Council Meeting/Documents/Site Layout Plan - Drawing B19-3027-102
Appendix

Site Layout Plan - Drawing B19-3027-102

May 15, 2012Page 861 section

Technical layout showing the precise location of the tower foundation and equipment shelter.

1. CALL TO ORDER
1:200 scale

SITE LAYOUT PLAN - MUNNS ROAD

Site Layout Plan for a Telus telecommunications site at Munns Road, showing a detailed topographical map with property lines, road boundaries, existing roads, and overhead power lines. The plan identifies a proposed 55m self-support tower and foundation, an equipment shelter, and specific site actions such as the removal of a large rock and numbered trees.
Site Layout Plan for a Telus telecommunications site at Munns Road, showing a detailed topographical map with property lines, road boundaries, existing roads, and overhead power lines. The plan identifies a proposed 55m self-support tower and foundation, an equipment shelter, and specific site actions such as the removal of a large rock and numbered trees.

General Notes

  • TREES THAT ARE NUMBERED ARE TO BE REMOVED. SEE McILVANEY SURVEY DRAWING FOR SPECIES AND DIAMETER

Site Plan Details

  • Scale: 1:200
  • Project Name: RKTG BC0553 — MUNNS ROAD
  • Proposed Infrastructure:
    • TELUS EQUIPMENT SHELTER 810 (2590 x 3208 o/o) (8'-6" x 10'-6")
    • 55m SELF-SUPPORT TOWER AND FOUNDATION BY WESTOWER
    • CENTROID OF TOWER AS MARKED ON SITE
  • Site Features and Markers:
    • Road Boundary
    • Property Line
    • R/W Boundary
    • Existing Road
    • Overhead Power / Overhead Distribution Line
    • Tree Line
    • Denotes existing tree (marked with numbered symbols like 356, 264, 263, 265, 180, 178, 211)
    • Action: REMOVE LARGE ROCK

Revision History

No. Revision Date
1 PRELIMINARY APR 11, 2007
2 BUILDING RELOCATED JUNE 20, 2007
3 BUILDING PERMIT JULY 18, 2007
4 COORD. TREES LOCATED SEPT 10, 2007
5 REV. TOWER & BLDG. FOOT PRINT SEPT 21, 2007
6 CLIENT REVIEW/COMMENT OCT 26, 2007
7 ISSUED FOR CONSTRUCTION APR 3, 2012
8 TOWER HEIGHT REVISED MAY 4, 2012

Project Administration

  • Consulting Engineers: ROBERTSON KOLBEINS TEEVAN GALLAHER ASSOCIATES LTD.
  • Drawing No.: B19-3027-102
  • Revision: 8
  • Date: APR 2007
  • Plot Date: MAY 4, 2012
  • Personnel:
    • ENG: G. ANDERSEN
    • DR: RJ/ANP
    • CHK: G. ANDERSEN
    • APP: R. CARTER
    • PLOT: 1:1
Page 86