This site is in beta — data may be incomplete and features are still being added.
Committee of the Whole/Documents/Site Survey – Bradley Cunnin – September 28, 2017
Appendix

Site Survey – Bradley Cunnin – September 28, 2017

May 8, 2018Pages 316–3175 sections

Topographic site plans and surveyor's certificates defining the legal boundaries and elevations of the subject property.

9.2.3c 242-244 Island Highway - Rezoning R-1B to RM-3
September 28, 2017Brad Cunnin Land Surveyor1860.5 m2 total site area

Report to Committee of the Whole

Re: Electric Vehicle Charging Stations Approach

Meeting Date: May 8, 2018

The installation of EV charging stations in the Town of View Royal will assist in achieving the objectives of the City’s Official Community Plan Energy and Climate Change objectives and policies,

  1. Policy NE4.1 Reduction of Greenhouse Gas Emissions (GHG)
  2. Policy NE4.2 Community Greenhouse Gas Emissions Reduction Targets
  3. Policy NE4.3 Sector-specific Greenhouse Gas Emissions Reduction Targets
  4. Policy NE4.4 Corporation Greenhouse Gas Emissions Reduction Target
  5. Policy NE4.5 Corporation Carbon Neutrality
Page 316–317

ALTERNATIVES TO STAFF RECOMMENDATION:

That the Committee receive the report for information.

Page 316–317

RECOMMENDATION:

THAT the Committee recommend that electric vehicle charging stations be included as part of the 2020-2024 financial plan for budget consideration.

Page 316–317

SUBMITTED BY:

K. Bowbyes, Deputy Director of Engineering

Page 316–317

REVIEWED BY:

J. Rosenberg, Director of Engineering

Page 316–317