This site is in beta — data may be incomplete and features are still being added.
Committee of the Whole/Documents/242-244 Island Highway Circulation Comments Summary
Appendix

242-244 Island Highway Circulation Comments Summary

May 8, 2018Pages 335–3401 section

Technical review comments from municipal departments and external agencies including BC Hydro, Canada Post, and CRD Water.

9.2.3c 242-244 Island Highway - Rezoning R-1B to RM-3
CRD Water requirement for field hydrant flow testBC Hydro requirement for SRW agreementCanada Post requirement for developer-supplied lock box

Report to Committee of the Whole

Re: Electric Vehicle Charging Stations Approach Meeting Date: May 8, 2018

The installation of EV charging stations in the Town of View Royal will assist in achieving the objectives of the City’s Official Community Plan Energy and Climate Change objectives and policies,

  1. Policy NE4.1 Reduction of Greenhouse Gas Emissions (GHG)
  2. Policy NE4.2 Community Greenhouse Gas Emissions Reduction Targets
  3. Policy NE4.3 Sector-specific Greenhouse Gas Emissions Reduction Targets
  4. Policy NE4.4 Corporation⁴ Greenhouse Gas Emissions Reduction Target
  5. Policy NE4.5 Corporation Carbon Neutrality

ALTERNATIVES TO STAFF RECOMMENDATION:

That the Committee receive the report for information.

RECOMMENDATION:

THAT the Committee recommend that electric vehicle charging stations be included as part of the 2020-2024 financial plan for budget consideration.

SUBMITTED BY:

K. Bowbyes, Deputy Director of Engineering

REVIEWED BY:

J. Rosenberg, Director of Engineering

Page 335–340
Extracted from: 2018 05 08 Committee of the Whole Agenda - Agenda - Pdf