This site is in beta — data may be incomplete and features are still being added.
Council Meeting/Documents/Draft Zone - CD-29 Comprehensive Development (Attachment 5)
Appendix

Draft Zone - CD-29 Comprehensive Development (Attachment 5)

February 6, 2024Pages 174–1753 sections

Draft language for the new site-specific zoning regulations for the townhouse project.

1 CALL TO ORDER- Councillor Rogers, Acting Chair, called the meeting to order at 7:03 p.m.
Max Building Height: 12mMin Lot Size: 2300m²

Drain – The proposed post-development flow is 6 L/s for the 10-yr. The downstream storm system is a 300mm PVC storm main @ 2.5% slope, which has a capacity of approximately 51.8 L/s. The proposed development will use 29% of the downstream 300mm PVC during a full-flow event.

Page 174–175

Summary

We trust this meets your requirements for the design brief memo. If you have any questions regarding this memo, please contact the undersigned at your convenience.

Yours truly,

J.E. Anderson and Associates

Colton Killip, EIT

Reviewed by: Ross Tuck, P. Eng Principal

Page 174–175

Appendix A - Sewer Calculations

Page 174–175
Extracted from: 2024 02 06 Council Agenda - Agenda - Pdf