Appendix
APPENDIX D - STORMWATER MANAGEMENT - FIGURE 4
November 17, 2020Pages 118–1193 sections
Stormwater management site plan illustrating existing and proposed flow directions for the development.
9 Erskine LaneOctober 9, 2019Islander Engineering
APPENDIX D
Page 118–119
Page 118–119
9 ERSKINE LANE - STORMWATER MANAGEMENT - FIGURE 4
TOWN OF VIEW ROYAL
[Map: Stormwater management site plan for 9 Erskine Lane, showing building footprints for Buildings A through D, site boundaries, and proposed rainwater management features relative to Stoneridge Wetland Park, Galloping Goose Trail, and Craigflower Creek.]
LEGEND
| ON-SITE CATCHMENT AREA | EXISTING FLOW DIRECTION | PROPOSED FLOW DIRECTION |
|---|---|---|
| • NORTH — 0.8586 ha • SOUTH — 1.4927 ha |
[Arrow symbol] | [Green arrow symbol] |
FOR DISCUSSION PURPOSES ONLY OCTOBER 2, 2019
CIVIC ADDRESS: 9 ERSKINE LANE, LOT B, TOWN OF VIEW ROYAL, PLAN VIP26648
Site Features and Infrastructure
- Buildings:
- BLDG A (79 UNITS)
- BLDG B (79 UNITS)
- BLDG C (107 UNITS)
- BLDG D (107 UNITS)
- Surrounding Geography:
- STONERIDGE WETLAND PARK
- CRAIGFLOWER CREEK
- Roadways and Trails:
- WATKISS WAY
- ERSKINE LANE
- GALLOPING GOOSE TRAIL
- TRANS CANADA HIGHWAY
- Stormwater Management Features:
- PROPOSED RAINWATER MANAGEMENT AREA
- MIX OF OPEN DITCH AND CULVERTS TO CREEK
- 9000 CSP (drainage culverts)
Project Information
- IEL PROJECT: 2253
- ISSUED: OCT 09, 2019
- DRAWN BY: KK
- CHECKED BY: MJA
- SCALE: 1:1250 (0m to 75m graphic scale)
Page 118–119
Extracted from: 2020 11 17 Public Hearing - Agenda - Pdf


