This site is in beta — data may be incomplete and features are still being added.
Council Meeting/Documents/S. Bowen, Urban Systems, Re: Regional Water Supply Development Cost Charge Bylaw
Delegation

S. Bowen, Urban Systems, Re: Regional Water Supply Development Cost Charge Bylaw

November 7, 2023Pages 154–1786 sections

A delegation presentation from Urban Systems regarding the Regional Water Supply Development Cost Charge (DCC) Bylaw.

5.a S. Bowen, Urban Systems, Re: Regional Water Supply Development Cost Charge Bylaw
Regional Water SupplyDevelopment Cost Charge Bylaw

SYNCHRO MODELLING SOFTWARE DESCRIPTION

The traffic analysis was completed using Synchro and SimTraffic traffic modeling software. Results were measured in delay, level of service (LOS) and 95th percentile queue length. Synchro is based on the Highway Capacity Manual (HCM) methodology. SimTraffic integrates established driver behaviours and characteristics to simulate actual conditions by randomly "seeding" or positioning vehicles travelling throughout the network. The simulation is run five times (five different random seedings of vehicle types, behaviours and arrivals) to obtain statistical significance of the results.

Levels of Service

Traffic operations are typically described in terms of levels of service, which rates the amount of delay per vehicle for each movement and the entire intersection. Levels of service range from LOS A (representing best operations) to LOS E/F (LOS E being poor operations and LOS F being unpredictable / disruptive operations). LOS E/F are generally unacceptable levels of service under normal everyday conditions.

The hierarchy of criteria for grading an intersection or movement not only includes delay times, but also takes into account traffic control type (stop signs or traffic signal). For example, if a vehicle is delayed for 19 seconds at an unsignalized intersection, it is considered to have an average operation, and would therefore be graded as an LOS C. However, at a signalized intersection, a 19 second delay would be considered a good operation and therefore it would be given an LOS B. The table below indicates the range of delay for LOS for signalized and unsignalized intersections.

Table A1: LOS Criteria, by Intersection Traffic Control

Level of Service Unsignalized Intersection Average Vehicle Delay (sec/veh) Signalized Intersection Average Vehicle Delay (sec/veh)
A Less than 10 Less than 10
B 10 to 15 11 to 20
C 15 to 25 20 to 35
D 25 to 35 35 to 55
E 35 to 50 55 to 80
F More than 50 More than 80
Page 154–178

APPENDIX B: PRELIMINARY LEFT TURN LANE DESIGN

Preliminary Left Turn Lane Design concept map showing Island Highway and Prince Robert Drive, including 20m storage length, bike lanes, sidewalks, and property lines
Preliminary Left Turn Lane Design concept map showing Island Highway and Prince Robert Drive, including 20m storage length, bike lanes, sidewalks, and property lines
Page 154–178

APPENDIX C: TRAFFIC SIGNAL WARRANT RESULTS

Development Scenario Opening Day Pre-Development AM Opening Day Pre-Development PM Opening Day Post-Development AM Opening Day Post-Development PM 2035 10-year Horizon Pre-Development AM 2035 10-year Horizon Pre-Development PM 2035 10-year Horizon Post-Development AM 2035 10-year Horizon Post-Development PM
Traffic Volumes
Major Leg (EB + WB) 1427 1667 1449 1727 1607 1876 1631 1938
Minor Leg (NB, peak direction only) 17 13 91 51 19 14 93 53
Warrant Warrant Met?
Warrant 1: Minimum Vehicular Volume N N N N N N N N
- Major Street combined Vol (vph) > 500? Y Y Y Y Y Y Y Y
- Minor Street combined Vol (vph) > 150? N N N N N N N N
Warrant 2: Interruption of Continuous Traffic N N Y N N N Y N
- Major Street combined Vol (vph) > 750vph? Y Y Y Y Y Y Y Y
- Minor Street combined Vol (vph) > 75vph? N N Y N N N Y N
- Will signal seriously interrupt traffic flow? Y Y Y Y Y Y Y Y
Warrant 3: Progressive Movement NA
Warrant 4: Collision Experience 6 COLLISIONS IN LAST 5 YEARS (4 PDO + 2 CASUALTY)
Warrant 5: System Warrant N N Y N N N Y N
- Total entering volumes > 1000vph? Y Y Y Y Y Y Y Y
- Meets Warrant 1 N N N N N N N N
- Meets Warrant 2 N N Y N N N Y N
- Meets Warrant 6 N N N N N N N N
- Meets Warrant 7 N N Y N N N Y N
- Meets Warrant 9 N N N N N N N N
Warrant 6: Combination Warrant NA
Warrant 7: Four Hour Volume Warrant LACK DATA TO RUN WARRANT BUT LIKELY MET FOR POST DEVELOPMENT AM PEAK
- Minor Street combined Vol (vph) > 80vph? N N Y N N N Y N
Warrant 8: Peak Hour Delay (All 3 Conditions must be met) N N N N N N N N
- One leg of minor >= four vehicle-hours delay (vhd) N N Y (4.02) N (2.95) N N Y (7.21) Y (6.51)
- One leg of minor >= 100 vph N N N N N N N N
- Total intersection volumes >= 800 vph N N Y N N N Y Y
Warrant 9: Peak Hour Volume N N N N N N N N
- One leg of minor >= 100 vph N N N N N N N N
Total Number of Warrants Met? 0 0 2 0 0 0 2 0
Page 154–178

APPENDIX D: SYNCHRO RESULTS

HCM 2010 TWSC 1: Prince Robert Dr/RV Park Access (North Leg) & Island Hwy View Royal 2025 PD AM

Intersection
Int Delay, s/veh 11.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 4 878 14 26 531 0 32 0 59 0 0 0
Future Vol, veh/h 4 878 14 26 531 0 32 0 59 0 0 0
Conflicting Peds, #/hr 0 0 2 2 0 0 2 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 50 87 63 67 84 92 70 92 70 92 92 92
Heavy Vehicles, % 2 3 0 2 4 2 0 2 9 2 2 2
Mvmt Flow 8 1009 22 39 632 0 46 0 84 0 0 0
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 632 0 0 1033 0 0 1750 1748 1022 1788 1759 634
Stage 1 - - - - - - 1038 1038 - 710 710 -
Stage 2 - - - - - - 712 710 - 1078 1049 -
Critical Hdwy 4.12 - - 4.12 - - 7.1 6.52 6.29 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.1 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.1 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.5 4.018 3.381 3.518 4.018 3.318
Pot Cap-1 Maneuver 951 - - 673 - - 68 86 278 63 85 479
Stage 1 - - - - - - 281 308 - 424 437 -
Stage 2 - - - - - - 427 437 - 265 304 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 951 - - 672 - - 62 77 277 40 76 478
Mov Cap-2 Maneuver - - - - - - 62 77 - 40 76 -
Stage 1 - - - - - - 275 301 - 416 398 -
Stage 2 - - - - - - 388 398 - 181 297 -
Approach EB WB NB SB
HCM Control Delay, s 0.1 0.6 159.2 0
HCM LOS F A
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 125 951 - - 672 - - -
HCM Lane V/C Ratio 1.04 0.008 - - 0.058 - - -
HCM Control Delay (s) 159.2 8.8 0 - 10.7 0 - 0
HCM Lane LOS F A A - B A - A
HCM 95th %tile Q(veh) 7.3 0 - - 0.2 - - -

Page 154–178

Construction Impact Assessment & Tree Management Plan

339, 341, 345 Island Highway View Royal, BC

PREPARED FOR: Boardwalk REIT PREPARED BY: Talmack Urban Forestry Consultants Ltd Noah Talbot – Consulting Arborist ISA Certified # PN-6822A Tree Risk Assessment Qualified

DATE OF ORIGINAL REPORT ISSUANCE: March 23, 2023 LAST UPDATED: October 12, 2023

REVISION RECORD

REVISION DESCRIPTION DATE (YYYY-MM-DD) ISSUED BY
R0 Original TPP report delivered to the client. 2023-03-23 NT
R1 Update to original TPP dated 2023-03-23 to reflect review of the updated site plan and additional tree preservation that has been proposed. 2023-07-05 NT
R2 Update to R1 TPP dated 2023-07-05 to reflect review of the updated Civil drawings. 2023-07-10 NT
R3 Update to R2 TPP dated 2023-07-10 to reflect review of the updated Civil drawings and architectural drawings. Note that the footprint of a proposed childcare area was reviewed (this area was designed in a portion of the site that is relatively open – where we anticipate minimal impacts – pending a review of the detailed design at a later stage). 2023-10-12 NT

1. INTRODUCTION

Talmack Urban Forestry Consultants Ltd. was asked to complete a tree inventory, construction impact assessment and management plan for the trees at the following proposed project:

  • Site: 339, 341, 345 Island Highway
  • Municipality: View Royal
  • Client Name: Boardwalk REIT
  • Dates of Site Visit(s): December 12 & 14, 2022
  • Site Conditions: 3 urban lots, No ongoing construction activity
  • Weather During Site Visit: Overcast

The purpose of this report is to address the tree inventory and arborist report requirements of the Town of View Royal Bylaw No. 695. The construction impact assessment section of this report (section 8), is based on plans reviewed to date, including the conceptual servicing plan & conceptual frontage works plan – October 11, 2023 (prepared by McElhanney Ltd.), and architectural package – October 11, 2023 (prepared by DHK Architects). At this time we have not reviewed a detailed landscape plan.

2. TREE INVENTORY METHODOLOGY

Numerated metal tags were used to identify onsite protected trees and trees located on municipal land. Note that all protected trees (per the definition of a tree in the TOVR Bylaw No. 1069) were inventoried. Trees located on neighbouring properties, within influencing distance of the subject site were not tagged. Each tree was visually examined on a limited visual assessment basis (level 1), in accordance with Tree Risk Assessment Qualification (TRAQ) methods (Dunster et al. 2017) and ISA Best Management Practices.

3. EXECUTIVE SUMMARY

Based on review of the Architectural site and parkade plan and civil concept plan provided, it is anticipated that 43 onsite trees will require removal to facilitate construction of the proposed apartment buildings and u/g parking structures. 125 onsite trees, 19 municipal trees, 3 municipal hedge and 3 shared ownership trees (located within influencing distance of the proposed development) are located where they are possible for retention. It is recommended that the English Ivy is removed from the trunk and canopies of retained trees.

4. TREE INVENTORY DEFINITIONS

  • Tag: Tree identification number on a metal tag attached to tree with nail or wire, generally at eye level. Trees on municipal or neighboring properties are not tagged.
  • DBH: Diameter at breast height – diameter of trunk, measured in centimetres at 1.4m above ground level. For trees on a slope, it is taken at the average point between the high and low side of the slope.
    • * Measured over ivy
    • ~ Approximate due to inaccessibility or on neighbouring property
  • Dripline: Indicates the radius of the crown spread measured in metres to the dripline of the longest limbs.
  • Relative Tolerance Rating: Relative tolerance of the tree species to construction related impacts such as root pruning, crown pruning, soil compaction, hydrology changes, grade changes, and other soil disturbance. Three ratings are assigned: Poor (P), Moderate (M) or Good (G).
  • Critical Root Zone: A calculated radial measurement in metres from the trunk of the tree. It is the optimal size of tree protection zone and is calculated by multiplying the DBH of the tree by 10, 12 or 15 depending on the tree’s Relative Tolerance Rating.
    • 15 x DBH = Poor Tolerance of Construction
    • 12 x DBH = Moderate
    • 10 x DBH = Good
  • Health Condition:
    • Poor - significant signs of visible stress and/or decline that threaten the long-term survival of the specimen
    • Fair - signs of stress
    • Good - no visible signs of significant stress and/or only minor aesthetic issues
  • Structural Condition:
    • Poor - Structural defects that have been in place for a long period of time to the point that mitigation measures are limited
    • Fair - Structural concerns that are possible to mitigate through pruning
    • Good - No visible or only minor structural flaws that require no to very little pruning
  • Suitability Ratings:
    • Rating: Suitable. A tree with no visible or minor health or structural defects, is tolerant to changes to the growing environment and is a possible candidate for retention provided that the critical root zone can be adequately protected.
    • Rating: Conditional. A tree with good health but is a species with a poor tolerance to changes to its growing environment or has a structural defect(s) that would require that certain measures be implemented.
    • Rating: Unsuitable. A tree with poor health, a major structural defect, or a species with a poor tolerance to construction impacts, and unlikely to survive long term.
  • Retention Status:
    • Remove - Not possible to retain given proposed construction plans
    • Retain - It is possible to retain this tree in the long-term given the proposed plans and information available.
    • Retain * - See report for more information regarding potential impacts

Table 1. Tree Inventory

Page 154–178
Tag # Location Bylaw protected Common Name Botanical Name DBH (cm) Dripline radius (m) Critical root zone radius (m) Condition Health Condition Structural Relative tolerance Retention suitability General field observations/remarks Tree Retention Comments Retention status
2227 On Yes Willow Salix sp. 23, 23, 19, 36, 8, 12, 10, 8, 8, 8, 10 4 7.6 Fair Fair to poor Moderate unsuitable Basal and trunk decay, stem failures with associated decay, cluster stems Will be impacted by excavation required for the footprint of the proposed u/g parking structure and sidewalk. Remove
2228 On Yes Big leaf maple Acer macrophyllum 34 3 4.1 Fair Fair Moderate conditional Asymmetrical crown, codominant with adjacent trees, small deadwood The project arborist to supervise all excavation required within the critical root zone. Retain
2229 City Yes Big leaf maple Acer macrophyllum 39 5 4.7 Fair to poor Poor Moderate unsuitable Codominant stem failure, basal decay, leaning to the north The project arborist to supervise all excavation required within the critical root zone. Retain
2230 City Yes Big leaf maple Acer macrophyllum 34 4 4.1 Fair Fair to poor Moderate Rooted against rock out cropping, covered in ivy The project arborist to supervise all excavation required within the critical root zone. Retain
2231 City Yes Big leaf maple Acer macrophyllum 51* 4 6.1 Fair Poor Moderate Deflection in lower stem, rooted against rock, covered in ivy, asymmetrical crown, wounds with associated decay The project arborist to supervise all excavation required within the critical root zone. Retain
2232 City Yes Bitter cherry Prunus emarginata 18, 21, 10 N/A 4.5 Dead Dead N/A Appears dead, standing deadwood, cluster of stems The project arborist to supervise all excavation required within the critical root zone. Retain
2233 City Yes Big leaf maple Acer macrophyllum 31, 9, 24, 5, 12 3 6.3 Poor Fair to poor Moderate Cluster of stems, declining health, deflections lower trunk, hanging deadwood The project arborist to supervise all excavation required within the critical root zone. Retain
2234 City Yes Big leaf maple Acer macrophyllum 13, 25, 49 5 8.6 Fair Fair to poor Moderate Rooted on top of rock out cropping, included bark at lower union, ivy around trunk, small to medium sized deadwood The project arborist to supervise all excavation required within the critical root zone. Retain
Hedge1 City No Leyland cypress hedge Cupressus x leylandii 25 stems, 9cm to 24cm 2mx15m 2 Fair to poor Fair Good Health stress, row of stems The project arborist to supervise all excavation required within the critical root zone. Retain
2235 City Yes Big leaf maple Acer macrophyllum 25, 41, 54, 55, 38, 40, 22, 22, 52, 45* 12 14 Fair Fair to poor Moderate Cluster of stems, small to large sized deadwood, included bark at basal unions, some health stress The project arborist to supervise all excavation required within the critical root zone. Retain
2236 On Yes Garry oak Quercus garryana 26, 24, 26, 19* 4 5.6 Fair Fair Good suitable Cluster of stems, ivy around lower trunk, somewhat narrow crown on each stem The project arborist to supervise all excavation required within the critical root zone. Retain
2237 On Yes Big leaf maple Acer macrophyllum 48, 44 8 8.9 Fair Fair to poor Moderate Conditional Seam on western stem, small to medium sized deadwood, included bark at lower union Located within the footprint of the proposed u/g parking structure. Remove
2238 On Yes Big leaf maple Acer macrophyllum 58, 38 7 9.7 Fair Fair to poor Moderate Conditional Historically stem loss with fungal growth, medium to large sized deadwood, rooted on slope, asymmetrical crown Will be heavily impacted by excavation required to construct the proposed u/g parkade. Remove
2239 On Yes Douglas fir Pseudotsuga menziesii 57 5 6.8 Fair Fair Moderate Conditional Trunk deflection at 10m, some health stress, asymmetrical crown, small deadwood Will be heavily impacted by excavation required to construct the proposed u/g parkade. Remove
2240 On Yes Douglas fir Pseudotsuga menziesii 59 9 7.1 Fair Fair Moderate Conditional Epicormic growth, trunk deflection at 10m, codominant with adjacent Douglas firs Located within the footprint of the proposed u/g parking structure. Remove
2241 On Yes Douglas fir Pseudotsuga menziesii 69 9 8.3 Fair Fair Moderate Conditional Epicormic growth, trunk deflection at 10m, codominant with adjacent Douglas firs, ps fruiting body located 2m from root flare Located within the footprint of the proposed u/g parking structure. Remove
2242 On Yes Douglas fir Pseudotsuga menziesii 64 9 7.7 Fair Fair to poor Moderate Conditional Epicormic growth, trunk deflection at 10m, codominant with adjacent Douglas firs, ps fruiting body located 2m from root flare, girdle root, possible surface rooting Will be heavily impacted by excavation required to construct the proposed u/g parkade. Remove
2243 On Yes Douglas fir Pseudotsuga menziesii 66 9 7.9 Fair Fair to poor Moderate Conditional Epicormic growth, trunk deflection at 10m, codominant with adjacent Douglas, ps fruiting body at base, possible surface rooting Will be heavily impacted by excavation required to construct the proposed interior access road. Remove
2244 On Yes Douglas fir Pseudotsuga menziesii 47 9 5.6 Fair to poor Fair to poor Moderate Conditional Health decline, epicormic growth, trunk deflection at 10m, leader in decline, codominant with adjacent Douglas Will be heavily impacted by excavation required to construct the proposed interior access road. Remove
2245 On Yes Western Red Cedar Thuja plicata 34, 17, 40, 16, 12, 14, 19 4 8.6 Fair Fair Moderate Conditional Historically stem removal, bark stripping on northern most stem, lean to the north Will be heavily impacted by excavation required to construct the proposed u/g parkade. Remove
2246 On Yes Shore pine Pinus contorta 41, 63, 46 7 13.8 Fair to poor Fair Moderate Conditional Possible pitch moth infestation, included bark at basal unions, historical heading cuts on western side of canopy, some health decline Will be heavily impacted by excavation required to construct the proposed u/g parkade. Remove
2247 On Yes Plum Prunus sp. 37, 26, 36 5 8.9 Fair Fair Moderate Conditional Included bark at basal union, small deadwood, historically pruned, some wounding on upper canopy stems Will be heavily impacted by excavation required to construct the proposed u/g parkade. Remove
2248 On Yes Plum Prunus sp. 20, 4x14cm, 5x10cm 4 3.8 Fair Fair Moderate Unsuitable Cluster of stems, included bark at basal unions Will be heavily impacted by excavation required to construct the foundation of the proposed u/g parkade. Remove
2249 On Yes Plum Prunus sp. 2x11cm, 3x8cm, 11x5cm 3 2.9 Fair Fair Moderate Unsuitable Cluster of stems, included bark at basal unions Located within the footprint of the proposed u/g parkade. Remove
2250 On Yes Red Alder Alnus rubra 52 6 7.8 Poor Poor Poor Unsuitable Advanced health decline, dead leader, very limited live crown, larger deadwood Will be heavily impacted by excavation required to construct the proposed u/g parkade. Remove
2251 On Yes Big leaf maple Acer macrophyllum 49, 25 10 7.7 Fair Fair Moderate Conditional Lean to the north, small to medium asymmetrical crown, suppressed by adjacent Douglas fir *u/g parkade and building proposed within the critical root zone. The project arborist to supervise all excavation required within the critical root zone. Retain*
2252 On Yes Douglas fir Pseudotsuga menziesii 80, 93 7 16.9 Fair to good Fair Moderate Suitable Epicormic growth, two large Douglas fir, codominant with adjacent arbutus, limbs are somewhat extended and end weighted *u/g parkade and building proposed within the critical root zone. The project arborist to supervise all excavation required within the critical root zone. Retain*
2253 On Yes Arbutus Arbutus menziesii 77 12 11.6 Fair to good Fair to good Poor Suitable Lean to the west, codominant with adjacent Douglas firs, small deadwood, old tag 209 *u/g parkade and building proposed within the critical root zone. The project arborist to supervise all excavation required within the critical root zone. Retain*
2254 On Yes Big leaf maple Acer macrophyllum 19 5 2 Fair Fair to poor Moderate Conditional Lean to the west, rooted in rock, small deadwood The project arborist to supervise all excavation required within the critical root zone. Retain
2255 On Yes Big leaf maple Acer macrophyllum 11 3 1.3 Fair Fair Moderate Conditional Lean to the south, rooted in rock, ivy around lower trunk The project arborist to supervise all excavation required within the critical root zone. Retain
2256 On Yes Garry oak Quercus garryana 21 6 2.1 Fair to poor Fair Good Suitable Rooted on rock out crop, lean to the west, heavy ivy infestation, narrow crown, old tag 12210 The project arborist to supervise all excavation required within the critical root zone. Retain
2257 On Yes Big leaf maple Acer macrophyllum 39, 31* 7 6.9 Fair Fair to poor Moderate Conditional Medium to large deadwood, included bark at basal union, asymmetrical crown The project arborist to supervise all excavation required within the critical root zone. Retain
2258 On Yes Big leaf maple Acer macrophyllum 34, 39, 44* 6 10.5 Fair Fair to poor Moderate Conditional Medium sized deadwood, included bark at basal union, asymmetrical crown The project arborist to supervise all excavation required within the critical root zone. Retain
2259 On Yes Big leaf maple Acer macrophyllum 35 5 4.2 Fair Fair Moderate Conditional Small deadwood, lean to the south, ivy around lower trunk, The project arborist to supervise all excavation required within the critical root zone. Retain
2260 On Yes Grand fir Quercus garryana 89 7 13.4 Fair Fair Poor Conditional Some health stress, hollow sounding lower trunk, small wound above root flare, codom with Douglas fir Will be heavily impacted by excavation required to construct the foundation of the proposed building. Remove
2261 On Yes Douglas fir Pseudotsuga menziesii 88 8 10.6 Fair Fair Moderate Conditional Somewhat extended limbs, chain link wrapped around lower trunk with some girdle action, codom with grand fir, small deadwood Will be heavily impacted by excavation required to construct the foundation of the proposed building. Remove
2262 On Yes Willow Salix sp. 30, 31 8 5.9 Fair to poor Poor Moderate Unsuitable Ganoderma applanatum fruiting bodies on lower trunk, partially failed, corrected stems, deadwood, wound/split in upper canopy with associated decay The project arborist to supervise all excavation required within the critical root zone. Retain
2263 On Yes Douglas fir Pseudotsuga menziesii 81 9 9.7 Fair Fair Moderate Conditional Open grown, health stress, surface root damage, heavily surface rooted, small deadwood Located within the footprint of the proposed u/g parkade. Remove
2264 On Yes Blue spruce Picea pungens 43 3 5.2 Poor Poor Moderate Unsuitable In advanced stages of health decline due to recent fire scorching. Will be heavily impacted by excavation required to construct the foundation of the proposed u/g parkade. Remove
2265 On Yes Big leaf maple Acer macrophyllum 35, 10, 16, 41, 14, 19, 23 6 7.2 Fair Fair Moderate Conditional Cluster of stems, included bark at basal union, asymmetrical crown weighted to the west Will be heavily impacted by excavation required to construct the foundation of the proposed u/g parkade. Remove
2266 On Yes Douglas fir Pseudotsuga menziesii 58 4 7.0 Fair Fair to good Moderate Conditional Some health stress, slight deflection in lower trunk Located within the footprint of the proposed u/g parkade. Remove
2267 On Yes Grand fir Abies grandis 60* 5 9 Fair to poor Fair Poor Unsuitable Health stress, ivy around lower trunk, small deadwood Will be heavily impacted by excavation required to construct the foundation of the proposed u/g parkade. Remove
2268 On Yes Douglas fir Pseudotsuga menziesii 24 3 2.9 Fair to poor Fair Moderate Unsuitable Health stress, girdle root, epicormic growth Will be heavily impacted by excavation required to construct the foundation of the proposed u/g parkade. Remove
2269 On Yes Douglas fir Pseudotsuga menziesii 28 3 3.4 Poor Fair Moderate Unsuitable Health stress, small deadwood, low lcr, ivy around trunk Will be heavily impacted by excavation required to construct the foundation of the proposed u/g parkade. Remove
2270 On Yes Douglas fir Pseudotsuga menziesii 15 3 1.8 Fair Fair to good Moderate Unsuitable Some health stress, ivy around lower trunk Will be heavily impacted by excavation required to construct the foundation of the proposed u/g parkade. Remove
2271 On Yes Douglas fir Pseudotsuga menziesii 18 3 2.2 Fair Fair Moderate Conditional Asymmetrical crown weighted to the north, corrected lean to the north Located within the footprint of the proposed u/g parkade. Remove
2272 On Yes Douglas fir Pseudotsuga menziesii 22 2 2.6 Fair to poor Fair to poor Moderate Unsuitable Corrected lean to the east, low lcr, health stress, high narrow crown Located within the footprint of the proposed u/g parkade. Remove
2273 On Yes Lawson cypress Chamaecyparis lawsoniana 15, 18, 19, 27 3 4.9 Poor Fair to poor Good Unsuitable Advanced health stress, included bark at basal union, very sparse canopy, low lcr Located within the footprint of the proposed u/g parkade. Remove