This site is in beta — data may be incomplete and features are still being added.
Council Meeting/Documents/ATTACHMENT 1 – COST BREAKDOWN SUMMARY (EV Trucks)
Appendix

ATTACHMENT 1 – COST BREAKDOWN SUMMARY (EV Trucks)

October 1, 2024Page 401 section

A detailed financial breakdown of the estimated costs for the two proposed EV truck purchases, including trade-ins and insurance reimbursements.

8.1.a) Engineering and Parks EV Truck Purchases
Parks Truck Replacement Total: $61,000 (after $26,800 ICBC reimbursement)Engineering Truck Replacement Total: $80,000 (after $9,000 trade-in value)Combined recommended budget: $141,000

ATTACHMENT 1 – COST BREAKDOWN SUMMARY

The cost breakdown and suggested budgeting for both trucks are summarized below. All costs are approximate as the selling price, shipping fees and additional equipment purchased are not yet committed. A 5% contingency is recommended to account for unknown costs above and beyond the assumptions below.

Parks Truck Replacement (not in current budget):

Description Amount
Selling Price (net of GST) $74,950
ICBC Reimbursement -$26,800
Equipment (Truck box liner and rack, rear hitch basket, logos & decaling, safety lighting) $10,000
Subtotal $58,150
Total + Contingency $61,000

Engineering Truck Replacement (current budget $55,000):

Description Amount
Selling Price (net of GST) $74,950
Shipping Fee $2,000
Trade in Value: Nissan Frontier (Approximate) -$9,000
Equipment (Truck box liner and rack, logos & decaling, safety lighting) $8,000
Subtotal $75,950
Total + Contingency $80,000
Page 40