Council Meeting/Documents/Underground Parking Plan - 280 Island Highway (Attachment 4)
Appendix

Underground Parking Plan - 280 Island Highway (Attachment 4)

July 19, 2022Page 282 sections

An architectural drawing (A2.0) detailing the underground parking layout for the residential development at 280 Island Highway.

1 CALL TO ORDER
280 Island Highway40 stalls total (33 underground, 7 surface)October 25, 2019Alan Lowe Architect Inc.

Underground Parking

280 Island Highway Residential Development Victoria, BC

Note: BH = U-HOOK BIKE RACK

Summary of Stalls:

  • 33 Underground Stalls
  • 7 Surface Stalls
  • 40 Stalls Total

Wall Assembly Schedule

Floor Assemblies

  • F1: Slab on Grade:
    • Reinforced concrete slab as per structural drawings
    • 10 mil poly moisture barrier
    • 2" [51] sand binding
    • 6" [100] compact granular fill
    • Undisturbed bearing or compact engineered fill
  • F2: Wood Floor Assembly (F.R.R. 1 HR. - STC 56):
    • Finished flooring as per finish schedule
    • 1 1/2" (38mm) concrete overlay
    • Floor system (see structural)
    • Metal resilient furring channels @ 600 O/C
    • 2 layers 15.9 mm type 'X' G.W.B.
    • Floor type F19b B.C.B.C. 2012
  • F3a: Concrete Suspended Slab (Occupied Space - Heated):
    • Finished floor covering
    • Reinforced concrete slab - see structural
    • min. R-12 spray applied non-combustible insulation.
  • F3b: Concrete Suspended Slab (Landscape Area):
    • Earth fill (see landscape)
    • 4" P gravel with filter cloth
    • Drainmat
    • 2ply torch-on membrane
    • Reinforced concrete slab - see structural
  • F4: Suspended Deck:
    • 60mil vinyl deck membrane
    • Floor system (see structural)
    • P.F.M. vented soffit
  • F5: Interior Floor over Exterior Space (F.R.R. 1 HR. - STC 56):
    • Finished flooring as per finish schedule
    • 1 1/2" (38mm) concrete overlay
    • Floor system (see structural)
    • Spray foam insulation to joist cavities (R30)
    • Metal soffit
  • F6: Deck over Interior Space:
    • Concrete pavers on pedestals
    • 2 ply SBS modified bituminous membrane
    • 180 FR granular cap sheet on 180 flam sheet
    • 1/4" [6mm] protection board
    • 5/8" [15.9] T&G ply on joists as per structural
    • Cross strapping to create 2.5" min. between insul. and sheathing
    • Batt insulation to achieve R31
    • Resilient metal furring channel
    • 2 layer 5/8" [15.9] type 'X' G.W.B.

Foundation / Exterior Wall Assemblies

  • W1: Foundation Wall Assembly (Below Grade):
    • Granular backfill
    • Drainmat
    • 2ply torch-on membrane
    • Reinforced concrete wall (see struc.)
  • W2: Exterior Wall Assembly (T&G Wood Rainscreen):
    • Horizontal T&G wood siding on 3/4" x 3 [19 x 76] P.T. vert. strapping at 16" [400] O.C. at wood stud locations
    • Nonwoven polyethylene building wrap
    • 1/2" [12.7] ply sheathing
    • 5 1/2" [140] wood stud at 16" [400] O.C.
    • RSI 3.9 (R-20) batt insulation to stud cavities
    • 6 mil poly vapour / air barrier
    • 5/8" (16) G.W.B.
  • W2s: W2 with seismic sheathing where required. See structural.
  • W3: Exterior Wall Assembly (Stucco Rainscreen Finish):
    • Acrylic stucco (3 coats)
    • Wire lath c/w building paper slip sheet
    • Breather backer board
    • 1 x 3 [19 x 76] P.W.T. vert. strapping at 8" [200] O.C.
    • Nonwoven polyethylene building wrap
    • 1/2" [12.7] ply sheathing
    • 5 1/2" [140] wood stud at 16" [400] O.C.
    • RSI 3.9 (R-20) batt insulation to stud cavities
    • 6 mil poly vapour barrier
    • 5/8" [16] type 'X' gypsum wall board
    • Wall finish as per room finish schedule
  • W3s: W3 with seismic sheathing where required. See structural.
  • W5: Concrete Masonry (Hollow Core Concrete Masonry Unit - CMU):
    • 8" concrete masonry block
    • (F.R.R. 1 1/2 HR. - STC 50)
    • Wall type B1b B.C.B.C. 2012

Int. Partition / Shaft Wall Assemblies

  • P1: Partition Assembly (Wall Type W1d - STC 32 B.C.B.C. 2012):
    • Wall finish as per room finish schedule
    • 1/2" [12.7] G.W.B. both sides of:
      • P1: 3 1/2" [90] wood studs at 16" [400] O.C. OR
      • P1a: 5 1/2" [140] wood studs at 16" [400] O.C.
    • 3 1/2" [89] acoustic batt insul. to stud cavities
    • Wall finish as per room finish schedule
  • P2: Party Wall Assembly (1 HR. F.R.R. STC 61 Wall Type W14a B.C.B.C. 2012):
    • Wall finish as per room finish schedule
    • 1 layer 5/8" [15.9] type 'X' G.W.B.
    • 1 1/2" [38] x 3 1/2" [89] wood studs at 16" [400] O.C.
    • 1" [25] air separation
    • 1 1/2" [38] x 3 1/2" [89] wood studs at 16" [400] O.C.
    • 3 1/2" [89] mineral fibre insul. to each side
    • 2 layers 5/8" [15] type 'X' G.W.B.
  • P2s: Party Wall - Shear Assembly: Wall P2 with seismic sheathing where required. See structural. (Typically noted for all wall types)
  • P3: Corridor Wall Assembly (1 HR. F.R.R. STC 56 Wall Type W11a B.C.B.C. 2012):
    • Wall finish as per room finish schedule
    • 1 layer 5/8" [15.9] type 'X' G.W.B.
    • 2 rows 1 1/2" [38] x 3 1/2" [89] wood studs at 16" [400] O.C. staggered on common 1 1/2" [38] x 5 1/2" [140] plate with:
      • 3 1/2" [89] mineral fibre insul. to stud cavities
    • Resilient metal channels @ 24" [600] O/C
    • 2 layers 5/8" [15] type 'X' G.W.B.
  • P3s: Corridor Wall - Shear Assembly: Wall P3 with seismic sheathing where required. Note: where corridor wall is shear wall, place resilient channels on suite side, plywood corridor side. See structural.
  • P4: Elevator Shaft Assembly:
    • 190 mm CMU masonry block (2 HR. F.R.R.) (concrete filled)
    • Wood bearing wall as required
    • See structural
    • 5/8" [15.9] type 'X' G.W.B. to be applied to all exposed faces
  • P4a: Elevator Shaft Assembly - Wood Frame (1 HR. F.R.R.) (S.T.C. 55 Required):
    • 2x6 wood wall as required
    • See structural
    • 5/8" [15.9] type 'X' G.W.B. to be applied to all exposed faces
  • P5: Rated Wall Assembly (1 HR. F.R.R. STC 54 Wall Type W4b B.C.B.C. 2012):
    • Wall finish as per room finish schedule
    • 1 layer 5/8" [15.9] type 'X' G.W.B.
    • Seismic sheathing if required. (See struc.)
    • 1 1/2" [38] x 5.5" [140] wood studs at 16" [400] O.C.
    • 5 1/2" [140] acoustic batt insul. to stud cavities
    • Resilient metal channels @ 24" [600] O/C
    • 2 layers 5/8" [15] type 'X' G.W.B.
  • P6: Rated Shaft Wall Assembly (1 HR. F.R.R. STC 39):
    • 15.9mm sheetrock gypsum firecode core panels (joints finished)
    • 64mm CGC C-H studs 25 ga. (600mm O/C)
    • 25.4 sheetrock gypsum liner panels
  • P7: Concrete Wall: See structural.
  • P8: Partition Assembly (Wall Type W1a - 1HR F.R.R. STC 36 B.C.B.C. 2012):
    • Wall finish as per room finish schedule
    • 5/8" [15.9] type 'X' G.W.B. both sides of:
      • 3 1/2" [89] wood studs at 16" [400] O.C.
    • 3 1/2" [89] acoustic batt insul. to stud cavities
    • Wall finish as per room finish schedule
  • P9: Partition Assembly (Wall Type W2a - 2HR F.R.R. STC 38 B.C.B.C. 2012):
    • 2 layers 5/8" [15.9] type 'X' G.W.B. both sides of:
      • 3 1/2" [89] wood studs at 16" [400] O.C.
    • 3 1/2" [89] acoustic batt insul. to stud cavities

Roof Assembly

  • R1: Flat Roof Assembly:
    • 2 ply SBS modified bituminous membrane
    • 180 FR granular cap sheet on 180 flam sheet
    • 1/4" protection board
    • Poly ISO rigid insulation to achieve R28
    • Self adhesive vapour barrier
    • 5/8" [15.9] T&G ply on TJI's as per structural
    • 6 mil. poly vapour barrier
    • 1 layer 5/8" [15.9] type 'X' G.W.B.
  • R2: Sloped Roof Assembly:
    • 2 ply SBS modified bituminous membrane
    • 180 FR granular cap sheet on 180 flam sheet
    • 1/4" protection board
    • 5/8" [15.9] T&G ply sheathing (as per structural) on TJI's (see structural)
    • Cross strapping for 2.5" min. clearance between insulation and sheathing
    • R40 batt insul to joist cavities
    • T&G wood soffit (exterior)
    • 6 mil poly vapour / air barrier
    • 1 layer 5/8" [15.9] type 'X' G.W.B. (interior)
    • 1/150 of roof area to be vented 2" from top of insulation to u/s sheathing

Project Information

Page 28

Alan Lowe Architect Inc. 118 - 21 Erie Street, Victoria, British Columbia t 250.360.2888

Project No.: 15-445 Date: 25 OCT 2019 Scale: AS NOTED Drawn By: JW-AA Checked By: LOWE Sheet No.: A2.0

Issue / Revisions

No. Issued / Revisions Date
1 DEVELOPMENT PERMIT 11 MAY '16
2 DEVELOPMENT PERMIT 31 MAY '16
3 DEVELOPMENT PERMIT 9 JUNE '16
4 DEVELOPMENT PERMIT 9 SEPT '16
5 FOUNDATION PERMIT 30 MARCH '17
6 BUILDING PERMIT 20 JUNE '17
7 BUILDING PERMIT 18 AUG. '17
8 ISSUED FOR CONSTRUCTION 15 FEB. '18
9 ISSUED FOR CONSTRUCTION 19 APRIL '18
10 ISSUED FOR CONSTRUCTION 1 MAY '18
11 ISSUED FOR CONSTRUCTION 7 MAY '18
12 ISSUED FOR CONSTRUCTION 5 JULY '18
13 DP AMENDMENT 25 OCT '19
14 DEVELOPMENT VARIANCE 18 FEB '22
Page 28