This site is in beta — data may be incomplete and features are still being added.
Committee of the Whole/Documents/Attachment 15 - Servicing Concept Diagram
Appendix

Attachment 15 - Servicing Concept Diagram

March 13, 2018Page 721 section

Technical site plan overlaying the proposed utility and storm water management infrastructure.

2. APPROVAL OF AGENDA
Proposed 150 mm diameter water mainProposed detention gallery location

Servicing Concept

Servicing Concept site map detailing existing and proposed water, sanitary, and storm water infrastructure for a multi-unit residential development, including labels for three buildings, various trees, and utility mains.
Servicing Concept site map detailing existing and proposed water, sanitary, and storm water infrastructure for a multi-unit residential development, including labels for three buildings, various trees, and utility mains.

NOTE: Sizing of the Storm Water Management System is Approximate. Final Sizing is to be Determined During Detailed Design Phase

Map Labels and Callouts

  • Perforated Pipe for Storm Water Dispersion
  • Proposed Detention Gallery
  • Proposed Sanitary Sewer System
  • Proposed Water System
  • Building 3 (3 Units)
  • Building 2 (2 Units)
  • Building 1 (4 Units)
  • Rain Garden with Beehive Grate Overflow & Rock Swales From the Rain Water Leaders
  • Backflow Prevention Chamber
  • Vegetated Area to Remain
  • Permeable Paving
  • Flow Control Manhole
  • Existing Catch Basin
  • Oak Tree to Remain
  • Fir Trees to Remain
  • Existing 150 mm Diameter Sanitary Sewer Main
  • Existing 150 mm Diameter Water Main

Legend

  • Buildings_2015
  • Storm Manhole
  • Storm Clean-out
  • Catch Basin
  • Storm Gravity Main
  • Storm Lateral
  • Sanitary Manhole
  • Sanitary Clean-out
  • Sanitary Lateral Line
  • Sanitary Gravity Main
  • Sanitary Pressurized Main

All data to be confirmed by field check or survey.

Metres 1:1000 Scale: 10 5 0 10 20 30 40 Metres

Page 72
Extracted from: 2018 03 13 Committee of the Whole Agenda - Agenda - Pdf