This site is in beta — data may be incomplete and features are still being added.
Council Meeting/Documents/Appendix A - Sewer Calculations
Appendix

Appendix A - Sewer Calculations

October 1, 2024Pages 289–2911 section

Handwritten and typed technical calculations for proposed sanitary sewage flow from 20 units.

10.a) Zoning Bylaw Amendment No. 1130 - Rezoning Application 2023-04 - 294 and 296 Eltham Road and 242 Helmcken Road
2.8 CAP/UNITCalculated Q_SEWAGE = 0.53 L/s

Appendix A - Sewer Calculations

J.E. ANDERSON & ASSOCIATES DATE: 2023/11/22 PROJECT No. 33862 PREPARED BY: CK

PEBBLES – PROPOSED SANITARY FLOW CALCULATIONS

  • 2.8 CAP/UNIT (CRD ENGINEERING SPECS – MEDIUM DENSITY)
  • 240 L/CAP/DAY (MMCD – ADWF FOR METERED SYSTEM)
  • 20 UNITS PROPOSED
  • SITE AREA = 2470 m² = 0.247 ha
  • i = 0.12 L/s/ha (MMCD – OLD SYSTEM ≥ 25 YRS)

Calculations:

QSEWAGE = CAPITA × ADWF × PEAKING FACTOR + I & I

CAPITA = 20 UNITS × 2.8 CAP/UNIT = 56 CAP = P

PEAKING FACTOR = PF = 3.2 / P0.105 = 3.2 / (1)0.105 = 3.2

I & I = 0.247 ha × 0.12 L/s/ha = 0.03 L/s = 2561 L/DAY

QSEWAGE = 56 × 240 × 3.2 + 2561 = 45 569 L/DAY = 0.53 L/s

Page 289–291
Extracted from: 2024 10 01 Council Agenda - Agenda - Pdf