This site is in beta — data may be incomplete and features are still being added.
Committee of the Whole/Documents/Attachment 3: Proposed Pedestrian Overpass Layout and Details
Appendix

Attachment 3: Proposed Pedestrian Overpass Layout and Details

April 12, 2022Page 3251 section

Layout and structural details for a proposed pedestrian overpass spanning the Island Highway.

Island HighwayGlentana Cul-de-sacInternal page reference 325 of 330

Plan Showing Layout of Proposed Pedestrian Overpass

Date: 11-26-67 Scale: 1" = 20'-0"

Plan view layout of proposed pedestrian overpass ramps with slope notes and north arrow
Plan view layout of proposed pedestrian overpass ramps with slope notes and north arrow
Plan view detail showing connection to Island Highway, including labels for "Asphalt curb," "Pump up," and "Ramp up"
Plan view detail showing connection to Island Highway, including labels for "Asphalt curb," "Pump up," and "Ramp up"
Plan view detail indicating "Plan 4110 #1"
Plan view detail indicating "Plan 4110 #1"
Plan view detail showing "Clentana Cu-De-Sac," "Existing drive," "P.R. access," and "Min road clearance 16'-0""
Plan view detail showing "Clentana Cu-De-Sac," "Existing drive," "P.R. access," and "Min road clearance 16'-0""
Detail of north arrow and elevation benchmark at + EL. 207'.6"
Detail of north arrow and elevation benchmark at + EL. 207'.6"

Ramp Notes

  • Ramp length of ramp will vary according to actual site elevations. All ramps at 12 1/2% slope.

Sections and Details

Technical drawings showing "Ramp Section" and "Railing Detail"
Technical drawings showing "Ramp Section" and "Railing Detail"
Detail views of "Ramp Section" and "Railing Detail" with portions of the title block
Detail views of "Ramp Section" and "Railing Detail" with portions of the title block

East Elevation

Drawing of the East Elevation and the main project title block
Drawing of the East Elevation and the main project title block
Label for "East Elevation"
Label for "East Elevation"

Project Information

PROGRESS PRINT PRELIMINARY NOT FOR CONSTRUCTION

READ JONES CHRISTOFFERSEN LTD. CONSULTING ENGINEERS — PARKING PLANNERS

  • Project: Lake Cowichan Lake Cowichan Road District Contract 776 Schedule D, DWG 15
  • Sheet Title: Plan, Elevation and Details for Pedestrian Bridge
  • Job No.: 4755-1
  • Dwg No.: 4755-1-01
  • Date: 22 9 77
  • Scale: AS NOTED
  • Drawn By: S.V.
Page 325

Document Images

(2)
Document image
Document image
Extracted from: 2022 04 12 Committee of the Whole Agenda - Agenda - Pdf