Structural engineering foundation inspection report noting discontinuous rebar.

1 CALL TO ORDER
April 16, 2021Further review required

PROJECT INFORMATION

  • PROJECT ADDRESS: 12 Vickery Road, View Royal, BC
  • PROJECT NO.: 10441
  • DEVELOPER:
  • DATE: 2021.04.16
  • CONTRACTOR:
  • TIME: 03:00pm
Page 70

TYPE OF REVIEW

  • FOOTINGS
  • FOUNDATION WALLS
  • SHEATHING
  • FRAMING
  • OTHER:
Page 70

OBSERVATIONS

  • all walls were poured at time of site visit. Client called for review AFTER pour.
  • poor cold joint from initial pass to second pass
  • in general concrete appears to be satisfactory
  • photos provided to office for rebar Monday April 19, 2021
  • cannot be determined that all rebar is in place per specification. few measurements provided
  • photos reveal that rebar is discontinuous in many places. There are no corner bars in several locations

CONCRETE

Item Reviewed N/A
rebar in correct position [ ] [ ]
rebar right size and spacing [ ] [ ]
hold-down anchorage in place [ ] [ ]
formwork generally as per plan [ ] [ ]

FRAMING

Item Reviewed N/A
conformance with truss spec [ ] [ ]
conformance with I-joist drawings [ ] [ ]
beam and girder bearing [ ] [ ]
continuity of top plates [ ] [ ]
lintels / openings [ ] [ ]
shearwalls / fastening / holddowns [ ] [ ]
continuity of tall walls [ ] [ ]
blocking in floor system for point loads [ ] [ ]
wall sheathing [ ] [ ]
wind girts [ ] [ ]
post to beam free standing [ ] [ ]
fasteners in hardware [ ] [ ]
shearwalls to floor system [ ] [ ]
penetrations [ ] [ ]
LLRS consistent? [ ] [ ]
Page 70

COMMENTS

  • Foundation walls are all poured
Page 70

INSTRUCTIONS

  1. The back portion can be backfilled. The front can be backfilled after the floor system is installed.
  2. Additional work may be required to accommodate shearwall anchorage as rebar is not continuous

update 2021.05.10 after further review, we believe the foundation to be adequate as constructed

Page 70

APPROVAL STATUS

  • APPROVED
  • APPROVED PENDING PHOTOS
  • FURTHER REVIEW REQUIRED

REVIEWED BY: Mark Buesink, P.Eng.