Public Hearing/Documents/Appendix B: Water Network – Figure 2 and FUS Calculations
Appendix

Appendix B: Water Network – Figure 2 and FUS Calculations

November 17, 2020Pages 108–1092 sections

An engineering drawing of the proposed water network upgrades and hydrant locations for the site.

1 CALL TO ORDER
9 Erskine LaneProposed W 300mm PVC water main upgrade

APPENDIX B

Page 108–109

WATER NETWORK – FIGURE 2 AND FUS CALCULATIONS

9 ERSKINE LANE WATER NETWORK - FIGURE 2

TOWN OF VIEW ROYAL

[Diagram: Site plan of 9 Erskine Lane showing the water network layout for four proposed buildings (A, B, C, and D) and surrounding water infrastructure.]

Project Details:

  • Civic Address: 9 Erskine Lane, Lot B, Town of View Royal, Plan VIP26648
  • Date: October 2, 2019
  • Issue Date: Oct 09, 2019
  • Project No: IEL Project - 2253
  • Scale: 1:750
  • Drawn By: KK
  • Checked By: MJA
  • Status: For Discussion Purposes Only

Building Information:

  • Bldg A: 79 Units
  • Bldg B: 79 Units
  • Bldg C: 107 Units
  • Bldg D: 107 Units

Water Infrastructure:

  • Proposed Water Main Upgrade: W 300mmØ PVC
  • Existing Infrastructure:
    • Ex. W 200mmØ PVC
    • Existing Twin Trunk Supply Lines: Ex. Steel W 1200mmØ and Ex. Steel W 900mmØ
  • Proposed Fire Hydrants: Two locations identified along the new water main route.
Page 108–109