Architectural site plan drawing for the 2820 Shoreline Drive property showing layout, floor levels, and retaining wall positions.

1 CALL TO ORDER- Mayor Tobias called the meeting to order at 7:00 p.m.
2820 Shoreline DriveDecember 8, 2022Scale 1:100

L 1.0 Site Plan

Andrew van Egmond Designing Garden & Landscape www.andrewvanegmond.com 06-121 68 505

Final Design | 2820 Shoreline Drive | View Royal | December 8, 2022


Page 33

GENERAL PROJECT NOTES

  1. The contractor shall notify Underground Services Alert at least 48 hours prior to any excavation on this project.
  2. The contractor shall be responsible for the verification of all existing utilities in the field and for familiarizing himself/herself with all existing underground conditions prior to construction. Locations shown on the plans are approximate and for general information only.
  3. Contractor is responsible for repairing and replacing at his/her expense any structures, fences, walls or plant life damaged or destroyed by his/her construction operations, on adjacent properties and/or anywhere outside the contract limit lines. Damaged items will be restored to original condition and to the satisfaction of the engineer.
  4. All dimensions, elevations and existing conditions shall be checked and verified on the project site by the contractor and each trade before work begins. Errors and omissions and discrepancies shall be brought to the architect's attention before construction begins or immediately as identified.
  5. Provide all labor, materials, equipment, tools, transportation, utilities and other services and related tasks necessary for the construction as required by the contract documents.
  6. Contractor shall assume sole responsibility for job site conditions and comply with safety regulations and restrictions as required for workers and pedestrians protection during the course of construction of this project.
  7. All work shall be performed in conformance with all local, Provincial, and National codes, laws, ordinances, and regulations applicable. Nothing in the contract documents is to be construed to permit work not conforming to these codes, laws, ordinances, and regulations.
  8. All new hardscape surfaces shall maintain a minimum 1.5% cross slope away from structures and walls as shown on Plan. All softscape surfaces shall maintain 2% slope away from structures and walls. Contractor shall ensure positive drainage throughout project area.
  9. Contractor shall advise on installation of drainage features such as drain inlets, drain lines, and French drains if necessary to ensure positive drainage throughout the project area. Refer to Grading + Drainage Plans by Civil Engineer.
  10. Contractor is responsible to provide layout of all work for approval by Landscape Designer prior to proceeding with work.
  11. Contractor to come up with an irrigation plan in collaboration with Landscape Designer. Final proposal to be approved by landscape designer.
  12. Do not scale from this drawing.
  13. In case of discrepancies in the drawing, contact the designer.

Page 33

DRAWING INDEX

  • L 1.0 Site Plan
  • L 1.1 Material Specification
  • L 2.0 - 4 Details
  • L 3.0 Lighting Plan + Lighting Specifications
  • L 5.0 Tree Plan - Planting Plan
  • L 5.1 Planting Plan - list - Ref-images
  • L 6.1 Development Permit Schematic

Page 33

LEGEND

  1. Existing dock
  2. New concrete tiles on existing concrete foundation | See material specs
  3. Outdoor fire place: Concrete tiles on wood framing | See Material Specs | See Detail
  4. Floating deck - concrete footing - wood framing - concrete tiles | See Material Specs | See Detail
  5. Staircase - concrete footing - concrete tiles - coated steel railing | See Material Specs | See Detail
  6. Concrete patio - smooth concrete with bush hammered areas | See Material Specs | See Detail
  7. Outdoor kitchen - smooth concrete top and bush hammered base | See Material Specs | See Detail
  8. Flag post - powder coated angel iron | See Material Specs | See Detail
  9. Existing concrete surface
  10. New Gabion retraining wall - 1.2m high (4 feet) + 60cm under grade - Galvanised steel mesh filled with local sourced rock | See Material Specs | See Detail
  11. Planters to be supplied by client. Irrigation in planters in collaboration with client and green contractor | Tap-point at end of every bed
  12. Simple wooden staircase - Simple design in collaboration with green contractor
  13. Landing entrance dwelling by architect
  14. Driveway - Concrete Turf Paver | See Material Specs
  15. Prefab concrete Roman Step. - 12” x 6” x 12’ | See Material Specs | See Detail
  16. Prefab concrete Lintel. - 6” x 3” x 72” | See Material Specs
  17. Prefab concrete Roman Step. - 16” x 6” x 8’ | See Material Specs | See Detail
  18. Pea gravel | See Material Specs
  19. Existing rock bed | Clean up - leave mosses and small native plants
  20. Border of perennial grasses, slim perennials and bulb | See planting plan L 5.0
  21. Existing trees to be pruned under supervision of landscape designer
  22. Big planters with perennial grasses, slim perennials and bulb | See planting plan L 5.0 Planters to be sourced by client
  23. New Shore Pine | To be sourced by landscape designer and client | See planting plan L 5.0 Irrigation in collaboration with green contractor | dripline?
  24. New Picea omorika “Berliner Weeper” - 6m | To be sourced by landscape designer and client | See planting plan L 5.0 | Irrigation in collaboration with green contractor | dripline?
  25. Green carpet | Ecological restoration zone | Selection of ground-covers, ferns and small shrubs | See planting plan L 5.0 | Irrigation in collaboration with green contractor | ritme of small pop-up sprinklers
  26. Green carpet | Selection of ground-covers, ferns and small shrubs | See planting plan L 5.0 | Irrigation in collaboration with green contractor | ritme of small pop-up sprinklers
  27. New bigger deciduous shrubs | To be sourced by landscape designer and client | See planting plan L 5.0 | Irrigation in collaboration with green contractor | dripline?
  28. Existing evergreen shrubs
  29. New bigger evergreen shrubs and dicidious native shrubs | To be sourced by landscape designer and client | See planting plan L 5.0 | Irrigation in collaboration with green contractor | dripline?
  30. New Gabion retaining wall - ranging from 30cm to 1.2 m high (4 feet) | Galvanised steel mesh filled with local sourced rock
  31. Address marker | See Detail | Reuse old nature stone steps back yard. Standing with sandblasted address number

OPTION:

  • Reuse old nature stone steps back yard. Ritme of elements on edge, 4” spacing, overgrown by mosses. At same level as top of long concrete element next to it.