L 13.1 Lighting Plan

July 4, 2023Page 395 sections

Electrical and lighting layout plan for the property showing locations for spotlights, lanterns, and transformers.

1 CALL TO ORDER- Mayor Tobias called the meeting to order at 7:00 p.m.
In-Lite SMART HUB-150 transformerFLOS Ipnos lantern12 volt In-Lite System

L 13.1 Lighting Plan

Page 39

GENERAL PROJECT NOTES

  1. The contractor shall notify Underground Services Alert at least 48 hours prior to any excavation on this project.
  2. The contractor shall be responsible for the verification of all existing utilities in the field and for familiarizing himself/herself with all existing underground conditions prior to construction. Locations shown on the plans are approximate and for general information only.
  3. Contractor is responsible for repairing and replacing at his/her expense any structures, fences, walls or plant life damaged or destroyed by his/her construction operations, on adjacent properties and/or anywhere outside the contract limit lines. Damaged items will be restored to original condition and to the satisfaction of the engineer.
  4. All dimensions, elevations and existing conditions shall be checked and verified on the project site by the contractor and each trade before work begins. Errors and omissions and discrepancies shall be brought to the architect’s attention before construction begins or immediately as identified.
  5. Provide all labor, materials, equipment, tools, transportation, utilities and other services and related tasks necessary for the construction as required by the contract documents.
  6. Contractor shall assume sole responsibility for job site conditions and comply with safety regulations and restrictions as required for workers and pedestrians protection during the course of construction of this project.
  7. All work shall be performed in conformance with all local, Provincial, and National codes, laws, ordinances, and regulations applicable. Nothing in the contract documents is to be construed to permit work not conforming to these codes, laws, ordinances, and regulations.
  8. All new hardscape surfaces shall maintain a minimum 1.5% cross slope away from structures and walls as shown on Plan. All softscape surfaces shall maintain 2% slope away from structures and walls. Contractor shall ensure positive drainage throughout project area.
  9. Contractor shall advise on installation of drainage features such as drain inlets, drain lines, and French drains if necessary to ensure positive drainage throughout the project area. Refer to Grading + Drainage Plans by Civil Engineer.
  10. Contractor is responsible to provide layout of all work for approval by Landscape Designer prior to proceeding with work.
  11. Contractor to come up with an irrigation plan in collaboration with Landscape Designer. Final proposal to be approved by landscape designer.
  12. Do not scale from this drawing.
  13. In case of discrepancies in the drawing, contact the designer.
Page 39

EXTERIOR LIGHTING NOTES

  1. Lights to be controlled with switches (S.A.D.).
  2. Light source shall not be visible from off-site premises.
  3. The lighting plan is diagrammatic and intended to show general fixture location and type. Exact location of fixtures and transformers shall be verified on site with landscape architect.
  4. Contractor shall coordinate with general contractor and electrical contractor for installation of conduit, sleeving, switching locations and junction boxes during other phases of work.
  5. All fixtures to be installed per manufacturer’s specifications.
  6. All “flush” fixtures to be installed level with top of paving material, gravel or plant bed mulch, unless otherwise noted.
Page 39

DRAWING INDEX

  • L 1.0 Site Plan
  • L 1.1 Material Specification
  • L 2.0 - 4 Details
  • L 3.0 Lighting Plan + Lighting Specifications
  • L 5.0 Tree Plan - Planting Plan
  • L 5.1 Planting Plan - list - Ref-images
  • L 6.1 Development Permit Schematic
Page 39

FIXTURE SPECIFICATIONS AND INSTALLATION

TO BE INSTALLED BY LANDSCAPE CONTRACTOR

Circuits:

  • [Yellow Line] Circuit 1
  • [Green Line] Circuit 2
  • [Purple Line] Circuit 3
  • [Blue Line] Circuit 4

TRANSFORMER SPECIFICATIONS

  • Transformer to use for this situation: In-Lite SMART HUB-150
  • The SMART HUB-150 is operated using the in-lite app. You can connect up to 150VA in fixtures to the transformer, divided over three cable outlets if desired, each of which can be operated separately.
  • For more information about the In-Lite lighting systems see: https://in-lite.com/ca-en/the-12v-in-lite-system
  • Closest dealer is: Big Star Lights 17700 River Road V6V 1L9 RICHMOND British Columbia, Canada

TO BE INSTALLED BY ELECTRICIAN

  • Double outdoor outlet: In ground solution. Cable not visible in drawing. To be determined by electrician.

TO BE PLUGGED IN INSTALLED OUTLETS BY CLIENT

  • Licht lantaarn:
    • Type: FLOS Ipnos
    • Color: Anodized Black

Project Information: Andrew van Egmond Designing Garden & Landscape www.andrewvanegmond.com 06-121 68 505

Project Details: Final Design | 2820 Shoreline Drive | View Royal | December 8, 2022

Map Annotations:

  • Approximate area to be rehabilitated and planted with native plants per the environmental consultant recommendation.
  • New flag post.
  • Floor level 6.19m.