February 17, 2015Page 501 section

Relevant guidelines from the View Royal OCP regarding marsh shores and environmental protection.

8.1.a Environmental Development Permit with Variances No. 2014/08 - 77 Caton Place
Pages 170-171 of the 2011 OCP

Environmental Impact Assessment for 77 Caton Place, Victoria, BC

Appendix 2. Excerpt from View Royal Official Community Plan (2011) pp170-171

Marsh Shores include both mudflat and delta areas, and are generally highly sensitive and productive natural areas. The intertidal (foreshore) zone in this area is typically dynamic, changing in response to large stream flows and storm events. Though dynamic, the shore zone in these areas is generally accreting rather than eroding. It is important to allow sufficient space to allow these natural sediment processes to occur. With this type of shoreline, the following guidelines apply:

i. Provide a property-specific assessment with respect to building setbacks and shore protection designs, as stream sediment processes are important and will vary from site to site.

ii. Dredging or filling of marsh shore should not be permitted.

iii. Use of marsh shore areas should be limited to park or conservation uses that do not require structural intrusions.

iv. Where shore protection measures are necessary, make use of "beach nourishment" designs, which add appropriately sized material to the upper beach, creating a natural beach slope and beach armour.

v. Sea walls and rip rap embankments should not be used to protect these shoreline areas.

Page 50

Document Images

(1)
Document image
Extracted from: 2015 02 17 Council Agenda