Schedule 'A' - Minimum Arborist Report Requirements
Technical document specifying the necessary information and standards for arborist reports submitted to the Town.
SCHEDULE “A”
MINIMUM ARBORIST REPORT REQUIREMENTS
Arborist Report Information
The purpose of the arborist report is to provide the necessary information to determine suitable trees for preservation, and to prescribe tree protection and mitigation measures, including the definition of specific areas and activities requiring arborist supervision.
The arborist report must: a) Include the following information: (i) Name of arborist and company, address, phone number and email; (ii) Proof of professional liability insurance; (iii) Arborist ISA certification number; (iv) Name and contact information of client; (v) Address of property; and (vi) Date of site visit and date of when report was submitted, with any revisions to the report dated. b) Include all of the following trees: (i) All existing trees on the subject lot that can reasonably be provided by the certified arborist; (ii) All existing trees outside of the subject lot, with protected root zones or tree canopies extending onto the subject lot, or would otherwise require tree protection; and (iii) Replacement trees proposed on the subject lot; c) Include unique, sequential reference IDs for all inventoried trees that correspond to the tree management plan. Onsite trees shall have a physical tag number affixed to the trunk, which will be reference ID. For untagged trees, the following prefixes will be used: offsite (OS-##), and municipal (M-##). d) Include a description of proposed work and, when applicable, proposed development on the lot including all hardscape, landscape, hydrology and grade changes, all proposed frontage work, and all underground and overhead utility services. e) Include recommendations for tree protection and mitigation measures for all project phases, including but not limited to demolition, site excavation, site preload, construction, project and material staging, servicing, landscaping, grading, and other site disturbances. Recommendations must treat all trees as being retained for all phases prior to the issuance of the building permit for construction and tree permit regardless of whether they are planned to be removed. They must include at minimum: (i) Tree protection fencing locations and extents; (ii) Specific activities and areas when arborist supervision is required; (iii) Site access routes; (iv) Material storage areas; (v) Any pruning that may be required to provide clearance; (vi) Post-construction tree care measures; and (vii) Other necessary mitigation measures. f) Include a list of other consulting agency documents that inform the tree assessment, including the version and date of such documents (e.g. lot layout plans, servicing plans, biologist reports, lot grading plans). g) Include a tree inventory table, providing information on each tree identified pursuant to subsection (b), which shall include the following columns; (i) Tree ID; (ii) Species (common and botanical); (iii) Bylaw status (protected, non-protected, municipal) (iv) DBH (cm); (v) Protected Root Zone (“PRZ”, measured in m radius from trunk); (vi) Canopy spread (diameter and m from trunk); (vii) Structural condition (poor, fair, good); (viii) Health condition (poor, fair, good); (ix) Retention suitability (suitable, unsuitable); (x) Species tolerance to disturbance (poor, moderate, good); (xi) Recommendation to remove or retain, or if the retention status is “to be determined”; (xii) Specific reason for removal or “to be determined”, if applicable; and (xiii) Comments (including prune or cut), and location. h) Include site photos that: (i) Capture the context of inventoried trees on the site; (ii) Capture individual trees when there are specific considerations or conditions of concern for that tree that are addressed in the arborist report; (iii) Are labelled as numbered figures with captions describing any numbered tree tags, direction of photo, and description of what is pictured; and (iv) Are marked up with tree tag numbers for each tree if multiple trees are shown. i) Include a construction impact assessment, complete with a summary table, outlining the retention, removal and “to be determined” onsite trees, offsite trees and municipal trees; j) Include a tree replacement summary table counting replacement trees required, and calculating cash-in-lieu amounts; k) Include the signature of the arborist; l) Either: (i) Be dated within one year of the tree permit application date; or (ii) Have a covering letter from the original author stating that they have visited the site and the conditions and recommendations contained in the original report remain valid. m) Identify any revisions or amendments necessary and approved by the Town into the original report with all changes identified;
Where the original arborist report submitted to the City is incomplete or inaccurate, the Director may retain the services of an independent arborist or other professional to review an arborist report, to be paid by the Applicant and prior to issuance of the tree permit.