Construction Steps - Dock 333A Stewart Ave.

June 16, 2015Page 221 section

Detailed construction steps provided by the applicant for the proposed wooden dock and ramp.

1. CALL TO ORDER
1.6M wide wooden deck

Construction Steps - Dock 333A Stewart Ave.

From: Gary Mathies Date: Fri, May 08, 2015 11:02 AM Subject: Construction Steps - Dock 333A Stewart Ave. To: Gary Mathies

Construction Steps(owner's point of view)

  • level off an existing sloping cement pathway allowing access to a new wooden deck
  • add three steps from this cement pathway down to a new wooden deck
  • build a wooden deck 1.6M wide along an existing stone wall
  • attach a ramp from this wooden deck out to the new floating dock
  • dock and ramp to be built off-site and floated into position.

Sincerely, Gary Mathies