Presentation
What Do We Need? - Penmark/ThinkEco Proposition
June 20, 2023Pages 25–284 sections
Presentation slides detailing the specific requirements and goals for a pilot track installation on the Galloping Goose trail.
2-3 km installation of track6 month for feasibility worksProposed location: Galloping Goose trail
What Do We Need?
Proposition
- Galloping Goose Trail (or similar) access
- 2-3 km installation of track
- Extrapolation of costs to entire route
- 6 month for feasibility works
- E.g. Site assessments, identify standards and approvals, preliminary specifications

Commitment
- Local job creation
- Knowledge transfer
- Apprenticeships/training
- Sustainable business model
Page 25–28
How will it be achieved
Track Optioneering
- Assessment of infrastructure
- Integrated with all users
- Working with the community





Page 25–28
How will it be achieved
Vehicle Optioneering
- Environmentally acceptable bi-directional vehicle
- Selection of vehicle format
- System integration

Page 25–28
Summary
- What: Site to install 2.3 km pilot track and store vehicles
- Why: Determine the ‘right solution’, extrapolate whole route Capex, local demonstration and support
- Who: Local contractors, local experts, local crew, supported by solution agnostic team
- When: 6-month feasibility programme
- Where: Galloping Goose trail (or similar)
- Considering local infrastructure and environmental conditions
- Considering safe integration with other users (e.g. cyclists)
Page 25–28
Document Images
(3)Extracted from: 2023 06 20 Council Agenda - Agenda - Pdf


