Appendix
Draft Zone - CD-29 Comprehensive Development (Attachment 5)
February 6, 2024Pages 174–1753 sections
Draft language for the new site-specific zoning regulations for the townhouse project.
Max Building Height: 12mMin Lot Size: 2300m²
Drain – The proposed post-development flow is 6 L/s for the 10-yr. The downstream storm system is a 300mm PVC storm main @ 2.5% slope, which has a capacity of approximately 51.8 L/s. The proposed development will use 29% of the downstream 300mm PVC during a full-flow event.
Page 174–175
Summary
We trust this meets your requirements for the design brief memo. If you have any questions regarding this memo, please contact the undersigned at your convenience.
Yours truly,
J.E. Anderson and Associates
Colton Killip, EIT
Reviewed by: Ross Tuck, P. Eng Principal
Page 174–175
Appendix A - Sewer Calculations
Page 174–175
Extracted from: 2024 02 06 Council Agenda - Agenda - Pdf