Council Meeting/Documents/Attachment 7b: Compound Layout Plan
Appendix

Attachment 7b: Compound Layout Plan

May 15, 2012Page 391 section

Close-up plan of the equipment shelter and backup generator enclosure within the compound.

1. CALL TO ORDER
2135mm high chain link fence

COMPOUND LAYOUT PLAN - BC0553 - MUNNS ROAD

Technical site plan drawing titled "COMPOUND LAYOUT PLAN" showing the layout of a telecommunications facility including equipment shelter, generator area, tower foundation, and fencing.
Technical site plan drawing titled "COMPOUND LAYOUT PLAN" showing the layout of a telecommunications facility including equipment shelter, generator area, tower foundation, and fencing.

Drawing Information

  • Consulting Engineers: ROBERTSON KOLBEINS TEEVAN GALLAHER ASSOCIATES LTD (RKTG), 1985 W. 4th AVE. VANCOUVER, BRITISH COLUMBIA V6J 1M8
  • Drawing No.: B19-3027-102.1
  • Revision: 3
  • Project: BC0553 - MUNNS ROAD
  • Scale: 1:75
  • Date: MAY 4, 2012

Revision History

No. Date Revisions
1 OCT 26, 2011 CLIENT REVIEW/COMMENT
2 APRIL 20, 2012 ISSUED FOR CONSTRUCTION
3 MAY 4, 2012 TOWER HEIGHT REVISED

Site Plan Notes and Components

  • DC Generator and Propane Storage: Option 1. See TRK Engineering Drawings.
  • W/G Bridge and Foundation: By Westower.
  • Tower: 55m Self-Support Tower and Foundation by Westower.
  • Equipment Shelter: TELUS Equipment Shelter 810 (2590 x 3208 o/o) (8'-6" x 10'-6").
  • Fencing: 2135mm high chain link fence c/w Mangate access gate to TELUS standards.
  • Access: 915mm Mangate.
  • Site Features: Stairs to suit ground.
  • Reference Points: TRUE NORTH and PROJECT NORTH indicators; survey markers 263, 264, and 265.

Dimension Data (Millimeters)

  • Generator/Propane Storage Area: 3188 x 2438, set back 500 from boundary.
  • Fencing Segments: 7100, 6200, 1700, 630, 600.
  • Shelter Positioning Dimensions: 2641, 2130, 3241, 2283.
  • Other dimensions: 180, 178.

Approval and Administrative Details

  • Engineer: G. Andersen (Date: OCT. 2011)
  • Drawn By: A. Padua (Plot: 1:1)
  • Checked By: G. Andersen
  • Approved By: R. Carter (Plot Date: May 4, 2012)
Page 39