This site is in beta — data may be incomplete and features are still being added.
Council Meeting/Documents/L 2.1 - Details A1-A2
Appendix

L 2.1 - Details A1-A2

July 4, 2023Page 352 sections

Detailed cross-sections and site plan views (Scale 1:50 to 1:10) for garden staircase and outdoor kitchen features.

1 CALL TO ORDER- Mayor Tobias called the meeting to order at 7:00 p.m.
Olympic Paver Collection18” frost depth footing2820 Shoreline Drive

GENERAL PROJECT NOTES

  1. The contractor shall notify Underground Services Alert at least 48 hours prior to any excavation on this project.
  2. The contractor shall be responsible for the verification of all existing utilities in the field and for familiarizing himself/herself with all existing underground conditions prior to construction. Locations shown on the plans are approximate and for general information only.
  3. Contractor is responsible for repairing and replacing at his/her expense any structures, fences, walls or plant life damaged or destroyed by his/her construction operations, on adjacent properties and/or anywhere outside the contract limit lines. Damaged items will be restored to original condition and to the satisfaction of the engineer.
  4. All dimensions, elevations and existing conditions shall be checked and verified on the project site by the contractor and each trade before work begins. Errors and omissions and discrepancies shall be brought to the architect’s attention before construction begins or immediately as identified.
  5. Provide all labor, materials, equipment, tools, transportation, utilities and other services and related tasks necessary for the construction as required by the contract documents.
  6. Contractor shall assume sole responsibility for job site conditions and comply with safety regulations and restrictions as required for workers and pedestrians protection during the course of construction of this project.
  7. All work shall be performed in conformance with all local, Provincial, and National codes, laws, ordinances, and regulations applicable. Nothing in the contract documents is to be construed to permit work not conforming to these codes, laws, ordinances, and regulations.
  8. All new hardscape surfaces shall maintain a minimum 1.5% cross slope away from structures and walls as shown on Plan. All softscape surfaces shall maintain 2% slope away from structures and walls. Contractor shall ensure positive drainage throughout project area.
  9. Contractor shall advise on installation of drainage features such as drain inlets, drain lines, and French drains if necessary to ensure positive drainage throughout project area. Refer to Grading + Drainage Plans by Civil Engineer.
  10. Contractor is responsible to provide layout of all work for approval by Landscape Designer prior to proceeding with work.
  11. Contractor to come up with an irrigation plan in collaboration with Landscape Designer. Final proposal to be approved by landscape designer.
  12. Do not scale from this drawing
  13. In case of discrepancies in the drawing, contact the designer
Page 35

DRAWING INDEX

  • L 1.0 Site Plan
  • L 1.1 Material Specification
  • L 2.0 - 4 Details
  • L 3.0 Lighting Plan + Lighting Specifications
  • L 5.0 Tree Plan - Planting Plan
  • L 5.1 Planting Plan - list - Ref-images
  • L 6.1 Development Permit Schematic

Site plan | Scale 1:50

Site Plan Annotations:

  • Staircase of prefab tiles | Olympic Paver Collection | See material specs
  • Overhang concrete patio over staircase
  • Concrete patio | Smooth finish
  • 2” gab
  • Pea gravel 1/4”
  • Outdoor kitchen | See detail A3 and A4
  • Concrete patio | Smooth finish
  • Bush hammered finish top and sided | Provide mock-up samples
  • 2” gab
  • Ornamental grass and perennial border
  • Floor level 6.19m
  • Align with outside siding

Detail A1 | Scale 1:50

Detail A1 Annotations:

  • Concrete patio
  • Powder coated aluminum railing 2”x1”
  • Olympic Paver Collection | See material specs
  • Concrete treads

Detail A1 | Scale 1:20

Dimensions and Annotations:

  • 31'-10 11/16" (Total width)
  • 7'-6 1/16"
  • 12'-4 1/8" | Align with outside walls
  • 11'-10"
  • 3'-7"
  • 2'-3 1/2"
  • Check overhang and drip edge
  • Outdoor kitchen in background
  • Edge of concrete patio | Sharp and sanded
  • 2” gab
  • Slim edge overhang
  • Footing | 18” frost depth
  • Concrete patio | Smooth finish
  • Bush hammered finish top and sided | Provide mock-up samples

Detail A1 | Scale 1:10

Detail A1 (1:10) Annotations:

  • Sanderson Roman Concrete Steps | 16”x6”x8’ | Lightly sandblasted
  • Concrete footing
  • Edge of concrete patio | Sharp and sanded
  • Footing | 18” frost depth

Detail A2 | Scale 1:20

Detail A2 Annotations:

  • 16'-4" | Align with outside walls
  • Footing | 18” frost depth

Project Information: Final Design | 2820 Shoreline Drive | View Royal | December 8, 2022

Andrew van Egmond Designing Garden & Landscape www.andrewvanegmond.com 06-121 68 505

Sheet Number: L 2.1 - Details A1-A2

Page 35
Extracted from: 2023 07 04 Council Agenda - Agenda - Pdf