This site is in beta — data may be incomplete and features are still being added.
Committee of the Whole/Documents/Attachment 6: Site Plan – WSP, January 12, 2018
Appendix

Attachment 6: Site Plan – WSP, January 12, 2018

March 13, 2018Page 1111 section

A technical site plan showing the layout of the proposed handyDART office, maintenance building, bus wash, and parking areas.

2. APPROVAL OF AGENDA
Site Area: 48,254.71 sqmZoning: Proposed I-1 Light Industrial

BC TRANSIT - VIEW ROYAL

SITE PLAN

Site plan for BC Transit View Royal showing project boundaries, building footprints for a Bus Wash, Fuel Station, and Maintenance/Admin building, along with parking areas and landscaping. The site is bordered by Burnside Road West and Watkiss Way.
Site plan for BC Transit View Royal showing project boundaries, building footprints for a Bus Wash, Fuel Station, and Maintenance/Admin building, along with parking areas and landscaping. The site is bordered by Burnside Road West and Watkiss Way.

CIVIC ADDRESS: 2401 BURNSIDE ROAD WEST

LEGAL DESCRIPTION: THAT PART OF SECTION 1, ESQUIMALT LAND DISTRICT, LYING PARTLY ON PLAN 2200 AND PARTLY ON SUBDIVISION PLAN 8157 EXCEPT THAT PART ON PLAN VIP78054 PID 023-832-211

RESUBMISSION CONTACT: ARCHITECTURE 49 INC. SUITE 500 - 310 WEST BROADWAY VANCOUVER, BC V5Y 1R2 EMAIL: PARDEEP.SANDHU@ARCHITECTURE49.COM T: 604 736 9711

SITE INFORMATION

SITE ZONING: M1 LIGHT INDUSTRIAL

CATEGORY REQUIRED PROPOSED
SETBACKS
Front Lot Line 7.5m 7.5m
Rear Lot Line 7.5m 7.5m
Side Lot Line 4.5m 11.2m
Flanking Lot Line 6.0m 1.3m
BUILDING HEIGHT 12.0m 10.2m
BUILDING WIDTH 13.9m
ACCESSORY BUILDING HEIGHT 4.5m 4.3m

SITE AREA: 40,314.71 sqm

BUILDING AREAS

BUILDING / SECTION AREA
BUS WASH 120.30 sqm
FUEL STATION 101.52 sqm
MAINT. ADMIN. BUILDING 2,887.82 sqm
— OFFICE 397.00 sqm
— MAINT. BAYS 2,210.00 sqm
— STORES 280.82 sqm
TOTAL 3,109.64 sqm

SITE COVERAGE AND DENSITY

METRIC CALCULATED VALUE ALLOWED
FSR (3,109.64 / 40,314.71 = 0.08) 0.08 0.75 ALLOWED
LOT COVERAGE (3,109.64 / 40,314.71 = 0.077) 7.7% 50% ALLOWED
IMPERMEABLE COVERAGE (12,580.00 / 40,314.71 = 0.312) 31.2% 60% ALLOWED

Drawing No: VR-A1 Date: 2018-01-12 Scale: 1:500

Page 111
Extracted from: 2018 03 13 Committee of the Whole Agenda - Agenda - Pdf