Appendix

SITE PLAN

June 16, 2020Page 631 section

Detailed engineering site plan including building footprints, woonerf area, and community green space.

1 CALL TO ORDER
McElhanneyJanuary 23, 2020Proposed Buildings #1, #2, and #3

Eagles Nest Residences - Site Plan

Project: Eagles Nest Residences, View Royal, B.C. Title: Site Plan Date: January 23, 2020 Status: Issued for Rezoning Drawing No: 18-095-SK.1 Consultant: McElhanney (500 - 3960 Quadra Street, Victoria, BC V8X 4A3)

Sheet Notes

  1. For building information, see drawings by HC Hood Kierulf Architects.
  2. For landscaping including trees (proposed, to be removed and to remain), see drawings by Murdoch de Greeff Inc. Landscaping Planning & Design.
  3. For geotechnical assessment, see report by Ryzuk Geotechnical Engineering & Materials Testing.
  4. Utility sizes and locations to be confirmed during detailed design and are subject to change.
  5. All rainwater leaders to outlet to rain gardens. Rain gardens to be interconnected and outlet to be tied into municipal system.
  6. Rain garden size, configuration depth, etc. to be determined during detailed design.
  7. See landscape drawings for rain garden details.
  8. Offsite watermain upgrades, if required, to be determined during detailed design.
  9. Fire department connection locations to be confirmed.
  10. Connection to existing offsite storm drainage to be confirmed.
  11. Main floor elevations subject to change during detailed design.
  12. All existing houses, driveways, retaining walls, sheds, etc. to be removed and disposed off-site.
  13. Installation of gas, if required, to be coordinated with FortisBC during detailed design.
  14. Location of bus bay to be confirmed during detailed design with BC Transit and Town of View Royal.

Sheet Notes (Legend Symbols)

No. Description
(E) Existing water service to be capped & abandoned by CRD forces at developer's expense or be utilized for boulevard irrigation.
(E) Utility pole to be removed / relocated. Details to be confirmed with BC Hydro/Telus/Shaw.

Revision Table

No. Date By Revisions
3 2020-01-23 ND Issued for Rezoning
2 2019-06-25 ND Issued for Rezoning
1 2018-09-14 ND Issued for Rezoning

Benchmark Information

  • Drawing coordinates are local based on UTM NAD 83 reference monument MON No. 80H3083
  • Northing: 5368555.853
  • Easting: 468628.135
  • Elevation: 27.603m
  • Comb. C.S.F.: 0.9996106
  • All distances are ground level distances and elevations are geodetic elevations.

Project Details

  • Scale: Horiz. 1:250 / Vert. N/A
  • Project No: 18-095
  • Issued/Revision: 3
  • Drawing No: 18-095-SK.1
Page 63