This site is in beta — data may be incomplete and features are still being added.
Council Meeting/Documents/A102 LEVEL 5 & ROOF PLANS
Appendix

A102 LEVEL 5 & ROOF PLANS

September 6, 2022Page 481 section

Detailed architectural floor plans for level 5 and the rooftop area.

1 CALL TO ORDER
Level 5 PlanRoof Plan

PORTAGE PARK RESIDENCES

167, 169 & 171 ISLAND HIGHWAY, VIEW ROYAL, BC Project No: 2021-01

UWA URBAN WEST ARCHITECTURE

Vancouver Office: 102-1688 WEST 1ST AVE VANCOUVER BC V6J 1G1 T 604 603 1332

Victoria Office: 2822 PRIOR STREET VICTORIA BC V8T 3Y3 T 604 603 1332

Revisions

NO. DATE DESCRIPTION
2022 08 12 REISSUED FOR DP
2022 04 04 ISSUED FOR DP
2021 12 03 ISSUED FOR REZONING

LEVEL 5 & ROOF PLANS

Drawing Number: A102


1 LEVEL 5 PLAN

Scale 1:150

Units on Level 5:

  • Unit 501 - Type D1
  • Unit 502 - Type B2
  • Unit 503 - Type B2
  • Unit 504 - Type D1
  • Unit 505 - Type D4
  • Unit 506 - Type C2
  • Unit 507 - Type C3
  • Unit 508 - Type B1
  • Unit 509 - Type C2
  • Unit 510 - Type B5
  • Unit 511 - Type D3

Plan Notes:

  • 82 TOTAL UNITS
  • STAIR #1
  • STAIR #2
  • ALLOWABLE DECK PROJECTION
  • VARIANCE 2: BALCONY PROJECTIONS INTO SETBACK
  • VARIANCE 3: WIDTH OF BALCONY PROJECTIONS INTO SETBACK
  • SETBACK LINE
  • PROPERTY LINE
  • LINE OF BUILDING BELOW
  • LINE OF ROOF ABOVE

2 ROOF PLAN

Scale 1:150

Plan Notes:

  • ROOFTOP ERV - SEE MECH. FOR DETAILS
  • COVERED GARBAGE EXHAUST SHAFT FROM PARKADE
  • RD (Roof Drain)
  • SETBACK LINE
  • PROPERTY LINE
  • LINE OF BUILDING BELOW

General Notes

THIS DRAWING IS THE EXCLUSIVE PROPERTY OF URBAN WEST ARCHITECTURE INC., AND MAY NOT BE REPRODUCED, COPIED OR LOANED WITHOUT WRITTEN PERMISSION FROM URBAN WEST ARCHITECTURE INC. THIS DRAWING MUST NOT BE SCALED. THE GENERAL CONTRACTOR SHALL VERIFY ALL DIMENSIONS, DATUMS, AND LEVELS PRIOR TO COMMENCEMENT OF WORK. ALL ERRORS AND OMISSIONS MUST BE REPORTED IMMEDIATELY TO URBAN WEST ARCHITECTURE INC. THIS DRAWING IS TO BE USED IN CONJUNCTION WITH ALL OTHER DRAWINGS AND SPECIFICATIONS. THESE DRAWINGS ARE NOT VALID FOR CONSTRUCTION UNLESS REVISION DESCRIPTION INDICATES - ISSUED FOR CONSTRUCTION. ALL WORK TO COMPLY WITH MUNICIPAL STANDARDS.

Page 48

Document Images

(1)
Document image
Extracted from: 2022 09 06 Council Agenda - Agenda - Pdf