Attachment 6, APPENDIX E: POST DEVELOPMENT TRAFFIC CONDITIONS
Traffic impact analysis evaluating intersection performance upon opening and at 10-year growth horizons with the proposed development traffic added.
APPENDIX E: POST DEVELOPMENT TRAFFIC CONDITIONS
9 Erskine Lane Development Traffic Impact Assessment
HCM 2010 TWSC
8: Erskine Ln/Stoneridge Dr & Watkiss Way 11-06-2019 9 Erskine Lane TIA 8:00 am 11-16-2018 2022 Opening Day AM w Full Buildout
Intersection Int Delay, s/veh: 6.3
| Movement | EBL | EBT | EBR | WBL | WBT | WBR | NBL | NBT | NBR | SBL | SBT | SBR |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Lane Configurations | $\uparrow$ | $\uparrow$ | $\uparrow$ | $\uparrow$ | ||||||||
| Traffic Vol, veh/h | 5 | 385 | 22 | 26 | 118 | 2 | 46 | 5 | 103 | 12 | 5 | 5 |
| Future Vol, veh/h | 5 | 385 | 22 | 26 | 118 | 2 | 46 | 5 | 103 | 12 | 5 | 5 |
| Conflicting Peds, #/hr | 1 | 0 | 7 | 7 | 0 | 1 | 4 | 0 | 2 | 2 | 0 | 4 |
| Sign Control | Free | Free | Free | Free | Free | Free | Stop | Stop | Stop | Stop | Stop | Stop |
| RT Channelized | - | - | None | - | - | None | - | - | None | - | - | None |
| Storage Length | - | - | - | - | - | - | - | - | - | - | - | - |
| Veh in Median Storage, # | - | 0 | - | - | 0 | - | - | 0 | - | - | 0 | - |
| Grade, % | - | 0 | - | - | 0 | - | - | 0 | - | - | 0 | - |
| Peak Hour Factor | 63 | 85 | 63 | 33 | 79 | 50 | 67 | 60 | 85 | 46 | 63 | 42 |
| Heavy Vehicles, % | 0 | 2 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Mvmt Flow | 8 | 453 | 35 | 79 | 149 | 4 | 69 | 8 | 121 | 26 | 8 | 12 |
| Major/Minor | Major1 | Major2 | Minor1 | Minor2 | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Conflicting Flow All | 154 | 0 | 0 | 495 | 0 | 0 | 817 | 806 | 480 | 863 | 821 | 156 |
| Stage 1 | - | - | - | - | - | - | 494 | 494 | - | 310 | 310 | - |
| Stage 2 | - | - | - | - | - | - | 323 | 312 | - | 553 | 511 | - |
| Critical Hdwy | 4.1 | - | - | 4.1 | - | - | 7.1 | 6.5 | 6.2 | 7.1 | 6.5 | 6.2 |
| Critical Hdwy Stg 1 | - | - | - | - | - | - | 6.1 | 5.5 | - | 6.1 | 5.5 | - |
| Critical Hdwy Stg 2 | - | - | - | - | - | - | 6.1 | 5.5 | - | 6.1 | 5.5 | - |
| Follow-up Hdwy | 2.2 | - | - | 2.2 | - | - | 3.5 | 4 | 3.3 | 3.5 | 4 | 3.3 |
| Pot Cap-1 Maneuver | 1439 | - | - | 1079 | - | - | 298 | 318 | 590 | 277 | 312 | 895 |
| Stage 1 | - | - | - | - | - | - | 561 | 550 | - | 705 | 663 | - |
| Stage 2 | - | - | - | - | - | - | 693 | 661 | - | 521 | 540 | - |
| Platoon blocked, % | - | - | - | - | ||||||||
| Mov Cap-1 Maneuver | 1438 | - | - | 1072 | - | - | 266 | 288 | 585 | 200 | 282 | 891 |
| Mov Cap-2 Maneuver | - | - | - | - | - | - | 266 | 288 | - | 200 | 282 | - |
| Stage 1 | - | - | - | - | - | - | 553 | 542 | - | 699 | 609 | - |
| Stage 2 | - | - | - | - | - | - | 618 | 607 | - | 403 | 532 | - |
| Approach | EB | WB | NB | SB |
|---|---|---|---|---|
| HCM Control Delay, s | 0.1 | 2.9 | 22.4 | 21.3 |
| HCM LOS | C | C |
| Minor Lane/Major Mvmt | NBLn1 | EBL | EBT | EBR | WBL | WBT | WBR | SBLn1 |
|---|---|---|---|---|---|---|---|---|
| Capacity (veh/h) | 401 | 1438 | - | - | 1072 | - | - | 267 |
| HCM Lane V/C Ratio | 0.494 | 0.006 | - | - | 0.073 | - | - | 0.172 |
| HCM Control Delay (s) | 22.4 | 7.5 | 0 | - | 8.6 | 0 | - | 21.3 |
| HCM Lane LOS | C | A | A | - | A | A | - | C |
| HCM 95th %tile Q(veh) | 2.7 | 0 | - | - | 0.2 | - | - | 0.6 |
Lanes, Volumes, Timings
11: Burnside Rd & Watkiss Way 11-06-2019 9 Erskine Lane TIA 8:00 am 11-16-2018 2022 Opening Day AM w Full Buildout
| Lane Group | EBL | EBT | EBR | WBL | WBT | WBR | NBL | NBT | NBR | SBL | SBT | SBR |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Lane Configurations | $\uparrow$ | $\uparrow$ | $\uparrow$ | $\uparrow$ | $\uparrow$ | |||||||
| Traffic Volume (vph) | 51 | 67 | 38 | 96 | 40 | 68 | 50 | 527 | 320 | 49 | 104 | 6 |
| Future Volume (vph) | 51 | 67 | 38 | 96 | 40 | 68 | 50 | 527 | 320 | 49 | 104 | 6 |
| Ideal Flow (vphpl) | 1900 | 1900 | 1900 | 1900 | 1900 | 1900 | 1900 | 1900 | 1900 | 1900 | 1900 | 1900 |
| Lane Util. Factor | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 |
| Ped Bike Factor | 0.99 | 0.99 | 1.00 | 0.97 | 1.00 | |||||||
| Frt | 0.970 | 0.966 | 0.850 | 0.991 | ||||||||
| Flt Protected | 0.981 | 0.971 | 0.993 | 0.985 | ||||||||
| Satd. Flow (prot) | 0 | 1771 | 0 | 0 | 1754 | 0 | 0 | 1870 | 1601 | 0 | 1836 | 0 |
| Flt Permitted | 0.792 | 0.712 | 0.925 | 0.750 | ||||||||
| Satd. Flow (perm) | 0 | 1427 | 0 | 0 | 1283 | 0 | 0 | 1742 | 1550 | 0 | 1396 | 0 |
| Right Turn on Red | Yes | Yes | Yes | Yes | ||||||||
| Satd. Flow (RTOR) | 27 | 33 | 364 | 7 | ||||||||
| Link Speed (k/h) | 50 | 50 | 50 | 50 | ||||||||
| Link Distance (m) | 82.4 | 175.2 | 109.2 | 122.0 | ||||||||
| Travel Time (s) | 5.9 | 12.6 | 7.9 | 8.8 | ||||||||
| Confl. Peds. (#/hr) | 6 | 4 | 4 | 6 | 2 | 8 | 8 | 2 | ||||
| Confl. Bikes (#/hr) | 25 | |||||||||||
| Peak Hour Factor | 0.60 | 0.78 | 0.80 | 0.53 | 0.84 | 0.87 | 0.52 | 0.96 | 0.88 | 0.83 | 0.88 | 0.50 |
| Adj. Flow (vph) | 85 | 86 | 48 | 181 | 48 | 78 | 96 | 549 | 364 | 59 | 118 | 12 |
| Shared Lane Traffic (%) | ||||||||||||
| Lane Group Flow (vph) | 0 | 219 | 0 | 0 | 307 | 0 | 0 | 645 | 364 | 0 | 189 | 0 |
| Turn Type | Perm | NA | Perm | NA | pm+pt | NA | Perm | Perm | NA | |||
| Protected Phases | 4 | 8 | 5 | 2 | 6 | |||||||
| Permitted Phases | 4 | 8 | 2 | 2 | 6 | |||||||
| Detector Phase | 4 | 4 | 8 | 8 | 5 | 2 | 2 | 6 | 6 | |||
| Switch Phase | ||||||||||||
| Minimum Initial (s) | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 | |||
| Minimum Split (s) | 22.5 | 22.5 | 22.5 | 22.5 | 9.5 | 22.5 | 22.5 | 22.5 | 22.5 | |||
| Total Split (s) | 22.5 | 22.5 | 22.5 | 22.5 | 9.5 | 32.5 | 32.5 | 23.0 | 23.0 | |||
| Total Split (%) | 40.9% | 40.9% | 40.9% | 40.9% | 17.3% | 59.1% | 59.1% | 41.8% | 41.8% | |||
| Maximum Green (s) | 18.0 | 18.0 | 18.0 | 18.0 | 5.0 | 28.0 | 28.0 | 18.5 | 18.5 | |||
| Yellow Time (s) | 3.5 | 3.5 | 3.5 | 3.5 | 3.5 | 3.5 | 3.5 | 3.5 | 3.5 | |||
| All-Red Time (s) | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | |||
| Lost Time Adjust (s) | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | |||||||
| Total Lost Time (s) | 4.5 | 4.5 | 4.5 | 4.5 | 4.5 | |||||||
| Lead/Lag | Lead | Lag | Lag | |||||||||
| Lead-Lag Optimize? | Yes | Yes | Yes | |||||||||
| Vehicle Extension (s) | 3.0 | 3.0 | 3.0 | 3.0 | 3.0 | 3.0 | 3.0 | 3.0 | 3.0 | |||
| Recall Mode | None | None | None | None | None | Max | Max | Max | Max | |||
| Walk Time (s) | 7.0 | 7.0 | 7.0 | 7.0 | 7.0 | 7.0 | 7.0 | 7.0 | ||||
| Flash Dont Walk (s) | 11.0 | 11.0 | 11.0 | 11.0 | 11.0 | 11.0 | 11.0 | 11.0 | ||||
| Pedestrian Calls (#/hr) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| Act Effct Green (s) | 15.0 | 15.0 | 28.1 | 28.1 | 28.1 | |||||||
| Actuated g/C Ratio | 0.29 | 0.29 | 0.54 | 0.54 | 0.54 | |||||||
| v/c Ratio | 0.51 | 0.78 | 0.69 | 0.36 | 0.25 | |||||||
| Control Delay | 17.8 | 31.0 | 14.7 | 2.2 | 8.1 | |||||||
| Queue Delay | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | |||||||
| Total Delay | 17.8 | 31.0 | 14.7 | 2.2 | 8.1 |
| Lane Group | EBL | EBT | EBR | WBL | WBT | WBR | NBL | NBT | NBR | SBL | SBT | SBR |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| LOS | B | C | B | A | A | |||||||
| Approach Delay | 17.8 | 31.0 | 10.2 | 8.1 | ||||||||
| Approach LOS | B | C | B | A | ||||||||
| Queue Length 50th (m) | 14.5 | 23.0 | 43.8 | 0.0 | 8.9 | |||||||
| Queue Length 95th (m) | 24.8 | #44.2 | 79.9 | 9.1 | 18.4 | |||||||
| Internal Link Dist (m) | 58.4 | 151.2 | 85.2 | 98.0 | ||||||||
| Turn Bay Length (m) | ||||||||||||
| Base Capacity (vph) | 512 | 466 | 938 | 1003 | 755 | |||||||
| Starvation Cap Reductn | 0 | 0 | 0 | 0 | 0 | |||||||
| Spillback Cap Reductn | 0 | 0 | 0 | 0 | 0 | |||||||
| Storage Cap Reductn | 0 | 0 | 0 | 0 | 0 | |||||||
| Reduced v/c Ratio | 0.43 | 0.66 | 0.69 | 0.36 | 0.25 |
Intersection Summary Area Type: Other Cycle Length: 55 Actuated Cycle Length: 52.2 Natural Cycle: 55 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.78 Intersection Signal Delay: 14.7 Intersection LOS: B Intersection Capacity Utilization 74.8% ICU Level of Service D Analysis Period (min) 15
95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
MOVEMENT SUMMARY
Site: 101 [Watkiss Way / Hospital Access / Eagle Creek Access_2022AMPD] New Site Site Category: (None) Roundabout Processed: Wednesday, November 6, 2019 5:49:52 PM
Movement Performance - Vehicles
| Mov ID | Turn | Demand Flows | Deg. Satn v/c | Average Delay sec | Level of Service | 95% Back of Queue | Prop. Queued | Effective Stop Rate | Aver. No. Cycles | Average Speed km/h | ||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Total veh/h | HV % | Vehicles veh | Distance m | |||||||||
| South: Hospital Access | ||||||||||||
| 3 | L2 | 16 | 0.0 | 0.120 | 7.0 | LOS A | 0.4 | 3.1 | 0.51 | 0.49 | 0.51 | 51.1 |
| 8 | T1 | 8 | 0.0 | 0.120 | 7.0 | LOS A | 0.4 | 3.1 | 0.51 | 0.49 | 0.51 | 50.9 |
| 18 | R2 | 44 | 22.6 | 0.120 | 8.3 | LOS A | 0.4 | 3.1 | 0.51 | 0.49 | 0.51 | 49.1 |
| Approach | 68 | 14.7 | 0.120 | 7.8 | LOS A | 0.4 | 3.1 | 0.51 | 0.49 | 0.51 | 49.7 | |
| East: Watkiss Way | ||||||||||||
| 1 | L2 | 116 | 6.4 | 0.371 | 7.8 | LOS A | 1.7 | 13.6 | 0.31 | 0.19 | 0.31 | 50.9 |
| 6 | T1 | 239 | 5.3 | 0.371 | 7.8 | LOS A | 1.7 | 13.6 | 0.31 | 0.19 | 0.31 | 50.8 |
| 16 | R2 | 134 | 2.8 | 0.082 | 0.0 | LOS A | 0.0 | 0.0 | 0.00 | 0.00 | 0.00 | 56.8 |
| Approach | 489 | 4.9 | 0.371 | 5.7 | LOS A | 1.7 | 13.6 | 0.22 | 0.13 | 0.22 | 52.3 | |
| North: Eagle Creek Access | ||||||||||||
| 7 | L2 | 66 | 2.2 | 0.271 | 7.9 | LOS A | 1.1 | 8.2 | 0.50 | 0.47 | 0.50 | 50.8 |
| 4 | T1 | 30 | 0.0 | 0.271 | 7.8 | LOS A | 1.1 | 8.2 | 0.50 | 0.47 | 0.50 | 50.6 |
| 14 | R2 | 108 | 1.5 | 0.271 | 7.9 | LOS A | 1.1 | 8.2 | 0.50 | 0.47 | 0.50 | 49.3 |
| Approach | 204 | 1.5 | 0.271 | 7.9 | LOS A | 1.1 | 8.2 | 0.50 | 0.47 | 0.50 | 50.0 | |
| West: Watkiss Way | ||||||||||||
| 5 | L2 | 84 | 2.9 | 0.626 | 13.9 | LOS B | 6.4 | 50.5 | 0.60 | 0.62 | 0.86 | 47.6 |
| 2 | T1 | 379 | 5.1 | 0.626 | 14.0 | LOS B | 6.4 | 50.5 | 0.60 | 0.62 | 0.86 | 47.4 |
| 12 | R2 | 82 | 0.0 | 0.626 | 13.8 | LOS B | 6.4 | 50.5 | 0.60 | 0.62 | 0.86 | 46.3 |
| Approach | 545 | 4.0 | 0.626 | 13.9 | LOS B | 6.4 | 50.5 | 0.60 | 0.62 | 0.86 | 47.3 | |
| All Vehicles | 1306 | 4.5 | 0.626 | 9.6 | LOS A | 6.4 | 50.5 | 0.44 | 0.41 | 0.55 | 49.6 |
Site Level of Service (LOS) Method: Delay & v/c (HCM 6). Site LOS Method is specified in the Parameter Settings dialog (Site tab). Roundabout LOS Method: Same as Signalised Intersections. Vehicle movement LOS values are based on average delay and v/c ratio (degree of saturation) per movement. LOS F will result if v/c > 1 irrespective of movement delay value (does not apply for approaches and intersection). Intersection and Approach LOS values are based on average delay for all movements (v/c not used as specified in HCM 6). Roundabout Capacity Model: US HCM 2010. HCM Delay Formula option is used. Control Delay does not include Geometric Delay since Exclude Geometric Delay option applies. Gap-Acceptance Capacity: Traditional M1. HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
HCM 2010 TWSC
8: Erskine Ln/Stoneridge Dr & Watkiss Way 11-06-2019 9 Erskine Lane TIA 4:00 pm 11-16-2018 2022 Opening Day PM w Full Buildout
Intersection Int Delay, s/veh: 4.8
| Movement | EBL | EBT | EBR | WBL | WBT | WBR | NBL | NBT | NBR | SBL | SBT | SBR |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Lane Configurations | $\uparrow$ | $\uparrow$ | $\uparrow$ | $\uparrow$ | ||||||||
| Traffic Vol, veh/h | 4 | 198 | 59 | 86 | 163 | 11 | 24 | 5 | 65 | 11 | 5 | 1 |
| Future Vol, veh/h | 4 | 198 | 59 | 86 | 163 | 11 | 24 | 5 | 65 | 11 | 5 | 1 |
| Conflicting Peds, #/hr | 5 | 0 | 4 | 4 | 0 | 5 | 1 | 0 | 4 | 4 | 0 | 1 |
| Sign Control | Free | Free | Free | Free | Free | Free | Stop | Stop | Stop | Stop | Stop | Stop |
| RT Channelized | - | - | None | - | - | None | - | - | None | - | - | None |
| Veh in Median Storage, # | - | 0 | - | - | 0 | - | - | 0 | - | - | 0 | - |
| Grade, % | - | 0 | - | - | 0 | - | - | 0 | - | - | 0 | - |
| Peak Hour Factor | 33 | 83 | 40 | 75 | 95 | 63 | 38 | 63 | 92 | 63 | 63 | 25 |
| Heavy Vehicles, % | 0 | 2 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Mvmt Flow | 12 | 239 | 148 | 115 | 172 | 17 | 63 | 8 | 71 | 17 | 8 | 4 |
| Major/Minor | Major1 | Major2 | Minor1 | Minor2 | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Conflicting Flow All | 194 | 0 | 0 | 391 | 0 | 0 | 759 | 765 | 321 | 797 | 831 | 187 |
| Stage 1 | - | - | - | - | - | - | 341 | 341 | - | 416 | 416 | - |
| Stage 2 | - | - | - | - | - | - | 418 | 424 | - | 381 | 415 | - |
| Critical Hdwy | 4.1 | - | - | 4.1 | - | - | 7.1 | 6.5 | 6.2 | 7.1 | 6.5 | 6.2 |
| Critical Hdwy Stg 1 | - | - | - | - | - | - | 6.1 | 5.5 | - | 6.1 | 5.5 | - |
| Critical Hdwy Stg 2 | - | - | - | - | - | - | 6.1 | 5.5 | - | 6.1 | 5.5 | - |
| Follow-up Hdwy | 2.2 | - | - | 2.2 | - | - | 3.5 | 4 | 3.3 | 3.5 | 4 | 3.3 |
| Pot Cap-1 Maneuver | 1391 | - | - | 1179 | - | - | 326 | 336 | 724 | 307 | 307 | 860 |
| Stage 1 | - | - | - | - | - | - | 678 | 642 | - | 618 | 595 | - |
| Stage 2 | - | - | - | - | - | - | 616 | 590 | - | 645 | 596 | - |
| Mov Cap-1 Maneuver | 1385 | - | - | 1175 | - | - | 287 | 293 | 719 | 244 | 268 | 855 |
| Mov Cap-2 Maneuver | - | - | - | - | - | - | 287 | 293 | - | 244 | 268 | - |
| Stage 1 | - | - | - | - | - | - | 668 | 632 | - | 608 | 527 | - |
| Stage 2 | - | - | - | - | - | - | 537 | 523 | - | 566 | 587 | - |
| Approach | EB | WB | NB | SB |
|---|---|---|---|---|
| HCM Control Delay, s | 0.2 | 3.2 | 18.3 | 19.5 |
| HCM LOS | C | C |
| Minor Lane/Major Mvmt | NBLn1 | EBL | EBT | EBR | WBL | WBT | WBR | SBLn1 |
|---|---|---|---|---|---|---|---|---|
| Capacity (veh/h) | 410 | 1385 | - | - | 1175 | - | - | 278 |
| HCM Lane V/C Ratio | 0.346 | 0.009 | - | - | 0.098 | - | - | 0.106 |
| HCM Control Delay (s) | 18.3 | 7.6 | 0 | - | 8.4 | 0 | - | 19.5 |
| HCM Lane LOS | C | A | A | - | A | A | - | C |
| HCM 95th %tile Q(veh) | 1.5 | 0 | - | - | 0.3 | - | - | 0.4 |
Lanes, Volumes, Timings
11: Burnside Rd & Watkiss Way 11-06-2019 9 Erskine Lane TIA 4:00 pm 11-16-2018 2022 Opening Day PM w Full Buildout
| Lane Group | EBL | EBT | EBR | WBL | WBT | WBR | NBL | NBT | NBR | SBL | SBT | SBR |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Lane Configurations | $\uparrow$ | $\uparrow$ | $\uparrow$ | $\uparrow$ | $\uparrow$ | |||||||
| Traffic Volume (vph) | 14 | 49 | 39 | 129 | 54 | 41 | 97 | 233 | 148 | 48 | 433 | 40 |
| Future Volume (vph) | 14 | 49 | 39 | 129 | 54 | 41 | 97 | 233 | 148 | 48 | 433 | 40 |
| Ideal Flow (vphpl) | 1900 | 1900 | 1900 | 1900 | 1900 | 1900 | 1900 | 1900 | 1900 | 1900 | 1900 | 1900 |
| Lane Util. Factor | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 |
| Ped Bike Factor | 0.94 | 0.99 | 1.00 | 0.97 | 1.00 | |||||||
| Frt | 0.937 | 0.973 | 0.850 | 0.989 | ||||||||
| Flt Protected | 0.994 | 0.975 | 0.987 | 0.994 | ||||||||
| Satd. Flow (prot) | 0 | 1654 | 0 | 0 | 1777 | 0 | 0 | 1859 | 1601 | 0 | 1848 | 0 |
| Flt Permitted | 0.951 | 0.795 | 0.750 | 0.914 | ||||||||
| Satd. Flow (perm) | 0 | 1582 | 0 | 0 | 1439 | 0 | 0 | 1412 | 1557 | 0 | 1699 | 0 |
| Right Turn on Red | Yes | Yes | Yes | Yes | ||||||||
| Satd. Flow (RTOR) | 61 | 19 | 174 | 9 | ||||||||
| Peak Hour Factor | 0.81 | 0.94 | 0.64 | 0.91 | 0.66 | 0.75 | 0.89 | 0.80 | 0.85 | 0.64 | 0.85 | 0.79 |
| Adj. Flow (vph) | 17 | 52 | 61 | 142 | 82 | 55 | 109 | 291 | 174 | 75 | 509 | 51 |
| Lane Group Flow (vph) | 0 | 130 | 0 | 0 | 279 | 0 | 0 | 400 | 174 | 0 | 635 | 0 |
| Turn Type | Perm | NA | Perm | NA | pm+pt | NA | Perm | Perm | NA | |||
| Protected Phases | 4 | 8 | 5 | 2 | 6 | |||||||
| Permitted Phases | 4 | 8 | 2 | 2 | 6 | |||||||
| Detector Phase | 4 | 4 | 8 | 8 | 5 | 2 | 2 | 6 | 6 | |||
| Total Split (s) | 22.5 | 22.5 | 22.5 | 22.5 | 9.5 | 42.5 | 42.5 | 33.0 | 33.0 | |||
| Total Split (%) | 34.6% | 34.6% | 34.6% | 34.6% | 14.6% | 65.4% | 65.4% | 50.8% | 50.8% | |||
| Act Effct Green (s) | 15.2 | 15.2 | 38.9 | 38.9 | 38.9 | |||||||
| v/c Ratio | 0.30 | 0.77 | 0.46 | 0.17 | 0.61 | |||||||
| Control Delay | 13.0 | 36.1 | 9.3 | 1.6 | 11.1 | |||||||
| Total Delay | 13.0 | 36.1 | 9.3 | 1.6 | 11.1 |
| Lane Group | EBL | EBT | EBR | WBL | WBT | WBR | NBL | NBT | NBR | SBL | SBT | SBR |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| LOS | B | D | A | A | B | |||||||
| Approach Delay | 13.0 | 36.1 | 7.0 | 11.1 | ||||||||
| Approach LOS | B | D | A | B | ||||||||
| Queue Length 50th (m) | 6.2 | 27.7 | 23.5 | 0.0 | 41.8 | |||||||
| Queue Length 95th (m) | 17.8 | 33.0 | 36.1 | 5.3 | 66.5 | |||||||
| Base Capacity (vph) | 495 | 425 | 869 | 1025 | 1049 | |||||||
| Reduced v/c Ratio | 0.26 | 0.66 | 0.46 | 0.17 | 0.61 |
Intersection Summary Area Type: Other Cycle Length: 65 Actuated Cycle Length: 63.1 Natural Cycle: 65 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.77 Intersection Signal Delay: 14.1 Intersection LOS: B Intersection Capacity Utilization 76.0% ICU Level of Service D
MOVEMENT SUMMARY
Site: 101 [Watkiss Way / Hospital Access / Eagle Creek Access_2022PMPD] New Site Roundabout Processed: Wednesday, November 6, 2019 5:49:55 PM
Movement Performance - Vehicles
| Mov ID | Turn | Demand Flows | Deg. Satn v/c | Average Delay sec | Level of Service | 95% Back of Queue | Prop. Queued | Effective Stop Rate | Aver. No. Cycles | Average Speed km/h | ||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Total veh/h | HV % | Vehicles veh | Distance m | |||||||||
| South: Hospital Access | ||||||||||||
| 3 | L2 | 45 | 0.0 | 0.617 | 17.2 | LOS B | 4.9 | 37.5 | 0.75 | 0.95 | 1.32 | 45.7 |
| 8 | T1 | 86 | 0.0 | 0.617 | 17.2 | LOS B | 4.9 | 37.5 | 0.75 | 0.95 | 1.32 | 45.5 |
| 18 | R2 | 268 | 0.0 | 0.617 | 17.2 | LOS B | 4.9 | 37.5 | 0.75 | 0.95 | 1.32 | 44.5 |
| Approach | 400 | 0.0 | 0.617 | 17.2 | LOS B | 4.9 | 37.5 | 0.75 | 0.95 | 1.32 | 44.8 | |
| East: Watkiss Way | ||||||||||||
| 1 | L2 | 38 | 0.0 | 0.360 | 7.6 | LOS A | 1.7 | 13.0 | 0.36 | 0.24 | 0.36 | 52.0 |
| 6 | T1 | 280 | 3.8 | 0.360 | 7.8 | LOS A | 1.7 | 13.0 | 0.36 | 0.24 | 0.36 | 51.7 |
| 16 | R2 | 194 | 0.0 | 0.360 | 0.9 | LOS A | 1.7 | 13.0 | 0.04 | 0.03 | 0.04 | 56.1 |
| Approach | 513 | 2.1 | 0.360 | 5.1 | LOS A | 1.7 | 13.0 | 0.24 | 0.16 | 0.24 | 53.2 | |
| North: Eagle Creek Access | ||||||||||||
| 7 | L2 | 148 | 1.0 | 0.513 | 12.0 | LOS B | 3.6 | 27.4 | 0.62 | 0.71 | 0.87 | 48.0 |
| 4 | T1 | 30 | 0.0 | 0.513 | 12.0 | LOS B | 3.6 | 27.4 | 0.62 | 0.71 | 0.87 | 47.8 |
| 14 | R2 | 219 | 0.0 | 0.513 | 12.0 | LOS B | 3.6 | 27.4 | 0.62 | 0.71 | 0.87 | 46.6 |
| Approach | 397 | 0.4 | 0.513 | 12.0 | LOS B | 3.6 | 27.4 | 0.62 | 0.71 | 0.87 | 47.2 | |
| West: Watkiss Way | ||||||||||||
| 5 | L2 | 16 | 0.0 | 0.522 | 10.9 | LOS B | 3.0 | 23.6 | 0.52 | 0.43 | 0.54 | 49.9 |
| 2 | T1 | 377 | 3.2 | 0.522 | 11.1 | LOS B | 3.0 | 23.6 | 0.52 | 0.43 | 0.54 | 49.7 |
| 12 | R2 | 69 | 0.0 | 0.522 | 10.9 | LOS B | 3.0 | 23.6 | 0.52 | 0.43 | 0.54 | 48.4 |
| Approach | 462 | 2.6 | 0.522 | 11.0 | LOS B | 3.0 | 23.6 | 0.52 | 0.43 | 0.54 | 49.5 | |
| All Vehicles | 1771 | 1.4 | 0.617 | 10.9 | LOS B | 4.9 | 37.5 | 0.51 | 0.53 | 0.70 | 48.8 |
HCM 2010 TWSC
8: Erskine Ln/Stoneridge Dr & Watkiss Way 11-06-2019 9 Erskine Lane TIA 8:00 am 11-16-2018 2032 Post Development AM
Intersection Int Delay, s/veh: 8.2
| Movement | EBL | EBT | EBR | WBL | WBT | WBR | NBL | NBT | NBR | SBL | SBT | SBR |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Lane Configurations | $\uparrow$ | $\uparrow$ | $\uparrow$ | $\uparrow$ | ||||||||
| Traffic Vol, veh/h | 6 | 470 | 23 | 27 | 144 | 3 | 48 | 6 | 107 | 14 | 6 | 6 |
| Future Vol, veh/h | 6 | 470 | 23 | 27 | 144 | 3 | 48 | 6 | 107 | 14 | 6 | 6 |
| Conflicting Peds, #/hr | 1 | 0 | 7 | 7 | 0 | 1 | 4 | 0 | 2 | 2 | 0 | 4 |
| Sign Control | Free | Free | Free | Free | Free | Free | Stop | Stop | Stop | Stop | Stop | Stop |
| Mvmt Flow | 10 | 553 | 37 | 82 | 182 | 6 | 72 | 10 | 126 | 30 | 10 | 14 |
| Major/Minor | Major1 | Major2 | Minor1 | Minor2 | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Conflicting Flow All | 189 | 0 | 0 | 597 | 0 | 0 | 964 | 952 | 581 | 1012 | 967 | 190 |
| Stage 1 | - | - | - | - | - | - | 599 | 599 | - | 350 | 350 | - |
| Stage 2 | - | - | - | - | - | - | 365 | 353 | - | 662 | 617 | - |
| Critical Hdwy | 4.1 | - | - | 4.1 | - | - | 7.1 | 6.5 | 6.2 | 7.1 | 6.5 | 6.2 |
| Pot Cap-1 Maneuver | 1397 | - | - | 989 | - | - | 237 | 261 | 517 | 220 | 256 | 857 |
| Mov Cap-1 Maneuver | 1396 | - | - | 983 | - | - | 206 | 233 | 513 | 148 | 228 | 853 |
| Mov Cap-2 Maneuver | - | - | - | - | - | - | 206 | 233 | - | 148 | 228 | - |
| Approach | EB | WB | NB | SB |
|---|---|---|---|---|
| HCM Control Delay, s | 0.1 | 2.7 | 33.5 | 28.8 |
| HCM LOS | D | D |
| Minor Lane/Major Mvmt | NBLn1 | EBL | EBT | EBR | WBL | WBT | WBR | SBLn1 |
|---|---|---|---|---|---|---|---|---|
| Capacity (veh/h) | 326 | 1396 | - | - | 983 | - | - | 205 |
| HCM Lane V/C Ratio | 0.637 | 0.007 | - | - | 0.083 | - | - | 0.265 |
| HCM Control Delay (s) | 33.5 | 7.6 | 0 | - | 9 | 0 | - | 28.8 |
| HCM Lane LOS | D | A | A | - | A | A | - | D |
| HCM 95th %tile Q(veh) | 4.1 | 0 | - | - | 0.3 | - | - | 1 |
Lanes, Volumes, Timings
11: Burnside Rd & Watkiss Way 11-06-2019 9 Erskine Lane TIA 8:00 am 11-16-2018 2032 Post Development AM
| Lane Group | EBL | EBT | EBR | WBL | WBT | WBR | NBL | NBT | NBR | SBL | SBT | SBR |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Lane Configurations | $\uparrow$ | $\uparrow$ | $\uparrow$ | $\uparrow$ | $\uparrow$ | |||||||
| Traffic Volume (vph) | 62 | 81 | 47 | 112 | 49 | 80 | 61 | 643 | 387 | 59 | 127 | 8 |
| Future Volume (vph) | 62 | 81 | 47 | 112 | 49 | 80 | 61 | 643 | 387 | 59 | 127 | 8 |
| Adj. Flow (vph) | 103 | 104 | 59 | 211 | 58 | 92 | 117 | 670 | 440 | 71 | 144 | 16 |
| Lane Group Flow (vph) | 0 | 266 | 0 | 0 | 361 | 0 | 0 | 787 | 440 | 0 | 231 | 0 |
| Turn Type | Perm | NA | Perm | NA | pm+pt | NA | Perm | Perm | NA | |||
| Total Split (s) | 26.0 | 26.0 | 26.0 | 26.0 | 9.5 | 39.0 | 39.0 | 29.5 | 29.5 | |||
| Total Split (%) | 40.0% | 40.0% | 40.0% | 40.0% | 14.6% | 60.0% | 60.0% | 45.4% | 45.4% | |||
| Act Effct Green (s) | 20.3 | 20.3 | 34.5 | 34.5 | 34.5 | |||||||
| v/c Ratio | 0.58 | 0.91 | 0.85 | 0.42 | 0.43 | |||||||
| Control Delay | 22.5 | 49.8 | 24.2 | 2.4 | 12.1 | |||||||
| Total Delay | 22.5 | 49.8 | 24.2 | 2.4 | 12.1 |
| Lane Group | EBL | EBT | EBR | WBL | WBT | WBR | NBL | NBT | NBR | SBL | SBT | SBR |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| LOS | C | D | C | A | B | |||||||
| Approach Delay | 22.5 | 49.8 | 16.4 | 12.1 | ||||||||
| Approach LOS | C | D | B | B | ||||||||
| Queue Length 50th (m) | 23.4 | 37.3 | 75.4 | 0.0 | 15.0 | |||||||
| Queue Length 95th (m) | 36.0 | #73.6 | #144.7 | 10.1 | 29.6 | |||||||
| Base Capacity (vph) | 482 | 420 | 929 | 1039 | 537 | |||||||
| Reduced v/c Ratio | 0.55 | 0.86 | 0.85 | 0.42 | 0.43 |
Intersection Summary Maximum v/c Ratio: 0.91 Intersection Signal Delay: 22.5 Intersection LOS: C Intersection Capacity Utilization 84.7% ICU Level of Service E
MOVEMENT SUMMARY
Site: 101 [Watkiss Way / Hospital Access / Eagle Creek Access_2032AMPD] New Site Roundabout Processed: Wednesday, November 6, 2019 5:49:53 PM
Movement Performance - Vehicles
| Mov ID | Turn | Demand Flows | Deg. Satn v/c | Average Delay sec | Level of Service | 95% Back of Queue | Prop. Queued | Effective Stop Rate | Aver. No. Cycles | Average Speed km/h | ||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Total veh/h | HV % | Vehicles veh | Distance m | |||||||||
| South: Hospital Access | ||||||||||||
| Approach | 85 | 11.8 | 0.160 | 8.9 | LOS A | 0.5 | 4.1 | 0.56 | 0.56 | 0.56 | 49.1 | |
| East: Watkiss Way | ||||||||||||
| Approach | 592 | 4.0 | 0.453 | 6.7 | LOS A | 2.3 | 18.4 | 0.27 | 0.18 | 0.27 | 51.6 | |
| North: Eagle Creek Access | ||||||||||||
| Approach | 251 | 1.2 | 0.359 | 9.8 | LOS A | 1.5 | 11.9 | 0.58 | 0.59 | 0.61 | 48.8 | |
| West: Watkiss Way | ||||||||||||
| Approach | 644 | 3.4 | 0.769 | 20.9 | LOS C | 14.0 | 109.6 | 0.79 | 1.09 | 1.61 | 43.4 | |
| All Vehicles | 1571 | 3.7 | 0.769 | 13.1 | LOS B | 14.0 | 109.6 | 0.55 | 0.64 | 0.89 | 47.4 |
HCM 2010 TWSC
8: Erskine Ln/Stoneridge Dr & Watkiss Way 11-06-2019 9 Erskine Lane TIA 4:00 pm 11-16-2018 2032 Post Development PM
Intersection Int Delay, s/veh: 5.4
| Movement | EBL | EBT | EBR | WBL | WBT | WBR | NBL | NBT | NBR | SBL | SBT | SBR |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Lane Configurations | $\uparrow$ | $\uparrow$ | $\uparrow$ | $\uparrow$ | ||||||||
| Traffic Vol, veh/h | 5 | 242 | 61 | 90 | 199 | 13 | 25 | 6 | 67 | 13 | 6 | 1 |
| Future Vol, veh/h | 5 | 242 | 61 | 90 | 199 | 13 | 25 | 6 | 67 | 13 | 6 | 1 |
| Mvmt Flow | 15 | 292 | 153 | 120 | 209 | 21 | 66 | 10 | 73 | 21 | 10 | 4 |
| Major/Minor | Major1 | Major2 | Minor1 | Minor2 | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Conflicting Flow All | 235 | 0 | 0 | 449 | 0 | 0 | 871 | 878 | 377 | 909 | 944 | 226 |
| Stage 1 | - | - | - | - | - | - | 403 | 403 | - | 465 | 465 | - |
| Stage 2 | - | - | - | - | - | - | 468 | 475 | - | 444 | 479 | - |
| Critical Hdwy | 4.1 | - | - | 4.1 | - | - | 7.1 | 6.5 | 6.2 | 7.1 | 6.5 | 6.2 |
| Pot Cap-1 Maneuver | 1344 | - | - | 1122 | - | - | 274 | 289 | 674 | 258 | 264 | 818 |
| Mov Cap-1 Maneuver | 1338 | - | - | 1118 | - | - | 235 | 247 | 669 | 198 | 226 | 813 |
| Mov Cap-2 Maneuver | - | - | - | - | - | - | 235 | 247 | - | 198 | 226 | - |
| Approach | EB | WB | NB | SB |
|---|---|---|---|---|
| HCM Control Delay, s | 0.3 | 3 | 22.9 | 23.7 |
| HCM LOS | C | C |
| Minor Lane/Major Mvmt | NBLn1 | EBL | EBT | EBR | WBL | WBT | WBR | SBLn1 |
|---|---|---|---|---|---|---|---|---|
| Capacity (veh/h) | 347 | 1338 | - | - | 1118 | - | - | 226 |
| HCM Lane V/C Ratio | 0.427 | 0.011 | - | - | 0.107 | - | - | 0.151 |
| HCM Control Delay (s) | 22.9 | 7.7 | 0 | - | 8.6 | 0 | - | 23.7 |
| HCM Lane LOS | C | A | A | - | A | A | - | C |
| HCM 95th %tile Q(veh) | 2.1 | 0 | - | - | 0.4 | - | - | 0.5 |
Lanes, Volumes, Timings
11: Burnside Rd & Watkiss Way 11-06-2019 9 Erskine Lane TIA 4:00 pm 11-16-2018 2032 Post Development PM
| Lane Group | EBL | EBT | EBR | WBL | WBT | WBR | NBL | NBT | NBR | SBL | SBT | SBR |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Lane Configurations | $\uparrow$ | $\uparrow$ | $\uparrow$ | $\uparrow$ | $\uparrow$ | |||||||
| Traffic Volume (vph) | 17 | 60 | 48 | 153 | 69 | 49 | 118 | 285 | 172 | 57 | 528 | 49 |
| Future Volume (vph) | 17 | 60 | 48 | 153 | 69 | 49 | 118 | 285 | 172 | 57 | 528 | 49 |
| Adj. Flow (vph) | 21 | 64 | 75 | 168 | 105 | 65 | 133 | 356 | 202 | 89 | 621 | 62 |
| Lane Group Flow (vph) | 0 | 160 | 0 | 0 | 338 | 0 | 0 | 489 | 202 | 0 | 772 | 0 |
| Total Split (s) | 22.5 | 22.5 | 22.5 | 22.5 | 9.5 | 42.5 | 42.5 | 33.0 | 33.0 | |||
| Total Split (%) | 34.6% | 34.6% | 34.6% | 34.6% | 14.6% | 65.4% | 65.4% | 50.8% | 50.8% | |||
| Act Effct Green (s) | 17.1 | 17.1 | 38.0 | 38.0 | 38.0 | |||||||
| v/c Ratio | 0.34 | 0.89 | 0.63 | 0.20 | 0.78 | |||||||
| Control Delay | 13.6 | 49.1 | 13.4 | 1.6 | 17.4 | |||||||
| Total Delay | 13.6 | 49.1 | 13.4 | 1.6 | 17.4 |
| Lane Group | EBL | EBT | EBR | WBL | WBT | WBR | NBL | NBT | NBR | SBL | SBT | SBR |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| LOS | B | D | B | A | B | |||||||
| Approach Delay | 13.6 | 49.1 | 9.9 | 17.4 | ||||||||
| Approach LOS | B | D | A | B | ||||||||
| Queue Length 50th (m) | 8.5 | 36.4 | 34.6 | 0.0 | 62.8 | |||||||
| Queue Length 95th (m) | 21.8 | 41.6 | 50.4 | 5.7 | 96.0 | |||||||
| Base Capacity (vph) | 489 | 400 | 777 | 1005 | 992 | |||||||
| Reduced v/c Ratio | 0.33 | 0.84 | 0.63 | 0.20 | 0.78 |
Intersection Summary Maximum v/c Ratio: 0.89 Intersection Signal Delay: 19.9 Intersection LOS: B Intersection Capacity Utilization 88.5% ICU Level of Service E
MOVEMENT SUMMARY
Site: 101 [Watkiss Way / Hospital Access / Eagle Creek Access_2032PMPD] New Site Roundabout Processed: Wednesday, November 6, 2019 5:49:56 PM
Movement Performance - Vehicles
| Mov ID | Turn | Demand Flows | Deg. Satn v/c | Average Delay sec | Level of Service | 95% Back of Queue | Prop. Queued | Effective Stop Rate | Aver. No. Cycles | Average Speed km/h | ||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Total veh/h | HV % | Vehicles veh | Distance m | |||||||||
| South: Hospital Access | ||||||||||||
| Approach | 488 | 0.0 | 0.835 | 34.0 | LOS C | 10.7 | 81.0 | 0.91 | 1.40 | 2.37 | 37.2 | |
| East: Watkiss Way | ||||||||||||
| Approach | 604 | 1.7 | 0.433 | 6.0 | LOS A | 2.2 | 16.8 | 0.28 | 0.21 | 0.28 | 52.6 | |
| North: Eagle Creek Access | ||||||||||||
| Approach | 482 | 0.3 | 0.661 | 17.3 | LOS B | 6.7 | 51.3 | 0.75 | 0.99 | 1.38 | 44.2 | |
| West: Watkiss Way | ||||||||||||
| Approach | 548 | 2.2 | 0.647 | 14.9 | LOS B | 7.5 | 57.8 | 0.66 | 0.77 | 1.07 | 47.0 | |
| All Vehicles | 2122 | 1.1 | 0.835 | 17.3 | LOS B | 10.7 | 81.0 | 0.63 | 0.81 | 1.21 | 45.0 |
