This site is in beta — data may be incomplete and features are still being added.
Committee of the Whole/Documents/DP 2016/14 - Attachment 6. DP2.0 – Parkade Plan L2
Appendix

DP 2016/14 - Attachment 6. DP2.0 – Parkade Plan L2

January 10, 2017Page 652 sections

Floor plan for the lower underground parkade level.

2. APPROVAL OF AGENDA
27 car spaces on level L2

Eagle Creek Village Phase 2 - North Bldg

Page 65

NORTH BUILDING PARKADE PLAN (L2)

Architectural drawing of the North Building Parkade Plan (L2) for Eagle Creek Village Phase 2, showing 27 parking stalls, storage, elevator lobby, stairs, and car entrance ramp.
Architectural drawing of the North Building Parkade Plan (L2) for Eagle Creek Village Phase 2, showing 27 parking stalls, storage, elevator lobby, stairs, and car entrance ramp.

Parkade Plan Details

  • Scale: 1:150
  • Parking Floor Plan Area: 968 m² [10,420 SQ.FT]
  • Parking Stalls: 27

Plan Features and Annotations

  • Parking Layout: 27 car spaces total, including several designated "SMALL CAR" stalls.
  • L1 Parking Foundation: A large section of the foundation shown adjacent to the parkade.
  • Access and Egress:
    • Carpark entrance
    • Ramp labeled "RAMP DOWN"
    • Designated "EXIT"
  • Clearance Requirements: Multiple notations specify "PROVIDE MIN. 2.1M OVERHEAD CLEARANCE" at various entrance and overhead points.
  • Service and Storage Areas:
    • Elevator Lobby
    • Stair 1
    • Storage room
    • Area for 25 lockers
  • Grid System: The plan is organized on a grid from A to M horizontally and 1 to 14 vertically.

Project Information

  • Project Number: 11 14 032
  • Drawing Number: DP2.0
  • Date: NOV 16, 2016
  • Drawn: MB
  • Checked: IM
  • Firm: Omicron Architecture Engineering Ltd.

Issue History

# Date Remarks
1 NOV 16, 2016 ISSUED FOR DP
Page 65
Extracted from: 2017 01 10 Committee of the Whole Agenda - Agenda - Pdf