Appendix
Construction Steps - Dock 333A Stewart Ave.
June 16, 2015Page 221 section
Detailed construction steps provided by the applicant for the proposed wooden dock and ramp.
1.6M wide wooden deck
Construction Steps - Dock 333A Stewart Ave.
From: Gary Mathies Date: Fri, May 08, 2015 11:02 AM Subject: Construction Steps - Dock 333A Stewart Ave. To: Gary Mathies
Construction Steps(owner's point of view)
- level off an existing sloping cement pathway allowing access to a new wooden deck
- add three steps from this cement pathway down to a new wooden deck
- build a wooden deck 1.6M wide along an existing stone wall
- attach a ramp from this wooden deck out to the new floating dock
- dock and ramp to be built off-site and floated into position.
Sincerely, Gary Mathies
Page 22
Extracted from: 2015 06 16 Council Agenda