Schedule of capital projects and equipment replacements through 2030.

10. e) Email dated December 4, 2025 from T. Moore, West Shore Parks & Recreation, Re: 2026 WSPRS Budget Package (motion to approve)
Zamboni replacement scheduled for 2028: $325,000

5-YEAR CAPITAL PLAN

Page 140–142

WEST SHORE PARKS & RECREATION

5-Year Capital plan

Project 2026 2027 2028 2029 2030
Carpentry shop roof 15,000
Preventative Electrical maintenance 20,000 5,000 5,000 20,000
Duct Cleaning 10,000
Clubhouse air handling 200,000
Clubhouse Hot Water Tank 20,000
Cottage floor 40,000
ISF Cladding 200,000
ISF Doors 50,000
Pool Hot Tub Filter 25,000
Site - HV Electrical Maint 75,000
Portable Batting Cage 15,000
ISC Ceiling Netting 10,000
ISF Cutains 100,000
Fieldhouse Hot Water Tanks (2) 7,000
JDF Arena MCP Pannel 100,000
JDF Arena Chiller 500,000
JDF Arena Dessicant Wheel 100,000
JDF Arena Partitions and Countertops 50,000
JDF Emergency Generator 80,000
Pool Boilers 340,000
Pool Changeroom AHU 75,000
Pool Doors 50,000
Pool Waterslide 12,000
Pool/Filter Pump/Main 10,000
Pool/Filter Pump/Leisure 10,000
Pool Hot Tub Liner 250,000
Pool Hot Water System 50,000
Lobby Fountain 5,000
Family Changeroom Tile 35,000
Mens Changeroom Tile 30,000
Womens Changeroom Tile 30,000
Q Centre rubber flooring 300,000
Q Centre Seating 500,000
Q Centre Water Tanks 7,500
Score Clock Main 250,000
Concourse Fountain (Q center) 5,000
Seniors Roof (Flat) 450,000
Seniors Generator 90,000
Seniors Fire Panel 20,000
IT System equipment 25,000 50,000
Fitness equipment 400,000
Signage 100,000
Surveillance Equipment Phase 2 140,000
Locks with push button 50,000
12 Storage containers 257,520
Major site maintenance total 1,722,020 1,035,000 1,162,000 805,000 465,000
Court Linning 5,000
Field Irrigation 50,000
JDF Lacrosse Box (Board Replacement) 4,000 4,000 4,000
Playground, Upper, Chips 12,000 8,000
Roadway Repair 45,000 45,000 45,000 45,000 45,000
Sign LED front 100,000
Tennis Court Refinishing 500,000
Outside Lacrosse Box 5,000 5,000
Ball Fencing 10,000 10,000 10,000 10,000
Water closet man holes 20,000 20,000 20,000 20,000 20,000
Curb Painting / replacement 5,000
Field Lights 100,000
Park Tables 40,000
Concession Fountain - lower fields 10,000
CC Heatpump move & Duct 100,000
Velodrome turf 200,000
Major parks maintenance total 191,000 125,000 184,000 183,000 834,000
CHEV 2500 4WDR P/U 65,000
Yamaha Umax 18,000
FERT SPREADER 8,000
PUSH MOWER 2,000
TURF VACUMN 25,000
SEED DRILL 30,000
ALLUMINUM AUTO FEED WELDER 5,000
OUTCROSS SNOW PLOW 5,000
BOBCAT PLOW 3,000
TORO WORKMAN LIGHTDUTY 18,000
GATOR JD 6X4 18,000
TORO WORKMAN 55,000
TORO 3500D 70,000
2 Bowls Mowers changed to one Toro Triplex 54,000
TORO WALK BEHIND AERATOR 35,000
GREENS RIDE ON, TORO 50,000
CASE SKID STEER 65,000
TORO GREENSMASTER 3150 50,000
ICE EDGER 1 8,000
ICE EDGER 2 8,000
ZAMBONI 3 325,000
2 Toro Electric golf utility carts 22,000
Floor Machine (Lower Rink) 30,000
CHEV UPLANDER admin 50,000
School bus 120,000
Fleet total 78,000 209,000 466,000 281,000 105,000
Total WSPR capital 1,991,020 1,369,000 1,812,000 1,269,000 1,404,000
Carpet replacement (CaTS) 10,000
Linoleum flooring replacement (CaTS) 30,000
Kids Area Lighting/Bench Millwork/Drywall 20,000
Window film 20,000
Loading Dock Railing 10,000
Ceiling Millwork 10,000
Outer automatic doors 20,000
Bathroom Fixtures and Walls 30,000
Bathroom Trap fix 50,000
Library total 100,000 20,000 40,000 - 40,000
Total capital including Library 2,091,020 1,389,000 1,852,000 1,269,000 1,444,000