Council Meeting/Documents/Landscaping Plan by Andrew van Egmond
Appendix

Landscaping Plan by Andrew van Egmond

July 4, 2023Pages 30–312 sections

Detailed landscape design schematics, including a development permit schematic and a tree/planting plan for 2820 Shoreline Drive.

1 CALL TO ORDER- Mayor Tobias called the meeting to order at 7:00 p.m.
2820 Shoreline DriveAndrew van Egmond Designing Garden & LandscapePlan dates: October 14, 2022 and November 30, 2022Includes 15 meter setback and ecological restoration zones

GENERAL PROJECT NOTES

Design objectives

  • Reduce footprint of hard surfaces in the DPA.
    • Smaller back patio (existing = 77m2, proposed = 48m2)
    • Floating boardwalk / staircase down to deck
    • Small reduction surface deck (existing = 34m2, proposed = 31m2)
    • Taking out all non-permeable asphalt in front yard and install driveway existing of water permeable grass-turf pavement.
  • Besides the concrete patio all surfaces are water permeable.
  • New retaining element will be Gabion-retaining walls resulting in a more ecological friendlier solution. Ecological friendly because of the cavities between the rock. The spaces between the rock serve as shelter for little animals, insects and plants.
  • All new elements to be constructed of non-toxic materials.
  • Clean up all rock surfaces. Taking out all exotic and non-native plants. Leaving only mosses, native ferns, grasses other native plants.
  • Eliminate all invasive plants in trees and along shoreline. English Ivy is the biggest problem on this property.
  • Introducing an assortment of native perennials and shrubs following the plant collection advised by Swell Environmental Consulting Ltd. Resulting in landscaping that connects to the local ecosystem.

2820 Shoreline Drive | View Royal | October 14, 2022

LEGEND

Existing Surfaces and structures (Red circle) High tide line (Blue line) 15 meter setback (Yellow line) Ecological restoration zone. Following report by Swell Environmental Consulting Ltd. (Dotted pattern)

  1. Existing floating dock
  2. Floating deck - concrete Sono tube footing - concrete tiles on wood framing
  3. Staircase - concrete footing - concrete tiles - coated steel railing
  4. Concrete patio - smooth concrete surface with bush hammered areas
  5. Outdoor BBQ element - smooth concrete top and bush hammered base
  6. New Gabion retraining wall - 1.2m high (4 feet) - Galvanised steel mesh filled with local sourced rock
  7. Planters for cutting flowers
  8. Simple Cedar wooden staircase - Simple design in collaboration with green contractor
  9. Driveway - Concrete Turf Paver - water permeable surface
  10. Prefab concrete Roman-Step elements. - 12” x 6” x 12’
  11. Pea gravel surface - water permeable surface
  12. Existing rock bed, natural surface | Clean up - leave mosses and small grasses and native plants
  13. Border of perennial grasses, slim perennials and bulb
  14. Existing trees to be pruned under supervision of landscape designer
  15. Big ceramic planters with perennial grasses, slim perennials and bulb
  16. New Shore Pine (Pinus contorta)
  17. New Native Douglas Fir - Pseudotsuga menziesii - 6m
  18. Green carpet + smaller and middle size deciduous shrubs | Ecological restoration zone. Following the plant collection advised by Swell Environmental Consulting Ltd.
  19. Green carpet + smaller and middle size deciduous shrubs. Following the plant collection advised by Swell Environmental Consulting Ltd.
  20. Existing evergreen shrubs
  21. New bigger evergreen shrubs and deciduous native shrubs
  22. New Gabion retraining wall - ranging from 30 cm to 1.2 m high (4 feet). Galvanised steel mesh filled with local sourced rock

Page 30–31

GENERAL PROJECT NOTES

  1. The contractor shall notify Underground Services Alert at least 48 hours prior to any excavation on this project.
  2. The contractor shall be responsible for the verification of all existing utilities in the field and for familiarizing himself/herself with all existing underground conditions prior to construction. Locations shown on the plans are approximate and for general information only.
  3. Contractor is responsible for repairing and replacing at his/her expense any structures, fences, walls or plant life damaged or destroyed by his/her construction operations, on adjacent properties and/or anywhere outside the contract limit lines. Damaged items will be restored to original condition and to the satisfaction of the engineer.
  4. All dimensions, elevations and existing conditions shall be checked and verified on the project site by the contractor and each trade before work begins. Errors and omissions and discrepancies shall be brought to the architect’s attention before construction begins or immediately as identified.
  5. Provide all labor, materials, equipment, tools, transportation, utilities and other services and related tasks necessary for the construction as required by the contract documents.
  6. Contractor shall assume sole responsibility for job site conditions and comply with safety regulations and restrictions as required for workers and pedestrians protection during the course of construction of this project.
  7. All work shall be performed in conformance with all local, Provincial, and National codes, laws, ordinances, and regulations applicable. Nothing in the contract documents is to be construed to permit work not conforming to these codes, laws, ordinances, and regulations.
  8. All new hardscape surfaces shall maintain a minimum 1.5% cross slope away from structures and walls as shown on Plan. All softscape surfaces shall maintain 2% slope away from structures and walls. Contractor shall ensure positive drainage throughout project area.
  9. Contractor shall advise on installation of drainage features such as drain inlets, drain lines, and French drains if necessary to ensure positive drainage throughout project area. Refer to Grading + Drainage Plans by Civil Engineer.
  10. Contractor is responsible to provide layout of all work for approval by Landscape Designer prior to proceeding with work.
  11. Contractor to come up with an irrigation plan in collaboration with Landscape Designer. Final proposal to be approved by landscape designer.
  12. Do not scale from this drawing.
  13. In case of discrepancies in the drawing, contact the designer.

2820 Shoreline Drive | View Royal | November 30, 2022

Tree Plan - Planting Plan Legend

Existing trees (Solid black circle) New trees (Open circle with center dot) Larger deciduous shrubs with different foliage and blossom (Hatched circle) Smaller deciduous shrubs with different foliage and blossom (Dotted circle) Climbing plants (Linked small circles)

Perennial, bulbs and perennial grasses border

  • Gr Desch
  • Gr Call
  • Gr Ses
  • H Sal p
  • H Ros cult

Solo ornamental grasses

  • Molinia arundinacea 'Skyracer'

Solo ferns

  • Polystichum munitum

Bulbs

  • Eremerus robustus
  • Triteleia hyacinthina
  • Allium cernuum
  • Allium sphaerocephalon
  • Allium siculum

Solo Perennials

  • Achillea millefolium
  • Sanguisorba officinalis
  • Maianthemum stellatum
  • Geranium Orion or Patense
  • Aquilegia vulgaris
  • Veronicastrum virginicum ‘Lavendelturn’
  • Verbena bonariensis

Perennials matrixes and groups

(See planting list)

  • Matrix 1: Gr Agr, Gr Carex, Gr Desch (various percentage mixes)
  • Matrix 2: P Frag c (70%), P Frag v (30%)
  • Matrix 3: P Corn (30%), P Maia (20%), P Oxal (40%), P Tril (10%)
  • P Achlys

Staff Recommendations Verbatim:

  • Approximate area to be rehabilitated and planted with native plants per the environmental consultant recommendation. (Appears multiple times on site plan).
Page 30–31
Extracted from: 2023 07 04 Council Agenda - Agenda - Pdf