Appendix
L 2.3 - Details C & C1-2
July 4, 2023Page 374 sections
Architectural details for the boardwalk, fireplace, and cedar framing elements of the development project.
SonoTube FootingCedar lumber framing2820 Shoreline Drive
GENERAL PROJECT NOTES
- The contractor shall notify Underground Services Alert at least 48 hours prior to any excavation on this project.
- The contractor shall be responsible for the verification of all existing utilities in the field and for familiarizing himself/herself with all existing underground conditions prior to construction. Locations shown on the plans are approximate and for general information only.
- Contractor is responsible for repairing and replacing at his/her expense any structures, fences, walls or plant life damaged or destroyed by his/her construction operations, on adjacent properties and/or anywhere outside the contract limit lines. Damaged items will be restored to original condition and to the satisfaction of the engineer.
- All dimensions, elevations and existing conditions shall be checked and verified on the project site by the contractor and each trade before work begins. Errors and omissions and discrepancies shall be brought to the architect’s attention before construction begins or immediately as identified.
- Provide all labor, materials, equipment, tools, transportation, utilities and other services and related tasks necessary for the construction as required by the contract documents.
- Contractor shall assume sole responsibility for job site conditions and comply with safety regulations and restrictions as required for workers and pedestrians protection during the course of construction of this project.
- All work shall be performed in conformance with all local, Provincial, and National codes, laws, ordinances, and regulations applicable. Nothing in the contract documents is to be construed to permit work not conforming to these codes, laws, ordinances, and regulations.
- All new hardscape surfaces shall maintain a minimum 1.5% cross slope away from structures and walls as shown on Plan. All softscape surfaces shall maintain 2% slope away from structures and walls. Contractor shall ensure positive drainage throughout project area.
- Contractor shall advise on installation of drainage features such as drain inlets, drain lines, and French drains if necessary to ensure positive drainage throughout project area. Refer to Grading + Drainage Plans by Civil Engineer.
- Contractor is responsible to provide layout of all work for approval by Landscape Designer prior to proceeding with work.
- Contractor to come up with an irrigation plan in collaboration with Landscape Designer. Final proposal to be approved by landscape designer.
- Do not scale from this drawing
- In case of discrepancies in the drawing, contact the designer
Page 37
DRAWING INDEX
- L 1.0 Site Plan
- L 1.1 Material Specification
- L 2.0 - 4 Details
- L 3.0 Lighting Plan + Lighting Specifications
- L 5.0 Tree Plan - Planting Plan
- L 5.1 Planting Plan - list - Ref-images
- L 6.1 Development Permit Schematic
Page 37
PROJECT INFORMATION
Andrew van Egmond Designing Garden & Landscape www.andrewvanegmond.com 06-121 68 505
Final Design | 2820 Shoreline Drive | View Royal | December 8, 2022 L 2.3 - Details C & C1-2
Page 37
TECHNICAL DRAWINGS AND SPECIFICATIONS
Site plan | Scale 1:50
- Boardwalk to dock.
- Existing concrete foundation
- Olympic Paver Collection | See material specs (On existing concrete foundation)
- Gas fire place. Build in Olympic pavers, on wood frame. Position of element to determine on site.
- Patio of Olympic tiles | See material specs
- Staircase of prefab tiles | Olympic Paver Collection | See material specs
- Δ C1
- Δ C2
Detail C1 | Scale 1:10 / Scale 1:20
- Olympic Paver Collection | See material specs
- Thin rubber strip or silicone caulking between wooden frame and concrete tiles.
- Miter sawn wood framing
- 4”x2” Ceder
- 6”x3” Ceder
- In built gas fire place unit. See material specs
- Fire Place. Powder coated pan and grill. 2’x4’x2,5” - 3/8” thick steel
- Powder coated angle iron. 2”x2” x 3/8” thick
- SonoTube Footing - Consult Engineer for size
- Dimensions: 2'-0", 1'-8", 5 5/8", 8"
- Utility: Electrical
Detail C2 | Scale 1:20
- Miter sawn corners
- 4”x2” Ceder
- 6”x3” Ceder
- Olympic Paver Collection | See material specs
- Fire Place. Powder coated pan and grill. 2’x4’x2,5” - 3/8” thick steel
- Thin rubber strip or silicone caulking between wooden frame and concrete tiles.
- Powder coated angle iron 2"x2" x 3/8" thick
- Olympic Paver Collection | See material specs
- Powder coated angle iron 2"x2" x 3/8" thick
- 3"x5" Ceder / 6"x3" Ceder
- Utility: Electrical
Detail C | Scale 1:20
- 3”x6” Ceder | Check with engineer
- 6”x3” Ceder | Check with engineer
- 5”x3” Ceder
- Olympic Paver Collection | See material specs
- Powder coated angle iron. 2”x2” x 3/8” thick
- SonoTube Footing - Consult Engineer for size
- Gas fire place. Build in Olympic pavers, on wood frame. Position of element to determine on site.
- In built gas fire place unit. See material specs
- 2”x4” Ceder lumber framing. Miter sawn wood corners
- 2”x4” Ceder lumber framing.
- Fire Place. Powder coated pan and grill. 2’x4’x2,5” - 3/8” thick steel
- Olympic Paver Collection 2'x3' | See material specs
- Olympic Paver Collection 1'x4' | See material specs
- Olympic Paver Collection 2'x4' | See material specs
- Dimensions: 24' 3", 10', 3'-0", 2', 1", 2"
- Utility: Electrical | GAS
- Note: consult engineer - minimal 2'
Page 37
Extracted from: 2023 07 04 Council Agenda - Agenda - Pdf