Appendix
Underground Parking Plan - 280 Island Highway (Attachment 4)
July 19, 2022Page 282 sections
An architectural drawing (A2.0) detailing the underground parking layout for the residential development at 280 Island Highway.
280 Island Highway40 stalls total (33 underground, 7 surface)October 25, 2019Alan Lowe Architect Inc.
Underground Parking
280 Island Highway Residential Development Victoria, BC
Note: BH = U-HOOK BIKE RACK
Summary of Stalls:
- 33 Underground Stalls
- 7 Surface Stalls
- 40 Stalls Total
Wall Assembly Schedule
Floor Assemblies
- F1: Slab on Grade:
- Reinforced concrete slab as per structural drawings
- 10 mil poly moisture barrier
- 2" [51] sand binding
- 6" [100] compact granular fill
- Undisturbed bearing or compact engineered fill
- F2: Wood Floor Assembly (F.R.R. 1 HR. - STC 56):
- Finished flooring as per finish schedule
- 1 1/2" (38mm) concrete overlay
- Floor system (see structural)
- Metal resilient furring channels @ 600 O/C
- 2 layers 15.9 mm type 'X' G.W.B.
- Floor type F19b B.C.B.C. 2012
- F3a: Concrete Suspended Slab (Occupied Space - Heated):
- Finished floor covering
- Reinforced concrete slab - see structural
- min. R-12 spray applied non-combustible insulation.
- F3b: Concrete Suspended Slab (Landscape Area):
- Earth fill (see landscape)
- 4" P gravel with filter cloth
- Drainmat
- 2ply torch-on membrane
- Reinforced concrete slab - see structural
- F4: Suspended Deck:
- 60mil vinyl deck membrane
- Floor system (see structural)
- P.F.M. vented soffit
- F5: Interior Floor over Exterior Space (F.R.R. 1 HR. - STC 56):
- Finished flooring as per finish schedule
- 1 1/2" (38mm) concrete overlay
- Floor system (see structural)
- Spray foam insulation to joist cavities (R30)
- Metal soffit
- F6: Deck over Interior Space:
- Concrete pavers on pedestals
- 2 ply SBS modified bituminous membrane
- 180 FR granular cap sheet on 180 flam sheet
- 1/4" [6mm] protection board
- 5/8" [15.9] T&G ply on joists as per structural
- Cross strapping to create 2.5" min. between insul. and sheathing
- Batt insulation to achieve R31
- Resilient metal furring channel
- 2 layer 5/8" [15.9] type 'X' G.W.B.
Foundation / Exterior Wall Assemblies
- W1: Foundation Wall Assembly (Below Grade):
- Granular backfill
- Drainmat
- 2ply torch-on membrane
- Reinforced concrete wall (see struc.)
- W2: Exterior Wall Assembly (T&G Wood Rainscreen):
- Horizontal T&G wood siding on 3/4" x 3 [19 x 76] P.T. vert. strapping at 16" [400] O.C. at wood stud locations
- Nonwoven polyethylene building wrap
- 1/2" [12.7] ply sheathing
- 5 1/2" [140] wood stud at 16" [400] O.C.
- RSI 3.9 (R-20) batt insulation to stud cavities
- 6 mil poly vapour / air barrier
- 5/8" (16) G.W.B.
- W2s: W2 with seismic sheathing where required. See structural.
- W3: Exterior Wall Assembly (Stucco Rainscreen Finish):
- Acrylic stucco (3 coats)
- Wire lath c/w building paper slip sheet
- Breather backer board
- 1 x 3 [19 x 76] P.W.T. vert. strapping at 8" [200] O.C.
- Nonwoven polyethylene building wrap
- 1/2" [12.7] ply sheathing
- 5 1/2" [140] wood stud at 16" [400] O.C.
- RSI 3.9 (R-20) batt insulation to stud cavities
- 6 mil poly vapour barrier
- 5/8" [16] type 'X' gypsum wall board
- Wall finish as per room finish schedule
- W3s: W3 with seismic sheathing where required. See structural.
- W5: Concrete Masonry (Hollow Core Concrete Masonry Unit - CMU):
- 8" concrete masonry block
- (F.R.R. 1 1/2 HR. - STC 50)
- Wall type B1b B.C.B.C. 2012
Int. Partition / Shaft Wall Assemblies
- P1: Partition Assembly (Wall Type W1d - STC 32 B.C.B.C. 2012):
- Wall finish as per room finish schedule
- 1/2" [12.7] G.W.B. both sides of:
- P1: 3 1/2" [90] wood studs at 16" [400] O.C. OR
- P1a: 5 1/2" [140] wood studs at 16" [400] O.C.
- 3 1/2" [89] acoustic batt insul. to stud cavities
- Wall finish as per room finish schedule
- P2: Party Wall Assembly (1 HR. F.R.R. STC 61 Wall Type W14a B.C.B.C. 2012):
- Wall finish as per room finish schedule
- 1 layer 5/8" [15.9] type 'X' G.W.B.
- 1 1/2" [38] x 3 1/2" [89] wood studs at 16" [400] O.C.
- 1" [25] air separation
- 1 1/2" [38] x 3 1/2" [89] wood studs at 16" [400] O.C.
- 3 1/2" [89] mineral fibre insul. to each side
- 2 layers 5/8" [15] type 'X' G.W.B.
- P2s: Party Wall - Shear Assembly: Wall P2 with seismic sheathing where required. See structural. (Typically noted for all wall types)
- P3: Corridor Wall Assembly (1 HR. F.R.R. STC 56 Wall Type W11a B.C.B.C. 2012):
- Wall finish as per room finish schedule
- 1 layer 5/8" [15.9] type 'X' G.W.B.
- 2 rows 1 1/2" [38] x 3 1/2" [89] wood studs at 16" [400] O.C. staggered on common 1 1/2" [38] x 5 1/2" [140] plate with:
- 3 1/2" [89] mineral fibre insul. to stud cavities
- Resilient metal channels @ 24" [600] O/C
- 2 layers 5/8" [15] type 'X' G.W.B.
- P3s: Corridor Wall - Shear Assembly: Wall P3 with seismic sheathing where required. Note: where corridor wall is shear wall, place resilient channels on suite side, plywood corridor side. See structural.
- P4: Elevator Shaft Assembly:
- 190 mm CMU masonry block (2 HR. F.R.R.) (concrete filled)
- Wood bearing wall as required
- See structural
- 5/8" [15.9] type 'X' G.W.B. to be applied to all exposed faces
- P4a: Elevator Shaft Assembly - Wood Frame (1 HR. F.R.R.) (S.T.C. 55 Required):
- 2x6 wood wall as required
- See structural
- 5/8" [15.9] type 'X' G.W.B. to be applied to all exposed faces
- P5: Rated Wall Assembly (1 HR. F.R.R. STC 54 Wall Type W4b B.C.B.C. 2012):
- Wall finish as per room finish schedule
- 1 layer 5/8" [15.9] type 'X' G.W.B.
- Seismic sheathing if required. (See struc.)
- 1 1/2" [38] x 5.5" [140] wood studs at 16" [400] O.C.
- 5 1/2" [140] acoustic batt insul. to stud cavities
- Resilient metal channels @ 24" [600] O/C
- 2 layers 5/8" [15] type 'X' G.W.B.
- P6: Rated Shaft Wall Assembly (1 HR. F.R.R. STC 39):
- 15.9mm sheetrock gypsum firecode core panels (joints finished)
- 64mm CGC C-H studs 25 ga. (600mm O/C)
- 25.4 sheetrock gypsum liner panels
- P7: Concrete Wall: See structural.
- P8: Partition Assembly (Wall Type W1a - 1HR F.R.R. STC 36 B.C.B.C. 2012):
- Wall finish as per room finish schedule
- 5/8" [15.9] type 'X' G.W.B. both sides of:
- 3 1/2" [89] wood studs at 16" [400] O.C.
- 3 1/2" [89] acoustic batt insul. to stud cavities
- Wall finish as per room finish schedule
- P9: Partition Assembly (Wall Type W2a - 2HR F.R.R. STC 38 B.C.B.C. 2012):
- 2 layers 5/8" [15.9] type 'X' G.W.B. both sides of:
- 3 1/2" [89] wood studs at 16" [400] O.C.
- 3 1/2" [89] acoustic batt insul. to stud cavities
- 2 layers 5/8" [15.9] type 'X' G.W.B. both sides of:
Roof Assembly
- R1: Flat Roof Assembly:
- 2 ply SBS modified bituminous membrane
- 180 FR granular cap sheet on 180 flam sheet
- 1/4" protection board
- Poly ISO rigid insulation to achieve R28
- Self adhesive vapour barrier
- 5/8" [15.9] T&G ply on TJI's as per structural
- 6 mil. poly vapour barrier
- 1 layer 5/8" [15.9] type 'X' G.W.B.
- R2: Sloped Roof Assembly:
- 2 ply SBS modified bituminous membrane
- 180 FR granular cap sheet on 180 flam sheet
- 1/4" protection board
- 5/8" [15.9] T&G ply sheathing (as per structural) on TJI's (see structural)
- Cross strapping for 2.5" min. clearance between insulation and sheathing
- R40 batt insul to joist cavities
- T&G wood soffit (exterior)
- 6 mil poly vapour / air barrier
- 1 layer 5/8" [15.9] type 'X' G.W.B. (interior)
- 1/150 of roof area to be vented 2" from top of insulation to u/s sheathing
Project Information
Page 28
Alan Lowe Architect Inc. 118 - 21 Erie Street, Victoria, British Columbia t 250.360.2888
Project No.: 15-445 Date: 25 OCT 2019 Scale: AS NOTED Drawn By: JW-AA Checked By: LOWE Sheet No.: A2.0
Issue / Revisions
| No. | Issued / Revisions | Date |
|---|---|---|
| 1 | DEVELOPMENT PERMIT | 11 MAY '16 |
| 2 | DEVELOPMENT PERMIT | 31 MAY '16 |
| 3 | DEVELOPMENT PERMIT | 9 JUNE '16 |
| 4 | DEVELOPMENT PERMIT | 9 SEPT '16 |
| 5 | FOUNDATION PERMIT | 30 MARCH '17 |
| 6 | BUILDING PERMIT | 20 JUNE '17 |
| 7 | BUILDING PERMIT | 18 AUG. '17 |
| 8 | ISSUED FOR CONSTRUCTION | 15 FEB. '18 |
| 9 | ISSUED FOR CONSTRUCTION | 19 APRIL '18 |
| 10 | ISSUED FOR CONSTRUCTION | 1 MAY '18 |
| 11 | ISSUED FOR CONSTRUCTION | 7 MAY '18 |
| 12 | ISSUED FOR CONSTRUCTION | 5 JULY '18 |
| 13 | DP AMENDMENT | 25 OCT '19 |
| 14 | DEVELOPMENT VARIANCE | 18 FEB '22 |