This site is in beta — data may be incomplete and features are still being added.
Public Hearing/Documents/APPENDIX D - STORMWATER MANAGEMENT - FIGURE 4
Appendix

APPENDIX D - STORMWATER MANAGEMENT - FIGURE 4

November 17, 2020Pages 118–1193 sections

Stormwater management site plan illustrating existing and proposed flow directions for the development.

1 CALL TO ORDER
9 Erskine LaneOctober 9, 2019Islander Engineering

APPENDIX D

Page 118–119

STORMWATER MANAGEMENT - FIGURE 4

Title page for Appendix D, Stormwater Management - Figure 4
Title page for Appendix D, Stormwater Management - Figure 4
Page 118–119

9 ERSKINE LANE - STORMWATER MANAGEMENT - FIGURE 4

TOWN OF VIEW ROYAL

[Map: Stormwater management site plan for 9 Erskine Lane, showing building footprints for Buildings A through D, site boundaries, and proposed rainwater management features relative to Stoneridge Wetland Park, Galloping Goose Trail, and Craigflower Creek.]

LEGEND

ON-SITE CATCHMENT AREA EXISTING FLOW DIRECTION PROPOSED FLOW DIRECTION
• NORTH — 0.8586 ha
• SOUTH — 1.4927 ha
[Arrow symbol] [Green arrow symbol]

FOR DISCUSSION PURPOSES ONLY OCTOBER 2, 2019

CIVIC ADDRESS: 9 ERSKINE LANE, LOT B, TOWN OF VIEW ROYAL, PLAN VIP26648

Site Features and Infrastructure

  • Buildings:
    • BLDG A (79 UNITS)
    • BLDG B (79 UNITS)
    • BLDG C (107 UNITS)
    • BLDG D (107 UNITS)
  • Surrounding Geography:
    • STONERIDGE WETLAND PARK
    • CRAIGFLOWER CREEK
  • Roadways and Trails:
    • WATKISS WAY
    • ERSKINE LANE
    • GALLOPING GOOSE TRAIL
    • TRANS CANADA HIGHWAY
  • Stormwater Management Features:
    • PROPOSED RAINWATER MANAGEMENT AREA
    • MIX OF OPEN DITCH AND CULVERTS TO CREEK
    • 9000 CSP (drainage culverts)

Project Information

  • IEL PROJECT: 2253
  • ISSUED: OCT 09, 2019
  • DRAWN BY: KK
  • CHECKED BY: MJA
  • SCALE: 1:1250 (0m to 75m graphic scale)
Page 118–119

Document Images

(2)
Document image
Document image
Extracted from: 2020 11 17 Public Hearing - Agenda - Pdf