Detailed technical calculations for the proposed sanitary sewer flow for the 20-unit residential project.

10.a) Bylaw No. 1130 - Rezoning of 294 and 296 Eltham Road and 242 Helmcken Road (Legal Agreements)
20 proposed unitsEstimated sewage flow: 45,569 L/dayPeak flow: 0.53 L/s

Appendix A - Sewer Calculations

PEBBLES – PROPOSED SANITARY FLOW CALCULATIONS

Date: 2023/11/22 Prepared By: CK Project No: 33862

Inputs and Parameters

  • 2.8 CAP/UNIT (CRD ENGINEERING SPECS – MEDIUM DENSITY)
  • 240 L/CAP/DAY (MMCD – ADWF FOR METERED SYSTEM)
  • 20 UNITS PROPOSED
  • SITE AREA = 2470 m² = 0.247 ha
  • i = 0.12 L/s/ha (MMCD – OLD SYSTEM ≥ 25 YRS)

Calculation Formula

QSEWAGE = CAPITA × ADDF × PEAKING FACTOR + I & I

Step-by-Step Calculations

1. Capita (P) CAPITA = 20 UNITS × 2.8 CAP/UNIT = 56 CAP = P

2. Peaking Factor (PF) PF = 3.2 / P0.105 = 3.2 / (1)0.105 = 3.2

3. Inflow and Infiltration (I & I) I & I = 0.247 ha × 0.12 L/s/ha = 0.03 L/s I & I = 2561 L/DAY

4. Total Sewage Flow (QSEWAGE) QSEWAGE = 56 × 240 × 3.2 + 2561 QSEWAGE = 45 569 L/DAY QSEWAGE = 0.53 L/s