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations $\uparrow$ $\uparrow$ $\uparrow$ $\uparrow$
Traffic Vol, veh/h 5 242 61 90 199 13 25 6 67 13 6 1
Future Vol, veh/h 5 242 61 90 199 13 25 6 67 13 6 1
Mvmt Flow 15 292 153 120 209 21 66 10 73 21 10 4
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 235 0 0 449 0 0 871 878 377 909 944 226
Stage 1 - - - - - - 403 403 - 465 465 -
Stage 2 - - - - - - 468 475 - 444 479 -
Critical Hdwy 4.1 - - 4.1 - - 7.1 6.5 6.2 7.1 6.5 6.2
Pot Cap-1 Maneuver 1344 - - 1122 - - 274 289 674 258 264 818
Mov Cap-1 Maneuver 1338 - - 1118 - - 235 247 669 198 226 813
Mov Cap-2 Maneuver - - - - - - 235 247 - 198 226 -
Approach EB WB NB SB
HCM Control Delay, s 0.3 3 22.9 23.7
HCM LOS C C
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 347 1338 - - 1118 - - 226
HCM Lane V/C Ratio 0.427 0.011 - - 0.107 - - 0.151
HCM Control Delay (s) 22.9 7.7 0 - 8.6 0 - 23.7
HCM Lane LOS C A A - A A - C
HCM 95th %tile Q(veh) 2.1 0 - - 0.4 - - 0.5

Lanes, Volumes, Timings

11: Burnside Rd & Watkiss Way 11-06-2019 9 Erskine Lane TIA 4:00 pm 11-16-2018 2032 Post Development PM

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations $\uparrow$ $\uparrow$ $\uparrow$ $\uparrow$ $\uparrow$
Traffic Volume (vph) 17 60 48 153 69 49 118 285 172 57 528 49
Future Volume (vph) 17 60 48 153 69 49 118 285 172 57 528 49
Adj. Flow (vph) 21 64 75 168 105 65 133 356 202 89 621 62
Lane Group Flow (vph) 0 160 0 0 338 0 0 489 202 0 772 0
Total Split (s) 22.5 22.5 22.5 22.5 9.5 42.5 42.5 33.0 33.0
Total Split (%) 34.6% 34.6% 34.6% 34.6% 14.6% 65.4% 65.4% 50.8% 50.8%
Act Effct Green (s) 17.1 17.1 38.0 38.0 38.0
v/c Ratio 0.34 0.89 0.63 0.20 0.78
Control Delay 13.6 49.1 13.4 1.6 17.4
Total Delay 13.6 49.1 13.4 1.6 17.4
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
LOS B D B A B
Approach Delay 13.6 49.1 9.9 17.4
Approach LOS B D A B
Queue Length 50th (m) 8.5 36.4 34.6 0.0 62.8
Queue Length 95th (m) 21.8 41.6 50.4 5.7 96.0
Base Capacity (vph) 489 400 777 1005 992
Reduced v/c Ratio 0.33 0.84 0.63 0.20 0.78

Intersection Summary Maximum v/c Ratio: 0.89 Intersection Signal Delay: 19.9 Intersection LOS: B Intersection Capacity Utilization 88.5% ICU Level of Service E

Page 593–609

MOVEMENT SUMMARY

Site: 101 [Watkiss Way / Hospital Access / Eagle Creek Access_2032PMPD] New Site Roundabout Processed: Wednesday, November 6, 2019 5:49:56 PM

Movement Performance - Vehicles

Mov ID Turn Demand Flows Deg. Satn v/c Average Delay sec Level of Service 95% Back of Queue Prop. Queued Effective Stop Rate Aver. No. Cycles Average Speed km/h
Total veh/h HV % Vehicles veh Distance m
South: Hospital Access
Approach 488 0.0 0.835 34.0 LOS C 10.7 81.0 0.91 1.40 2.37 37.2
East: Watkiss Way
Approach 604 1.7 0.433 6.0 LOS A 2.2 16.8 0.28 0.21 0.28 52.6
North: Eagle Creek Access
Approach 482 0.3 0.661 17.3 LOS B 6.7 51.3 0.75 0.99 1.38 44.2
West: Watkiss Way
Approach 548 2.2 0.647 14.9 LOS B 7.5 57.8 0.66 0.77 1.07 47.0
All Vehicles 2122 1.1 0.835 17.3 LOS B 10.7 81.0 0.63 0.81 1.21 45.0