Presentation
WATKISS PARK DESIGN FINALIZATION
June 17, 2025Pages 58–591 section
Site plans and design details for the new Watkiss Park, illustrating phases, seating nodes, and landscaping features.
Watkiss WayGalloping Goose TrailPhase 1 and Phase 2 areasCurved seating nodesHydro SRW
WATKISS PARK DESIGN FINALIZATION

Plan Details:
- Anode bed
- Existing Trees
- Area over and around Anode Bed is open with few modifications
- Pole mounted anode bed kiosk
- WATKISS WAY
- GALLOPING GOOSE TRAIL
- Hydro SRW

Park Design Elements
CURVED SEATING NODES Benches surface mounted on concrete pad

Photos of circular wooden benches mounted on concrete surfaces VIEW ROYAL SYMBOL ON CONCRETE Design in colored concrete

Photo of a colored concrete pattern and a rendering of the View Royal symbol BIRD HOUSES

Photo of a bird house mounted on a wooden post in a park setting NATIVE SHRUBS AND PERENNIALS

Photos of native greenery and flowering shrubs GRAVEL PATHWAY
LAWN AREA Surrounded by plantings
SPLIT RAIL FENCE
Page 58–59
Extracted from: 2025 06 17 Council Agenda - Agenda - Pdf
