APPENDIX A: ROADWAY MODIFICATION QUEUE LENGTH IMPACTS
June 16, 2020Pages 253–2541 section
Visual diagrams illustrating existing and estimated 2028 post-development traffic queue lengths during PM peak hours.
PM PEAK HOUR95% QUEUE LENGTHSMarch 27, 2019
APPENDIX A: ROADWAY MODIFICATION QUEUE LENGTH IMPACTS
Eagle Nest Helmcken Road Report

QUEUE LENGTHS (PM PEAK HOUR) EXISTING AND PROPOSED LANING HELMCKEN RD / BURNSIDE RD
EXISTING QUEUE LENGTHS
(Map showing 95% queue lengths under existing conditions at the intersection of Helmcken Road, Watkiss Way, and Burnside Road.)
ESTIMATED 2028 POST DEVELOPMENT QUEUE LENGTHS WITH PROPOSED LANING UPGRADES
(Map showing projected 95% queue lengths for 2028, including background volumes and additional traffic from the proposed Eagle Nest Development.)
Legend
- 95% QUEUE LENGTHS - EXISTING CONDITIONS (Red line)
- 95% QUEUE LENGTHS - PROPOSED LANE CHANGES WITH 2028 BACKGROUND VOLUMES (Blue line)
- ADDITIONAL QUEUE LENGTH DUE TO PROPOSED DEVELOPMENT TRAFFIC (Yellow line)
Project and Drawing Information
- Project: Eagle Nest - Helmcken Road Report
- Project No: 2497.B01
- Drawing No: (Not specified)
- Date: MAR 27, 2019
- Designed: TV
- Drawn: TV
- Scale: 1:2,500
- Address: #501, 740 - Hillside Ave, Victoria, BC V8B TZ4