Council Meeting/Documents/Northwest Trunk - Western Craigflower Pump Station Key Plan
Appendix

Northwest Trunk - Western Craigflower Pump Station Key Plan

April 30, 2013Page 431 section

Engineering key plan and high water event diagram for the pump station site.

1. CALL TO ORDER
High Water Event EL. 3.47m

NORTHWEST TRUNK - WESTERN

CRAIGFLOWER PUMP STATION - KEY PLAN

Engineering drawing of Northwest Trunk - Western Craigflower Pump Station Key Plan and Max. High Water Event Diagram
Engineering drawing of Northwest Trunk - Western Craigflower Pump Station Key Plan and Max. High Water Event Diagram

Drawing Labels and Annotations:

  • EXISTING PRIVATE ACCESS TO BUSINESS/RESIDENCE TO BE MAINTAINED DURING CONSTRUCTION
  • SHORELINE DRIVE
  • EXISTING PUMP STATION
  • SANITARY SEWER R.O.W.
  • NEW CRAIGFLOWER PUMP STATION
  • RAILWAY
  • ISLAND HIGHWAY
  • KEY PLAN SCALE 1:1500
  • 15-S155-C3 & 15-S155-C5
  • 15-S155-C10

MAX. HIGH WATER EVENT DIAGRAM

  • HORIZ. 1:250
  • VERT. 1:50
  • PUMP STATION EL. 3.47
  • EL. 3.27
  • EL. 2.81
  • +1.89 HW EVENT, STATION 7120 VICTORIA JANUARY 2, 2003
  • +1.83 HW EVENT, STATION 7120 VICTORIA DECEMBER 11, 1969

Project Information

Field Details
DESIGNED V.K.
SURVEYED J. TAIT
DRAWN C.L.
DATE 02/06/06
SCALE HORIZONTAL AS SHOWN
CHECKED P.D.
SCALE VERTICAL AS SHOWN
APPROVED L.P.

Revision History

NO. DATE REVISION ENGR. No.
0 13/06/08 100% DESIGN SUBMISSION

Document Identification

  • CONTRACT NUMBER: XX-XXXX
  • DRAWING NUMBER: 15-S155-C2
  • ISSUE: 0
  • AE PROJECT No.: 052728

Associated Engineering Information:

  • Associated Engineering
  • AE PROJECT No. 052728

Verify Scales:

  • BAR IS 30mm ON 0' —— 30mm
  • IF NOT 30mm ON THIS SHEET, ADJUST SCALES ACCORDINGLY
Page 43