Boulevard Transportation: Traffic Impacts for Proposed Jedburgh Subdivision

July 21, 2015Pages 81–821 section

Analysis of projected vehicle trip generation for the new 7-lot subdivision.

1 CALL TO ORDER
April 9, 2015Projected 5 AM peak hour and 7 PM peak hour vehicle trips.

RE: TRAFFIC IMPACTS FOR PROPOSED JEDBURGH / BISHAN SUBDIVISION, VIEW ROYAL, BC

April 9, 2015

K-Star Home Improvement Ltd. #308-50 Songhees Victoria, BC V9A 7J4

Attention: John Koren

Boulevard Transportation, a division of Watt Consulting Group, was retained by K-Star Home Improvement Ltd. to conduct a review of the impacts of traffic for the seven lot subdivision on Bishan Place in View Royal.

Trip Generation

The proposed development (single family residential) will generate 5 vehicle trips during the AM peak hour and 7 vehicle trips during the PM based on the ITE’s Trip Generation Manual 9th Edition.

Table 1 summarizes trip generation for the new development.

Table 1: Peak Hour Trip Generation (Proposed Development)

ITE Code Land Use Unit Trip Rate Trips In Trips Out Total Trips
210 Single Family 7 0.75/unit (AM) 1 4 5
1.00/unit (PM) 4 3 7

Traffic Volumes

Traffic counts were undertaken by Boulevard Transportation on Bishan Place at Burnett Road during the AM and PM peak hour on April 7, 2015. Traffic volumes on Bishan Place were measured at 10 vehicles during the AM peak hour and 12 vehicles during the PM peak hour. With the development traffic, the volumes on Bishan Place will increase to 15 vehicles during the AM peak hour and 19 vehicles during the PM. See Figure 1 for a comparison between the existing and post development traffic volumes on Bishan Place.

Figure 1 - Volume Comparison on Bishan Place, displaying diagrams for AM and PM Peak Hour Volumes comparing existing and post-development vehicle counts
Figure 1 - Volume Comparison on Bishan Place, displaying diagrams for AM and PM Peak Hour Volumes comparing existing and post-development vehicle counts

Conclusion / Recommendation:

The proposed site will generate 5 vehicle trips during the AM peak hour and 7 vehicle trips during the PM peak hour. Bishan Place (site access road) will remain as a low volume road with the development trips added.

Nadine King, P.Eng., PTOE Senior Engineer / Project Manager

Page 81–82