This site is in beta — data may be incomplete and features are still being added.
Council Meeting/Documents/SCHEDULE D: GARDEN SUITE REGULATIONS
Appendix

SCHEDULE D: GARDEN SUITE REGULATIONS

June 4, 2024Page 801 section

Regulatory requirements for garden suites, including setbacks and maximum floor area based on lot size.

1 CALL TO ORDER- Mayor Tobias called the meeting to order at 7:00 p.m.
Max floor area: 37 m2 to 65 m2 based on lot sizeMax height: 3.5 m to 4.5 mMinimum 1.5 m side yard setback

SCHEDULE D: GARDEN SUITE REGULATIONS

1. General Regulations

1.1. A garden suite shall only be permitted as an accessory use to a residential, detached building, duplex, or houseplex.

2. Siting, Setback, Separation Distance, and Lot Coverage

2.1. A garden suite must be sited in the rear yard and not less than (minimum):

  • a. 1.5 m from a side yard;
  • b. 1.5 m from a rear yard; and
  • c. 3.5 m from a flanking street of a corner lot.

2.2. The separation distance between a garden suite and all buildings and structures on a lot must be a minimum of 2.4 m.

2.3. The rear yard site coverage must not exceed 25% (maximum), including garden suite, all accessory buildings and structures.

3. Height, Floor Area, and Design

3.1. The height of a garden suite must not exceed (maximum):

  • a. 3.5 metres, where the lot is less than or equal to 549 m²; or
  • b. 4.5 metres, where the lot is greater than or equal to 550 m².

3.2. The floor area of a garden suite must not exceed (maximum):

  • a. 37 m² where the lot size is less than or equal to 549 m²;
  • b. 60 m² where the lot size is greater than or equal to 550 m² and less than or equal to 999m²; or
  • c. 65 m², where the lot is equal to or greater than 1000 m².

3.3. A garden suite is not permitted to include:

  • a. a deck that exceeds 0.6 m above grade;
  • b. a balcony; or
  • c. a rooftop patio.

4. Vehicle Parking

4.1. Off-street parking requirements for motor vehicles in Section 5 of this Bylaw apply.

5. Subdivision

5.1. A garden suite may not be strata-titled or subdivided from the lot containing the principal building.

Page 80
Extracted from: 2024 06 04 Council Agenda - Agenda - Pdf