Detailed construction drawings for the BBQ unit, concrete base recesses, and aluminum railings.

1 CALL TO ORDER- Mayor Tobias called the meeting to order at 7:00 p.m.
Napoleon PRESTIGE PRO 665 BBQ typeConduit for gasline D=4”Powder coated aluminum railing 2”x1”

GENERAL PROJECT NOTES

  1. The contractor shall notify Underground Services Alert at least 48 hours prior to any excavation on this project.
  2. The contractor shall be responsible for the verification of all existing utilities in the field and for familiarizing himself/herself with all existing underground conditions prior to construction. Locations shown on the plans are approximate and for general information only.
  3. Contractor is responsible for repairing and replacing at his/her expense any structures, fences, walls or plant life damaged or destroyed by his/her construction operations, on adjacent properties and/or anywhere outside the contract limit lines. Damaged items will be restored to original condition and to the satisfaction of the engineer.
  4. All dimensions, elevations and existing conditions shall be checked and verified on the project site by the contractor and each trade before work begins. Errors and omissions and discrepancies shall be brought to the architect’s attention before construction begins or immediately as identified.
  5. Provide all labor, materials, equipment, tools, transportation, utilities and other services and related tasks necessary for the construction as required by the contract documents.
  6. Contractor shall assume sole responsibility for job site conditions and comply with safety regulations and restrictions as required for workers and pedestrians protection during the course of construction of this project.
  7. All work shall be performed in conformance with all local, Provincial, and National codes, laws, ordinances, and regulations applicable. Nothing in the contract documents is to be construed to permit work not conforming to these codes, laws, ordinances, and regulations.
  8. All new hardscape surfaces shall maintain a minimum 1.5% cross slope away from structures and walls as shown on Plan. All softscape surfaces shall maintain 2% slope away from structures and walls. Contractor shall ensure positive drainage throughout project area.
  9. Contractor shall advise on installation of drainage features such as drain inlets, drain lines, and French drains if necessary to ensure positive drainage throughout project area. Refer to Grading + Drainage Plans by Civil Engineer.
  10. Contractor is responsible to provide layout of all work for approval by Landscape Designer prior to proceeding with work.
  11. Contractor to come up with an irrigation plan in collaboration with Landscape Designer. Final proposal to be approved by landscape designer.
  12. Do not scale from this drawing
  13. In case of discrepancies in the drawing, contact the designer
Page 36

DRAWING INDEX

  • L 1.0 Site Plan
  • L 1.1 Material Specification
  • L 2.0 - 4 Details
  • L 3.0 Lighting Plan + Lighting Specifications
  • L 5.0 Tree Plan - Planting Plan
  • L 5.1 Planting Plan - list - Ref-images
  • L 6.1 Development Permit Schematic
Page 36

Technical Drawings and Details

Detail A3 & A5 | Scale 1:50

  • Recess in concrete base. 2” gab / setback
  • Contour bush hammered concrete base
  • Conduit for gasline D=4”
  • BBQ type: Napoleon PRESTIGE PRO 665
  • Conduit for electric D=3”
  • Electrical opening for motion censor D=2”
  • Smooth and polished finish top and sides. Need to be sealed for cooking purposes
  • Bush hammered finish base | Provide mock-up samples
  • 2” gab resess
  • BBQ type: Napoleon PRESTIGE PRO 665
  • Opening dimensions: W: 38” (965mm) x D: 20 5/8” (524mm) x H: 8 7/8” (225mm)
  • Smooth and polished finish top and sides. | Need to be sealed for cooking purposes
  • Edge of concrete patio | Sharp and sanded
  • Resess / storage. Smooth finisch
  • Footing and Rebar engineering by contractor and enghineer

Detail B1 | Scale 1:50

  • Olympic Paver Collection | See material specs
  • Concrete treads
  • Powder coated aluminum railing 2”x1”
  • Edge of treads follows edge of new deck

Detail B1 | Scale 1:20

  • Powder coated aluminum railing 2”x1”
  • Runner = multitude of 1 feet
  • Final lingth to deteremine in the field as it needs to follow the natural grade of the bedrock
  • Olympic Paver Collection | See material specs
  • Concrete treads
  • Edge of treads follows edge of new deck

Detail B2 | Scale 1:10

  • Olympic Paver Collection | See material specs
  • Concrete treads
  • Powder coated aluminum railing 2”x1”
  • Powder coated aluminum railing
  • Mounting still to determine
  • Spacing between tiles 1/4”
  • Runner = multitude of 1 feet
  • Railing post to drill in bedrock. Fasten with expansion grout
  • Tile overhang is 2.5” | fasten with stone glu or grout
Page 36

Project Information

Andrew van Egmond Designing Garden & Landscape www.andrewvanegmond.com 06-121 68 505

Final Design | 2820 Shoreline Drive | View Royal | December 8, 2022 L 2.2 - Details A3-A5 & B1 - B3

Page 36
Extracted from: 2023 07 04 Council Agenda - Agenda - Pdf