ELEVATIONS NORTHWEST & NORTHEAST A201

September 6, 2022Page 552 sections

Exterior elevation drawings for the Northwest and Northeast sides of the Portage Park Residences project.

1 CALL TO ORDER
T/O Roof EL. 30.89mScale: 1:150Date: 2022-08-12

PORTAGE PARK RESIDENCES

167, 169 & 171 ISLAND HIGHWAY, VIEW ROYAL, BC Project No: 2021-01

Page 55

ELEVATIONS NORTHWEST & NORTHEAST

Sheet A201

1 NORTHWEST ELEVATION (PARK SIDE)

Scale 1:150

[Drawing: Northwest elevation of a five-story residential building. The drawing shows levels from the parkade entry up to the roof, with various siding materials, windows, and glass balconies callouted to the material legend. Grade lines are shown as "F.G. 14.3 m / E.G. 12.8 m" and "F.G. 14.7 m / E.G. 13.1 m".]

Elevation Markers:

  • 16.09m [EL. 30.89m] T/O ROOF
  • 12.34m [EL. 27.14m] T/O LEVEL 5
  • 9.26m [EL. 24.06m] T/O LEVEL 4
  • 6.17m [EL. 20.97m] T/O LEVEL 3
  • 3.07m [EL. 17.89m] T/O LEVEL 2
  • 0.00m [EL. 14.80m] T/O LEVEL 1
  • [EL. 13.55m] GRADE
  • -4.835m [EL. 9.965m] T/O PARKADE ENTRY
  • -5.800m [EL. 9.000m] T/O PARKADE LOW POINT

Height Dimensions:

  • Building Height: 17.4m
  • Grade to T/O Level 4: 13.6m

2 NORTHEAST ELEVATION (PARK SIDE)

Scale 1:150

[Drawing: Northeast elevation of the residential building, showing a profile of the structure with balconies and rooftop equipment screening. Property lines and setback lines are indicated. Grade lines are shown as "F.G. 14.7 m / E.G. 13.1 m" and "F.G. 14.7 m / E.G. 14.4 m".]

Elevation Markers:

  • 16.09m [EL. 30.89m] T/O ROOF
  • 12.34m [EL. 27.14m] T/O LEVEL 5
  • 9.26m [EL. 24.06m] T/O LEVEL 4
  • 6.17m [EL. 20.97m] T/O LEVEL 3
  • 3.07m [EL. 17.89m] T/O LEVEL 2
  • 0.00m [EL. 14.80m] T/O LEVEL 1
  • [EL. 13.55m] GRADE
  • -4.835m [EL. 9.965m] T/O PARKADE ENTRY
  • -5.800m [EL. 9.000m] T/O PARKADE LOW POINT

MATERIAL LEGEND

ID MATERIAL DESCRIPTION
01 SOFFIT OPTION 1 - CEDAR, COLOUR: NATURAL CEDAR
OPTION 2 - METAL, FINISH: WOOD GRAIN
02a FIBRE CEMENT PANEL PAINTED SMOOTH FIBER CEMENT PANEL W/ EZ TRIM, MANUFACTURER: JAMES HARDIE, COLOUR: WHITE
02b FIBRE CEMENT PANEL PAINTED SMOOTH PANEL W/ EZ TRIM, MANUFACTURER: JAMES HARDIE, COLOUR: CHARCOAL
03 BOARD AND BATTEN PAINTED SMOOTH 7/16" FIBER CEMENT BOARD W/ 1x3 BATTENS, MANUFACTURER: JAMES HARDIE, COLOUR: WHITE
04 BRICK CLADDING CAST RESIN BRICK, MANUFACTURER: STOCAST, COLOUR: MILWAUKEE
05 FEATURE CONCRETE AND RETAINING WALLS SMOOTH ARCHITECTURAL CONCRETE
06 LOBBY WINDOWS STOREFRONT OR ALUMINUM CLAD VINYL, MANUFACTURER: TBD, COLOUR: CHARCOAL
07 RESIDENTIAL WINDOWS VINYL OR ALUMINUM CLAD VINYL, MANUFACTURER: TBD, COLOUR: CHARCOAL
08 GUARDRAILS @ BOARD AND BATTEN ALUMINUM RAILING SYSTEM WITH VERTICAL PICKETS, MANUFACTURER: TBD, COLOUR: WHITE
09 GUARDRAILS @ BRICK & PENTHOUSE GLASS RAILING WITH ALUMINUM FRAMES, MANUFACTURER: TBD, COLOUR: CHARCOAL
10 PRIVACY SCREENS @ PENTHOUSE FROSTED GLASS PRIVACY SCREENS W/ ALUMINUM STRUCTURE, MANUFACTURER: TBD, COLOUR: CHARCOAL
11 METAL FASCIA COLOUR: WHITE
12 ROOFTOP EQUIPMENT SCREENING 6" HORIZONTAL METAL PICKETS WITH 1" SPACING, COLOUR: WHITE

REVISION SCHEDULE

NO. DATE DESCRIPTION
2021 12 03 ISSUED FOR REZONING
2022 04 04 ISSUED FOR DP
2022 07 12 REISSUED FOR DP
2022 08 12 REISSUED FOR DP

ARCHITECT CONTACT INFORMATION

UWA - URBAN WEST ARCHITECTURE

VANCOUVER 102-1688 WEST 1ST AVE VANCOUVER BC V6J 1G1 T 604 603 1332

VICTORIA 2822 PRIOR STREET VICTORIA BC V8T 3Y3 T 604 603 1332

GENERAL NOTES

THIS DRAWING IS THE EXCLUSIVE PROPERTY OF URBAN WEST ARCHITECTURE INC., AND MAY NOT BE REPRODUCED, COPIED OR LOANED WITHOUT WRITTEN PERMISSION FROM URBAN WEST ARCHITECTURE INC. THIS DRAWING MUST NOT BE SCALED. THE GENERAL CONTRACTOR SHALL VERIFY ALL DIMENSIONS, DATUMS, AND LEVELS PRIOR TO COMMENCEMENT OF WORK. ALL ERRORS AND OMISSIONS MUST BE REPORTED IMMEDIATELY TO URBAN WEST ARCHITECTURE INC. THIS DRAWING IS TO BE USED IN CONJUNCTION WITH ALL OTHER DRAWINGS AND SPECIFICATIONS. THESE DRAWINGS ARE NOT VALID FOR CONSTRUCTION UNLESS REVISION DESCRIPTION INDICATES - ISSUED FOR CONSTRUCTION. ALL WORK TO COMPLY WITH MUNICIPAL STANDARDS.