1 CALL TO ORDER
Addresses Glentana Road landscaping and residential screeningIncludes plans for a proposed pedestrian overpass and truck sewerIncludes topographic plans for the Glentana Housing developmentArchitect: Donald Macpherson; Engineers: Ker, Priestman & Associates Ltd.

Glentana Road Landscaping

Site plan overview showing landscaping layout for the Glentana Village development
Site plan overview showing landscaping layout for the Glentana Village development

Project Information

  • Drawing No: 7
  • Architect: Donald MacPherson Architect, 582 Goldstream Ave, Victoria, B.C.
  • Landscape Design: K.D. Hartwig, 1870 McKenzie
  • Client: Glentana Village: Aske Construction Ltd.

Landscaping Notes

  • Planting for Type B units to be done by Builder.
    Detail of Unit C area showing unit layout and landscaping
    Detail of Unit C area showing unit layout and landscaping
  • Retain existing trees on future road allowance.
  • Bank planting ground cover: Hypericum calycinum.
  • Screening hedge: Pyracantha, 6'-0".
  • Screening Type B planting as indicated in the following way:
    • A: Trees, min. 12'-0"
    • B: Shrubs, min. 3'-0"
  • Trees along road to be planted about 40' apart. Species to be mainly Pinus nigra austriaca.
Drawing title block for Glentana Road Landscaping
Drawing title block for Glentana Road Landscaping
Text labels for map areas E, D, F, G
Text labels for map areas E, D, F, G
Notes detailing screening specifications for Type B planting
Notes detailing screening specifications for Type B planting
North arrow and label for Glentana Road
North arrow and label for Glentana Road

Page 245–252

Residential Screening

Overview of residential screening plans for Area 'D'
Overview of residential screening plans for Area 'D'

Project Information

  • Drawing No: 8
  • Landscape Design: K.D. Hartwig, 1870 McKenzie
  • Schedule: C

Example of Berming for Area 'D' (North Side)

  • Plot Plan:
    Plot plan for the north side of Area D
    Plot plan for the north side of Area D
  • Notes:
    • The berm is to be planted with a ground cover as well as some accent seed shrubs in groups.
    • Shrubs: Cytisus praecox.
    • Ground Cover: Hypericum calycinum.
  • Sketch Drawing:
    Label for Area D North Side sketch
    Label for Area D North Side sketch
    ,
    Section drawing showing the proposed berm profile for Area D North Side
    Section drawing showing the proposed berm profile for Area D North Side

Example of Berming for Area 'D' (West Side)

  • Plot Plan:
    Plot plan showing dimensions and yard area for the west side of Area D
    Plot plan showing dimensions and yard area for the west side of Area D
  • Notes:
    • The berm is to be planted with a ground cover as well as some accent seed shrubs in groups.
    • Shrubs: Cytisus praecox.
    • Ground Cover: Hypericum calycinum.
  • Sketch Drawing:
    Detail sketch of the berm profile for Area D West Side
    Detail sketch of the berm profile for Area D West Side
    ,
    Section drawing detail with 'Example' text
    Section drawing detail with 'Example' text
Title block and general notes for residential screening
Title block and general notes for residential screening

Page 245–252

Parkland Screening

Parkland site plan showing the northern fence line and area boundary
Parkland site plan showing the northern fence line and area boundary

Project Information

  • Drawing No: 9
  • Landscape Design: K.D. Hartwig, 1870 McKenzie
  • Schedule: C

Area 'H' Development

  • Note 1: In this area, the path is natural, keeping with the natural feel of the area. All trees listed as 'to be removed' are dead trees only. Trees are to be pruned to give a clear view of the entry passage.
    Parkland screening title block and initial landscaping notes
    Parkland screening title block and initial landscaping notes
  • Note 2:
    • This area to be retained in its natural state.
    • The existing paths (primary) are to be covered with a layer of wood chips.
    • Low hanging branches above paths are to be pruned.
    Additional notes regarding natural state and path maintenance
    Additional notes regarding natural state and path maintenance
  • Pathway Detail: Pathway to continue under railway to Portage Park.
    Map detail showing existing tree line and the proposed pathway
    Map detail showing existing tree line and the proposed pathway
  • Site Features:
    Label for Area H
    Label for Area H
    ,
    Sketch detail of area H site features
    Sketch detail of area H site features
North arrow and fence line labels for the parkland area
North arrow and fence line labels for the parkland area
Title block for Drawing 9, Parkland Screening
Title block for Drawing 9, Parkland Screening

Page 245–252

Topographic Plan - Sheet 2

Topographic map detailing existing conditions around Craigflower Road and Shoreline Drive
Topographic map detailing existing conditions around Craigflower Road and Shoreline Drive

Project Information

  • Drawing No: 1181-SK 4
  • Project: Aske Construction Ltd., Glentana Housing
  • Consulting Engineers: Ker, Priestman & Associates Ltd.
  • Date: Sept 1976

General Notes

  1. Elec. & Tel. site improvements by Developer.
  2. Storm drain on Glentana Rd by Developer.
  3. Watermain on Glentana Rd by Developer.
  4. Excavation of sanitary sewer on Glentana Rd by Developer.
  5. Elevate berm on both sides of Glentana Rd to be seeded by Developer.
  6. Sanitary sewer on Craigflower Road [details specified].
  7. [Proposed] Road from railway crossing up to the [limits] and to the [design] of the District Engineer of the Regional District.
  8. Pedestrian bridge over Craigflower Road.
Location plan inset showing the project site relative to View Royal and Esquimalt
Location plan inset showing the project site relative to View Royal and Esquimalt
Note list section overview
Note list section overview
Detail of notes for storm drains and watermains
Detail of notes for storm drains and watermains
Site details showing rights-of-way and property lines
Site details showing rights-of-way and property lines
Labels for Shoreline Drive and Craigflower Road on the topographic map
Labels for Shoreline Drive and Craigflower Road on the topographic map
Detail showing notes 2 through 5
Detail showing notes 2 through 5
Property line and topographic contour details
Property line and topographic contour details
Title block and first section of general notes
Title block and first section of general notes
Topographic details for the area surrounding Craigflower Road
Topographic details for the area surrounding Craigflower Road
Contours and property boundaries near Shoreline Drive
Contours and property boundaries near Shoreline Drive
Boundary and topographic feature details
Boundary and topographic feature details

Page 245–252

Plan of Proposed Trunk Sewer

Plan showing the proposed trunk sewer line layout near Portage Inlet
Plan showing the proposed trunk sewer line layout near Portage Inlet

Project Information

  • Drawing No: 1181-SK 11
  • Project: Aske Construction Ltd., Glentana Housing
  • Consulting Engineers: Ker, Priestman & Associates Ltd.
  • Date: Sept 21 1977

Schedule D - Dwg. 11 Notes

  1. Pumping station to be constructed entirely at the cost of the Developer to the design specifications approved by Chief Engineer of the Regional District prior to any work being undertaken.
  2. Pedestrian ramp over Craigflower Road.
  3. Pedestrian underpass beneath E & N Railway.
  4. Highway & Parkway improvements as req'd by Dept. of Highways.
Notes and title block overview for the trunk sewer plan
Notes and title block overview for the trunk sewer plan
Topographic contours and trunk sewer line details
Topographic contours and trunk sewer line details
Title block detail for drawing 1181-SK 11
Title block detail for drawing 1181-SK 11
Detail showing sewer line connection points
Detail showing sewer line connection points
Note section detailing items 2 through 4 and title block
Note section detailing items 2 through 4 and title block
Sewer line layout details near Shoreline Drive
Sewer line layout details near Shoreline Drive
Legend for on-site services and site boundary information
Legend for on-site services and site boundary information
Drawing number 1181-SK 11 identification label
Drawing number 1181-SK 11 identification label
Sewer line layout in the vicinity of Shoreline School
Sewer line layout in the vicinity of Shoreline School
Map labels for Portage Inlet and Craigflower Road
Map labels for Portage Inlet and Craigflower Road
Detail of sewer trunk line and project boundary lines
Detail of sewer trunk line and project boundary lines

Page 245–252

Plan of On-Site Services

Site plan showing the layout of on-site utility services along Glentana Road
Site plan showing the layout of on-site utility services along Glentana Road

Project Information

  • Drawing No: 1181-SK 12
  • Project: Aske Construction Ltd., Glentana Housing
  • Consulting Engineers: Ker, Priestman & Associates Ltd.
  • Date: Sep 1977

Service Notes

  • E & N Railway Underpass (For details see Dwg. No. 14, Schedule D of L.U.C. 7-75).
  • Connections to View Royal Sanitary Sewer to be constructed as part of this development contract.
Services map detail including note for plan continuation
Services map detail including note for plan continuation
Title block and specific note regarding the railway underpass
Title block and specific note regarding the railway underpass
Plan detail showing site layout and property boundaries
Plan detail showing site layout and property boundaries
Notes concerning sanitary sewer connections and railway underpass details
Notes concerning sanitary sewer connections and railway underpass details
Layout plan featuring the Glentana Road area
Layout plan featuring the Glentana Road area
Boundary line identification and drawing number label
Boundary line identification and drawing number label
Label indicating the proposed fire access route
Label indicating the proposed fire access route
Detail of the underground service line layout
Detail of the underground service line layout
Legend for utility services: Storm Drain, Watermain, etc.
Legend for utility services: Storm Drain, Watermain, etc.
Map section showing Glentana Road site layout
Map section showing Glentana Road site layout
Property line and project boundary details
Property line and project boundary details

Page 245–252

Pedestrian Overpass Details

Layout plan for the proposed pedestrian overpass over Island Highway
Layout plan for the proposed pedestrian overpass over Island Highway

Project Information

  • Schedule D, Dwg. 13
  • Project: Aske Construction Ltd., Capital Regional District Land Use Contract 7-76
  • Consulting Engineers: Read Jones Christoffersen Ltd.
  • Status: Progress Print - Preliminary - Not for Construction

Drawing Components

  • Plan Scale: 1/8" = 1'-0"
  • Plan Showing Layout of Proposed Pedestrian Overpass:
    Overview of the layout plan for the overpass structure
    Overview of the layout plan for the overpass structure
  • Elevation for Pedestrian Bridge:
    Detailed elevation view of the pedestrian bridge
    Detailed elevation view of the pedestrian bridge
  • Ramp Section:
    Structural section details for the pedestrian ramp
    Structural section details for the pedestrian ramp
  • Railing Detail:
    Title block and railing design specifications
    Title block and railing design specifications

Design Notes

  • For length of ramp will vary according to actual site elevations. All ramps at 12 1/2 % slope.
    Detail of pedestrian bridge plan and ramp slope specification
    Detail of pedestrian bridge plan and ramp slope specification
  • Locations: Island Highway (1A), Glentana Cul-de-Sac.
Site labels for existing driveway and fire access points
Site labels for existing driveway and fire access points
North arrow for the pedestrian bridge layout plan
North arrow for the pedestrian bridge layout plan
Dimensions and detailed labels for structural elements
Dimensions and detailed labels for structural elements
Note section and engineering firm information from the title block
Note section and engineering firm information from the title block
Map labels for the overpass plot plan
Map labels for the overpass plot plan

Page 245–252

C.P. Railway Pedestrian Underpass

Plan and profile overview of the pedestrian underpass under the railway
Plan and profile overview of the pedestrian underpass under the railway

Project Information

  • Drawing No: 1181-SK 14
  • Project: Aske Construction Ltd., Glentana Housing
  • Consulting Engineers: Ker, Priestman & Associates Ltd.
  • Date: Sept 1977

Engineering Specifications

  • Note 1: P. Aluminum underpass to be 8 gauge corrugated structural plate pipe. Rise 6'-8", Span 5'-2".
    Note on underpass material and structural plate pipe details
    Note on underpass material and structural plate pipe details

Drawing Components

  • Plan: Scale 1" = 10'
  • Profile: Scale 1" = 10' Hor. & Vert.
  • Key Features: Main Track, Siding, Ramp, Concrete Retaining Wall.
Profile and plan detail of the railway crossing
Profile and plan detail of the railway crossing
Title block for Drawing 1181-SK 14
Title block for Drawing 1181-SK 14
Profile detail showing depth and grade
Profile detail showing depth and grade
Labels for the plan and profile views
Labels for the plan and profile views
Plan and profile identification labels
Plan and profile identification labels
Detailed view of the underpass structure and notes
Detailed view of the underpass structure and notes
Page 245–252
Extracted from: 2022 05 17 Council Agenda - Agenda - Pdf