Appendix
Attachment 3: Plan of Proposed Trunk Sewer (Glentana Housing)
April 12, 2022Page 3231 section
Engineering drawing illustrating the plan for a proposed trunk sewer near Shoreline Middle School.
Shoreline Middle SchoolGlentana HousingDrawing 1181-SK 11Internal page reference 323 of 330
PLAN OF PROPOSED TRUNK SEWER




Notes
- Pumping Station to be constructed entirely at the cost of the developer & to the plans & specifications approved by Chief Engineer of the Regional District to any work being undertaken.
- Pedestrian Ramp over Craigflower Road.
- Pedestrian Underpass beneath E & N Railway.
- Highway & parkway improvements as req'd by Dept. of Highways.


- Approx. location of Pedestrian Ramp over Craigflower Road (Ref. Dwg. 13 of Schedule B of LUC 7-76)
Legend
- -W- Proposed Watermain
- -S- Proposed Sanitary Sewer
- -D- Proposed Drain
- -W- Existing Watermain
- Note: This plan was redrawn Sept 21, 1977

Project Information
| Item | Detail |
|---|---|
| Land Use Contract | CRC Ref. No. 7-76 SCHEDULE D - Dwg. 11 |
| Firm | KER, PRIESTMAN & ASSOCIATES LTD. |
| Client | ASKE CONSTRUCTION LTD. |
| Project | GLENTANA HOUSING |
| Drawing Title | PLAN OF PROPOSED TRUNK SEWER |
| Date | SEPT. 21, 1977 |
| Scale | 1" = 50' |
| Drawing Number | 1181 - SK 11 |
Revisions
| Rev | Date | Description |
|---|---|---|
| A | 4-10-77 | Land Use Contract Dwg Revised |

Page 323
Extracted from: 2022 04 12 Committee of the Whole Agenda - Agenda - Pdf