This site is in beta — data may be incomplete and features are still being added.
Committee of the Whole/Documents/DP 2016/14 - Attachment 17. L1 - Landscape Concept - Phase B
Appendix

DP 2016/14 - Attachment 17. L1 - Landscape Concept - Phase B

January 10, 2017Page 761 section

Landscape plan detailing tree and shrub placement, irrigation, and community amenity spaces.

2. APPROVAL OF AGENDA
1800mm wood benchBlack vinyl coated chain link fence

Eagle Creek Village Phase 2

Landscape Concept - Phase B

Landscape Concept - Phase B plan for Eagle Creek Village Phase 2 showing the North Building area, parking, pathways, and landscaping features.
Landscape Concept - Phase B plan for Eagle Creek Village Phase 2 showing the North Building area, parking, pathways, and landscaping features.

Recommended Nursery Stock

Type Botanical Name Common Name Size
Trees
Total: 4 Acer rubrum 'Bowhall' Bowhall Red Maple 6cm cal.
Large Shrubs
Total: 6 Mahonia x media 'Charity' Charity Mahonia #5 pot
Medium Shrubs
Total: 31 Mahonia aquifolium Tall Oregon Grape #3 Pot
Nandina domestica 'Gulf Stream' Gulf Stream Heavenly Bamboo #3 pot
Small Shrubs
Total: 181 Lavandula officinalis English Lavender #1 pot
Mahonia nervosa Low Oregon Grape #1 pot
Perennials, Annuals and Ferns
Total: 222 Blechnum spicant Deer Fern #1 pot
Calamagrostis x acutiflora 'Karl Foerster' Feather Reed Grass #1 pot
Helictotrichon sempervirens Blue Oat Grass #1 pot
Polystichum munitum Sword Fern #1 pot
Stipa tenuissima Mexican Feather Grass #1 pot
Vines
Total: 8 Hydrangea anomala petiolaris Climbing Hydrangea #2 pot

Notes:

  1. All work to be completed to current BCSLA Landscape Standards
  2. All soft landscape to be irrigated with an automatic irrigation system

Site Plan Details

Western and Central Areas:

  • 900mm gravel access path at rear of building
  • Class B parking for six (6) bicycles
  • 1800mm wood bench
  • Sawcut concrete sidewalk
  • Cable trellis along wall with boulder pocket plantings of shrubs, ornamental grasses, and vines
  • Engineered stacked boulder retaining wall. Pockets of soil are planted with ornamental grasses and ferns.
  • Gravel maintenance access path
  • Ornamental evergreen shrubs and ferns at edge of roadway leading into parking
  • New Bowhall red maple tree (1)
  • Seating amenity space bordered by a decorative wood trellis, landscape boulders, shrubs, and ornamental grasses

Eastern and Perimeter Areas:

  • Park Path Connection (Not in Phase 2 Development)
  • Shade-tolerant hydroseeding at rear of building
  • Timber/Gravel Cribbed Steps
  • 1800mm Black Vinyl Coated Chain Link Fence
  • 2m Wide Gravel Path. Park Access Pathway Part of Eagle Creek Village Phase 1 Scope
  • Phasing Line

Project Information:

  • Project Number: 1420
  • Date: Nov 18-16
  • Sheet Number: L1
Page 76
Extracted from: 2017 01 10 Committee of the Whole Agenda - Agenda - Pdf