This site is in beta — data may be incomplete and features are still being added.
Council Meeting/Documents/SUPPLEMENTAL DRAWING FOR DEVELOPMENT PERMIT 2022/09
Appendix

SUPPLEMENTAL DRAWING FOR DEVELOPMENT PERMIT 2022/09

March 5, 2024Page 661 section

Updated architectural elevation drawing from Hearth Architectural provided as supplemental information for the March 5 meeting.

1 CALL TO ORDER- Acting Mayor, Councillor Mattson, called the meeting to order at 7:01 p.m.
March 4, 2024Drawing A2 - Exterior Character

BURGER KING RENOVATION

1681 Island Highway, View Royal, BC

5.1 MATERIALS FINISH PALETTE

Materials finish palette for paint colors P-1 through P-4 and storefront system GL-1
Materials finish palette for paint colors P-1 through P-4 and storefront system GL-1
Code Material Details
P-1 BURGER KING® Flaming Red Paint Manufacturer: PPG
Color: Custom BURGER KING® Flaming Red
Location: Drive-Thru Red Canopy
Contact: Kevin Lastacy (616) 335-3259 klastacy@ppg.com
P-2 General Paint Manufacturer: PPG
Color: 1021-4 Diversion
Location: Stucco
Contact: Kevin Lastacy (616) 335-3259 klastacy@ppg.com
P-3 Wood Tones Paint Manufacturer: PPG
Color: 1078-6 Cocoa Delight
Location: Site Accents, Stucco
Contact: Kevin Lastacy (616) 335-3259 klastacy@ppg.com
P-4 Silver Band Paint Manufacturer: PPG
Color: 6-230 Leafing Silver Aluminum
Location: Textured coated metal
Contact: Kevin Lastacy (616) 335-3259 klastacy@ppg.com
GL-1 Storefront Manufacturer: GMP Glazing
Color: Anodized Aluminum, Clear Glazing
Location: Entry/Dining
Description: Series 7000 Aluminum Window Wall System
Contact: www.gmpglazing.com
Materials finish palette for textured panels FRC-1, stucco finish CS-1, metal screens MTL-1, red canopy MTL-2, and silver band MTL-3
Materials finish palette for textured panels FRC-1, stucco finish CS-1, metal screens MTL-1, red canopy MTL-2, and silver band MTL-3
Code Material Details
FRC-1 Heritage Wood Textured Panels Manufacturer: Nichiha
Material: Fiber Cement Cladding
Product: Vintage Wood
Color: Faux Cedar
Location: Heritage Tower, Kitchen Enclosure
Contact: Andrew Briggs abriggs@nichiha.com
CS-1 General Stucco Finish Manufacturer: STD or approved equal
Material: Stucco
Color: P-2
Finish: Smooth Finish
Description: Horizontal and vertical reveals to align with adjacent FRC-1 or Storefront
MTL-1 Metal Screens Material: Aluminum extruded metal
Finish: 3M Wood Grain Vinyl
Color: WG-1222
Location: Metal Screens
Contact: Entera Branding 850.763.7982
MTL-2 Drive-Thru Red Canopy Manufacturer: Berridge
Material: Metal flat sheet roofing
Color: P-1
Location: Drive-Thru Red Canopy
Contact: Entera Branding 850.763.7982
MTL-3 Silver Band Material: Light metal framing with PT plywood substrate wrapped in 30# felt and cladded with aluminum panels
Color: P-4
Location: Drive-Thru Red Canopy

Elevations

NORTH ELEVATION

  • Scale: 3/32" = 1'-0"
  • Key Annotations:
    • higher parapet extension
    • raised lower parapet
    • metal canopy
    • retain existing stone
    • replace with conforming dt window

SOUTH ELEVATION

Rendering of the South Elevation featuring "FLAME GRILLING SINCE 1954" text
Rendering of the South Elevation featuring "FLAME GRILLING SINCE 1954" text
* Scale: 3/32" = 1'-0" * **Key Annotations:** * higher parapet extension * raised lower parapet * existing metal roof - paint finish * archons (nichiha) - finish with ef-9G with mc-3g coping * light bands * 22'-0" typical * 24'-0" typical * +/- 33'-9 1/2" existing

WEST ELEVATION

  • Scale: 3/32" = 1'-0"
  • Key Annotations:
    • higher parapet extension

EAST ELEVATION

  • Scale: 3/32" = 1'-0"
  • Key Annotations:
    • raised lower parapet
    • higher parapet extension

Garden Grill Renovation Scheme

Project Information

  • Project: BURGER KING RENOVATION, 1681 Island Highway, View Royal, BC
  • Drawing Title: EXTERIOR CHARACTER
  • Drawing No: A2
  • Project No: 2133
  • Date: aug 2022
  • Scale: AS SHOWN
  • Drawn By: hai
  • Approved By: VJM

Revisions

No. Date Details By
1 oct 31 2022 issued for dp vjm
2 MAR 4 2024 issued for dp vjm

BUILDER'S RESPONSIBILITY TO LAYOUT WORK

It is the Builder's responsibility to lay out & carry out the work as detailed in the contract documents. It is therefore necessary for the builder to pay very close attention to actual site dimensions, geometries and conditions which may vary from those assumed on the drawings.

Any discrepancies which the Builder discovers within the contract documents themselves or between the contract documents & site conditions, are to be discussed with the Architect immediately before proceeding with any work.

Written dimensions shall have precedence over scaled dimensions.

Copyright Reserved

This plan and design are, and at all times remain, the exclusive property of HEARTH architectural Inc. and may not be used or reproduced without written consent.

Page 66

Document Images

(1)
Document image
Extracted from: 2024 03 05 Council Agenda - Agenda - Pdf