Presentation
PRESENTATION: Nursery Hill Drive Playground Request Staff Review
May 16, 2023Pages 74–826 sections
Visual presentation detailing the feasibility study and the recommended option of upgrading Chilco Park.
Highlights 'Insufficient flat space' at requested areaChilco Park is only 50m further away than the potential new locationRecommendation: Deny Nursery Hill Drive request
NURSERY HILL DRIVE PLAYGROUND REQUEST
STAFF REVIEW (ACTION ITEM C-14-23)

Page 74–82
BACKGROUND
October 5, 2021 Council Meeting:

January 17, 2023 Council:
- Request for small children play area
- Swings
- Slide
Referred to Staff to outline options


Page 74–82
DISCUSSION
Area Dimensions



Design Guidelines
CSA Z614:20 Children’s Playground Equipment & Surfacing
- Protective Surfacing Zone
- No-Encroachment Zone
Insufficient flat space in requested area

Hazards & Impacts


Page 74–82
FEASIBILITY
Opportunities

Considerations:
- Capital Costs ($$$$)
- Operational Costs ($)
- Staff Time, Workload, Precedence and diminished Level of Service
Page 74–82
RECOMMENDED OPTION
Chilco Park

Considerations:
- In 2023-2027 Budget
- Flat and spacious
- Centralized and Accessible
- Less mobilization needed than pocket parks
Page 74–82
RECOMMENDATION
THAT the request for a small playground on Nursery Hill Drive be denied due to spatial constraints and the fact that playground improvements at Chilco Park are scheduled for 2025
Ivan Leung, P.Eng Director of Engineering & Parks Engineering@viewroyal.ca
Page 74–82
Extracted from: 2023 05 16 Council Agenda - Agenda - Pdf
