Council Meeting/Documents/HIGHLAND SOUTH BRIDGE REHABILITATION AWARD
Staff Report

HIGHLAND SOUTH BRIDGE REHABILITATION AWARD

July 21, 2026Pages 81–8313 sectionsOriginal PDF

Request for Council to award a construction contract for the rehabilitation of the Highland South Bridge.

July 15, 2026Award to: Island ApplicatorsPrice: $99,710 plus GSTWork must occur within fisheries timing window

TOWN OF VIEW ROYAL COUNCIL REPORT

TO: Council FROM: Ben Lubberts, AScT, Deputy Director of Engineering DATE: July 15, 2026 MEETING DATE: July 21, 2026

HIGHLAND SOUTH BRIDGE REHABILITATION AWARD

Page 81–83

RECOMMENDATION:

THAT Council approve the award for the Town’s 2026 Highland South Bridge Rehabilitation construction contract to Island Applicators at a price of $99,710 plus GST.

Page 81–83

ALTERNATIVE OPTIONS:

Option #2: THAT Council cancel the award and direct staff to defer the Highland South Bridge Rehabilitation project to a future year.

Staff do not recommend this option because delaying the work increases the risk of further deterioration to critical bridge structural elements, reduces the Town’s ability to complete the work within the fisheries timing window, and increases future construction costs.

Page 81–83

PURPOSE OF REPORT:

To seek Council approval to award the construction contract for the Highland South Bridge Rehabilitation project (C-184 Bridge Rehabilitation Program), identified in the 2026–2030 Financial Plan.

Page 81–83

BACKGROUND:

Highland South Bridge is an existing municipal bridge asset that has been identified in the latest bridge inspection audit to require short term rehabilitation of critical structural elements to support long-term asset management and achieve its full estimated serviceable life. Completing the work will maintain safe and reliable access for the community, especially as the bridge is located within the Thetis Lake Park area. The project location is included in Attachment #1.

The work involves construction within a fish-bearing stream bed and will be undertaken under permit from the province. Construction is scheduled for early August and is required to be completed withing the fisheries timing window for the in-stream component of the work.

In accordance with the Town’s Purchasing Policy, staff sought three quotes for the Highland South Bridge Rehabilitation work. Island Applicators submitted the lowest quote in the amount of $99,710 plus GST.

Page 81–83

IMPACTS:

Within the Bridge Rehabilitation Project C-184, $160,000 of the budget is earmarked for this project. The bid, including engineering and environmental professional services, is within the approved 2026–2030 Financial Plan project budget as a result.

Staff recommend awarding the construction contract to Island Applicators in the amount of $99,710 plus GST. Awarding the contract will allow the rehabilitation work to proceed within the 2026 fishery window for working within a stream. If the contract is not awarded, the project would miss this window and the work would need to be deferred to the next available dry-season construction window in 2027.

Page 81–83

ANALYSIS:

Impacts and implications can be summarized as follows:

Impact Category Description
Community Impacts: The rehabilitation will maintain safe and reliable bridge service for the community by addressing critical structural elements and supporting the bridge’s long-term serviceability.
Financial Implications: The bid price of $99,710 plus GST is within the approved 2026–2030 Financial Plan project budget.
Inter-governmental Relations Impact: The project has obtained provincial permitting for working within a fish-bearing stream bed. Staff will coordinate the work under the applicable permit and within the fisheries timing window.
Page 81–83

ALIGNMENT:

The recommended option aligns with the Town’s guiding documents as follows:

Document Alignment
Strategic Plan: Strategic Priority D, Goal 1 - Financial Sustainability and Service Excellence: Confidence in the Fiscal Health and Financial Sustainability of the Town.
Other Policy Documents: Asset Management 2600-034 – Safe and accessible community services through evidence-based decision making and maintaining infrastructure in a safe, serviceable condition.
Page 81–83

PUBLIC PARTICIPATION GOAL:

The desired level of public participation for the recommended option is:

[X] Inform [ ] Consult [ ] Involve [ ] Collaborate [ ] Empower [ ] N/A

Page 81–83

TIME CRITICAL:

Time is of the essence to ensure that the works can proceed within this year’s fisheries window.

Page 81–83

CONCURRENCE:

CONCURRENCE: Initials Comments
Chief Administrative Officer SS I concur with the recommendation.
Page 81–83

REVIEWED BY:

REVIEWED BY: Initials
Director of Corporate Administration N/R
Director of Finance SV
Director of Development Services N/R
Director of Engineering IL
Director of Protective Services N/R
Page 81–83

ATTACHMENTS:

  1. Attachment 1 – Project Location
Page 81–83