Appendix
Attachment 17 - Foundation Review (buepoint)
March 4, 2025Page 706 sections
Structural engineering foundation inspection report noting discontinuous rebar.
April 16, 2021Further review required
PROJECT INFORMATION
- PROJECT ADDRESS: 12 Vickery Road, View Royal, BC
- PROJECT NO.: 10441
- DEVELOPER:
- DATE: 2021.04.16
- CONTRACTOR:
- TIME: 03:00pm
Page 70
TYPE OF REVIEW
- FOOTINGS
- FOUNDATION WALLS
- SHEATHING
- FRAMING
- OTHER:
Page 70
OBSERVATIONS
- all walls were poured at time of site visit. Client called for review AFTER pour.
- poor cold joint from initial pass to second pass
- in general concrete appears to be satisfactory
- photos provided to office for rebar Monday April 19, 2021
- cannot be determined that all rebar is in place per specification. few measurements provided
- photos reveal that rebar is discontinuous in many places. There are no corner bars in several locations
CONCRETE
| Item | Reviewed | N/A |
|---|---|---|
| rebar in correct position | [ ] | [ ] |
| rebar right size and spacing | [ ] | [ ] |
| hold-down anchorage in place | [ ] | [ ] |
| formwork generally as per plan | [ ] | [ ] |
FRAMING
| Item | Reviewed | N/A |
|---|---|---|
| conformance with truss spec | [ ] | [ ] |
| conformance with I-joist drawings | [ ] | [ ] |
| beam and girder bearing | [ ] | [ ] |
| continuity of top plates | [ ] | [ ] |
| lintels / openings | [ ] | [ ] |
| shearwalls / fastening / holddowns | [ ] | [ ] |
| continuity of tall walls | [ ] | [ ] |
| blocking in floor system for point loads | [ ] | [ ] |
| wall sheathing | [ ] | [ ] |
| wind girts | [ ] | [ ] |
| post to beam free standing | [ ] | [ ] |
| fasteners in hardware | [ ] | [ ] |
| shearwalls to floor system | [ ] | [ ] |
| penetrations | [ ] | [ ] |
| LLRS consistent? | [ ] | [ ] |
Page 70
COMMENTS
- Foundation walls are all poured
Page 70
INSTRUCTIONS
- The back portion can be backfilled. The front can be backfilled after the floor system is installed.
- Additional work may be required to accommodate shearwall anchorage as rebar is not continuous
update 2021.05.10 after further review, we believe the foundation to be adequate as constructed
Page 70
APPROVAL STATUS
- APPROVED
- APPROVED PENDING PHOTOS
- FURTHER REVIEW REQUIRED
REVIEWED BY: Mark Buesink, P.Eng.
Page 70
Extracted from: 2025 03 04 Council Agenda - Agenda - Pdf

