Appendix
Northwest Trunk - Western Craigflower Pump Station Key Plan
April 30, 2013Page 431 section
Engineering key plan and high water event diagram for the pump station site.
High Water Event EL. 3.47m
NORTHWEST TRUNK - WESTERN
CRAIGFLOWER PUMP STATION - KEY PLAN

Drawing Labels and Annotations:
- EXISTING PRIVATE ACCESS TO BUSINESS/RESIDENCE TO BE MAINTAINED DURING CONSTRUCTION
- SHORELINE DRIVE
- EXISTING PUMP STATION
- SANITARY SEWER R.O.W.
- NEW CRAIGFLOWER PUMP STATION
- RAILWAY
- ISLAND HIGHWAY
- KEY PLAN SCALE 1:1500
- 15-S155-C3 & 15-S155-C5
- 15-S155-C10
MAX. HIGH WATER EVENT DIAGRAM
- HORIZ. 1:250
- VERT. 1:50
- PUMP STATION EL. 3.47
- EL. 3.27
- EL. 2.81
- +1.89 HW EVENT, STATION 7120 VICTORIA JANUARY 2, 2003
- +1.83 HW EVENT, STATION 7120 VICTORIA DECEMBER 11, 1969
Project Information
| Field | Details |
|---|---|
| DESIGNED | V.K. |
| SURVEYED | J. TAIT |
| DRAWN | C.L. |
| DATE | 02/06/06 |
| SCALE HORIZONTAL | AS SHOWN |
| CHECKED | P.D. |
| SCALE VERTICAL | AS SHOWN |
| APPROVED | L.P. |
Revision History
| NO. | DATE | REVISION | ENGR. | No. |
|---|---|---|---|---|
| 0 | 13/06/08 | 100% DESIGN SUBMISSION |
Document Identification
- CONTRACT NUMBER: XX-XXXX
- DRAWING NUMBER: 15-S155-C2
- ISSUE: 0
- AE PROJECT No.: 052728
Associated Engineering Information:
- Associated Engineering
- AE PROJECT No. 052728