This site is in beta — data may be incomplete and features are still being added.
Council Meeting/Documents/A. Andres, S. Cleave and L. Keenan, Westshore Primary Care Society, Re: Not-for-Profit Primary Care Clinics
Delegation

A. Andres, S. Cleave and L. Keenan, Westshore Primary Care Society, Re: Not-for-Profit Primary Care Clinics

November 7, 2023Pages 179–1842 sections

A presentation by the Westshore Primary Care Society regarding the operation of not-for-profit primary care clinics.

5.b A. Andres, S. Cleave and L. Keenan, Westshore Primary Care Society, Re: Not-for-Profit Primary Care Clinics
Westshore Primary Care SocietyNot-for-Profit Primary Care Clinics

Construction Impact Assessment and Tree Management Plan Tree Inventory

Page 179–184
Tag # Surveyed (Yes/No) Location (On, Off, Shared, City) Bylaw protected (Yes/No) Name (Common) Name (Botanical) DBH (cm) Dripline radius (m) Critical root zone radius (m) Condition (Health) Condition (Structural) Relative tolerance Retention suitability General field observations/remarks Tree Retention Comments Retention status
2274 Yes On Yes Walnut Juglans sp. 17, 16, 12 3 5.1 Fair Fair Poor Conditional Ivy around base, included bark in basal union, lean to the west *u/g parkade proposed within the critical root zone. The project arborist to supervise all excavation required within the critical root zone. Crown clearance pruning to be performed to ANSI A300 standards. Retain*
2275 Yes On Yes Big leaf maple Acer macrophyllum 30, 10, 10,19, 22, 16 6 6.6 Fair Fair Moderate Conditional Lean to the west, edge tree, ivy around lower trunk, small deadwood *u/g parkade proposed within the critical root zone. The project arborist to supervise all excavation required within the critical root zone. Retain*
2276 Yes On Yes Big leaf maple Acer macrophyllum 15 5 1.8 Fair Fair Moderate Conditional Lean to the west, edge tree, ivy around lower trunk, small deadwood *u/g parkade proposed within the critical root zone. The project arborist to supervise all excavation required within the critical root zone. Retain*
2277 Yes On Yes Douglas fir Pseudotsuga menziesii 54 5 6.5 Fair Fair to poor Moderate Conditional Asymmetrical crown weighted to the west, some health stress, ivy around base, slight deflection in lower trunk *u/g parkade proposed within the critical root zone. The project arborist to supervise all excavation required within the critical root zone. Retain*
2278 Yes On Yes Shore pine Pinus contorta 26* 2 3.1 Fair to poor Fair Moderate Conditional Ivy around lower trunk, small deadwood, low lcr, high narrow Located within the footprint of the proposed u/g parkade. Remove
2279 Yes On Yes Big leaf maple Acer macrophyllum 28* 3 3.4 Fair Fair Moderate Conditional Lean to the north, asymmetrical crown, small deadwood *u/g parkade proposed within the critical root zone. The project arborist to supervise all excavation required within the critical root zone. Retain*
2280 Yes On Yes Big leaf maple Acer macrophyllum 25* 2 3 Fair Fair Moderate Conditional Codominant crown, ivy covered suppressed *u/g parkade proposed within the critical root zone. The project arborist to supervise all excavation required within the critical root zone. Retain*
2281 Yes On Yes Douglas fir Pseudotsuga menziesii 57 5 6.8 Fair Fair Moderate Conditional Codominant crown, ivy covered suppressed, small deadwood, some health stress The project arborist to supervise all excavation required within the critical root zone. Retain
2282 Yes On Yes Big leaf maple Acer macrophyllum 20 1 2.4 Poor Fair to poor Moderate Conditional High narrow crown, low lcr The project arborist to supervise all excavation required within the critical root zone. Retain
2283 Yes On Yes Big leaf maple Acer macrophyllum 25, 17 4 4.2 Fair Fair Moderate Conditional The project arborist to supervise all excavation required within the critical root zone. Retain
2284 Yes On Yes Big leaf maple Acer macrophyllum 15 1 1.8 Poor Fair to poor Moderate Conditional High narrow crown, low lcr The project arborist to supervise all excavation required within the critical root zone. Retain
2285 No On Yes Arbutus Arbutus menziesii 15 1 2.3 Fair to good Fair to good Poor Conditional Ivy around base, young tree The project arborist to supervise all excavation required within the critical root zone. Retain
2286 Yes On Yes Douglas fir Pseudotsuga menziesii 29 3 3.5 Fair to good Fair Moderate Conditional Subdominant, some what suppressed, ivy The project arborist to supervise all excavation required within the critical root zone. Retain
2287 Yes On Yes Big leaf maple Acer macrophyllum 30 4 3.6 Fair Fair Moderate Conditional Asymmetrical crown, some hat suppressed by adjacent Douglas fir The project arborist to supervise all excavation required within the critical root zone. Retain
2288 Yes On Yes Big leaf maple Acer macrophyllum 28, 23 5 5.0 Fair Fair Moderate Conditional Ivy, small to medium sized deadwood, asymmetrical crown The project arborist to supervise all excavation required within the critical root zone. Retain
2289 Yes On Yes Big leaf maple Acer macrophyllum 14 5 1.7 Fair to poor Fair Moderate Conditional Small canopy, lean to east The project arborist to supervise all excavation required within the critical root zone. Retain
2290 Yes On Yes Big leaf maple Acer macrophyllum 31 4 3.7 Fair Fair Moderate Conditional Small deadwood, asymmetrical crown The project arborist to supervise all excavation required within the critical root zone. Retain
2291 Yes On Yes Big leaf maple Acer macrophyllum 22, 16 4 3.8 Fair Fair to poor Moderate Conditional Surrounded by maple snags, lean to the north, ivy The project arborist to supervise all excavation required within the critical root zone. Retain
2292 Yes On Yes Douglas fir Pseudotsuga menziesii 26 3 3.1 Fair Fair Moderate Conditional Epicormic growth, asymmetrical crown, some health stress The project arborist to supervise all excavation required within the critical root zone. Retain
2293 Yes On Yes Douglas fir Pseudotsuga menziesii 22 3 2.6 Fair Fair to good Moderate Conditional Some health stress, somewhat suppressed The project arborist to supervise all excavation required within the critical root zone. Retain
2294 Yes On Yes Douglas fir Pseudotsuga menziesii 11 1 1.3 Fair to poor Fair Moderate Conditional Health stress, suppressed, low lcr The project arborist to supervise all excavation required within the critical root zone. Retain
2295 Yes On Yes Douglas fir Pseudotsuga menziesii 10 1 1.2 Fair Fair to poor Moderate Conditional Deflected leader, asymmetrical crown, some health stress The project arborist to supervise all excavation required within the critical root zone. Retain
2296 No On Yes Douglas fir Pseudotsuga menziesii 29 3 3.5 Fair to poor Fair Moderate Conditional High narrow crown, low lcr, ivy around base, deflection in lower trunk The project arborist to supervise all excavation required within the critical root zone. Retain
2297 Yes On Yes Douglas fir Pseudotsuga menziesii 54 5 6.5 Fair Fair Moderate Conditional Corrected lean to the west, some health stress, small deadwood, ivy around base The project arborist to supervise all excavation required within the critical root zone. Retain
2298 Yes On Yes Big leaf maple Acer macrophyllum 22, 23, 21, 3 5.9 Fair to poor Fair to poor Moderate Conditional Wounds along lower trunk, high narrow crown, ivy around base, small to medium sized deadwood The project arborist to supervise all excavation required within the critical root zone. Retain
2299 Yes On Yes Big leaf maple Acer macrophyllum 15 3 1.8 Poor Poor Moderate Unsuitable Advanced health decline The project arborist to supervise all excavation required within the critical root zone. Retain
2300 Yes On Yes Douglas fir Pseudotsuga menziesii 13 2 1.6 Poor Fair Moderate Unsuitable Dominated by ivy, narrow limited canopy The project arborist to supervise all excavation required within the critical root zone. Retain
2301 Yes On Yes Douglas fir Pseudotsuga menziesii 23 2 2.8 Fair Fair Moderate Conditional Narrow high canopy, ivy around base, small deadwood The project arborist to supervise all excavation required within the critical root zone. Retain
2302 Yes On Yes Douglas fir Pseudotsuga menziesii 15 1 1.8 Poor Fair Moderate Unsuitable Dominated by ivy, narrow limited canopy The project arborist to supervise all excavation required within the critical root zone. Retain
2303 No On Yes Douglas fir Pseudotsuga menziesii 10 1 1.2 Poor Fair Moderate Unsuitable Dominated by ivy, narrow limited canopy The project arborist to supervise all excavation required within the critical root zone. Retain
2304 Yes On Yes Big leaf maple Acer macrophyllum 19, 18, 25, 33 5 7.1 Fair Fair Moderate Conditional Cluster of stems, included bark at lower union, ivy around lower trunk Located within the footprint of the proposed u/g parkade. Retain
2305 Yes On Yes Big leaf maple Acer macrophyllum 17, 14 6 3.0 Fair Fair Moderate Conditional Asymmetrical crown weighted to the west, ivy, included bark at base, narrow live crown The project arborist to supervise all excavation required within the critical root zone. Retain
2306 Yes On Yes Big leaf maple Acer macrophyllum 16, 25 6 4.2 Fair Fair Moderate Conditional Asymmetrical crown weighted to the west, ivy, small to medium sized deadwood The project arborist to supervise all excavation required within the critical root zone. Retain
2307 Yes On Yes Douglas fir Pseudotsuga menziesii 65 8 7.8 Fair to good Fair Moderate Conditional Trunk deflections, small to medium sized deadwood, some health stress, materials piled around root flare, surface rooting Located within the footprint of the proposed u/g parkade. Remove
2308 Yes On Yes Douglas fir Pseudotsuga menziesii 77 8 9.2 Fair to good Fair Moderate Conditional Trunk deflections, small to medium sized deadwood, some health stress, materials piled around root flare, surface rooting Located within the footprint of the proposed u/g parkade. Remove
2309 Yes On Yes Douglas fir Pseudotsuga menziesii 19 2 2.3 Fair to poor Fair Moderate Conditional Health stress, thinning canopy, lower trunk deflection Located within the footprint of the proposed u/g parkade. Remove
2310 Yes On Yes Big leaf maple Acer macrophyllum 10, 7, 6, 13, 6, 12 3 3.1 Fair Fair Moderate Conditional Cluster of stems, small deadwood, rooted in rock Located within the footprint of the proposed u/g parkade. Remove
2311 No On Yes Willow Salix sp. 5x12cm, 5x10cm 7 3.2 Fair Fair to poor Moderate Unsuitable Cluster of stems, medium sized deadwood, some evidence of decay Located within the footprint of the proposed u/g parkade. Remove
2312 No On Yes Big leaf maple Acer macrophyllum 32, 15 2 4.9 Fair Fair Moderate Conditional Ivy, somewhat narrow crown Located within the footprint of the proposed u/g parkade. Remove
2313 Yes On Yes Douglas fir Pseudotsuga menziesii 28 3 3.4 Fair Fair Moderate Conditional Some health stress, ivy around base, small deadwood, lower trunk deflection Located within the footprint of the proposed u/g parkade. Remove
2314 Yes On Yes Big leaf maple Acer macrophyllum 29, 15, 20 5 6 Fair Fair Moderate Conditional Deflection in lower trunk of one stem, asymmetrical crown weighted to the north, small deadwood Located within the footprint of the proposed u/g parkade. Remove
2315 Yes On Yes Big leaf maple Acer macrophyllum 17, 19, 15, 6 4.6 Fair Fair Moderate Conditional Asymmetrical crown weighted to the northwest, cluster of stems, dead stem within cluster Will be heavily impacted by excavation required to construct the foundation of the proposed u/g parkade. Remove
2316 Yes On Yes Douglas fir Pseudotsuga menziesii 100* 9 12 Fair to good Fair Moderate Conditional Small to medium sized deadwood, ivy around trunk, some health stress, possible leader loss or suppression *Building foundation and parkade proposed within the critical root zone. The project arborist to supervise all excavation required within the critical root zone. Retain*
2317 Yes On Yes Big leaf maple Acer macrophyllum 18, 8 4 2.7 Fair to poor Fair Moderate Conditional Ivy, narrow live crown, lean to the east The project arborist to supervise all excavation required within the critical root zone. Retain
2318 Yes On Yes Big leaf maple Acer macrophyllum 16* 4 1.9 Fair to poor Fair Moderate Conditional Ivy, narrow live crown, lean to the east The project arborist to supervise all excavation required within the critical root zone. Retain
2319 Yes On Yes Big leaf maple Acer macrophyllum 15 3 1.8 Fair Fair Moderate Conditional Ivy, narrow live crown The project arborist to supervise all excavation required within the critical root zone. Retain
2320 Yes On Yes Big leaf maple Acer macrophyllum 17 4 2.0 Fair Fair Moderate Conditional Asymmetrical crown weighted to the west The project arborist to supervise all excavation required within the critical root zone. Retain
2321 No On Yes Big leaf maple Acer macrophyllum 23, 11 3 3.6 Fair to poor Fair to poor Moderate Conditional Limited canopy, included bark at basal union The project arborist to supervise all excavation required within the critical root zone. Retain
2322 Yes On Yes Douglas fir Pseudotsuga menziesii 28 3 3.4 Fair Fair Moderate Conditional High crown, ivy around trunk The project arborist to supervise all excavation required within the critical root zone. Retain
2323 Yes On Yes Douglas fir Pseudotsuga menziesii 22 1 2.6 Poor Fair Moderate Unsuitable Dominated by ivy, narrow limited canopy The project arborist to supervise all excavation required within the critical root zone. Retain
2324 Yes On Yes Douglas fir Pseudotsuga menziesii 56 4 6.7 Fair to poor Fair Moderate Conditional Small to medium deadwood, ivy around, health stress The project arborist to supervise all excavation required within the critical root zone. Retain
2325 Yes On Yes Big leaf maple Acer macrophyllum 13, 14* 5 2.6 Fair Fair Moderate Conditional Lean to the north, ivy, suppressed The project arborist to supervise all excavation required within the critical root zone. Retain
2326 No On Yes Big leaf maple Acer macrophyllum 10, 20* 4 3.1 Fair Fair to poor Moderate Conditional Lean to the north, small hanging deadwood, ivy, The project arborist to supervise all excavation required within the critical root zone. Retain
2327 Yes On Yes Douglas fir Pseudotsuga menziesii 62 6 7.4 Fair Fair Moderate Conditional Asymmetrical crown, medium sized deadwood, epicormic growth, health stress The project arborist to supervise all excavation required within the critical root zone. Retain
2328 Yes On Yes Douglas fir Pseudotsuga menziesii 65 4 7.8 Fair Fair Moderate Conditional Asymmetrical crown, medium sized deadwood, epicormic growth, health stress, codominant The project arborist to supervise all excavation required within the critical root zone. Retain
2329 Yes On Yes Arbutus Arbutus menziesii 31 5 4.7 Fair to good Fair to good Poor Conditional Old tag 12457, suppressed, conflicting with adjacent Douglas fir The project arborist to supervise all excavation required within the critical root zone. Retain
2330 Yes On Yes Douglas fir Pseudotsuga menziesii 52 3 6.2 Fair to poor Fair to poor Moderate Conditional Health stress, historical top loss, deflected leader, asymmetrical crown, epicormic *u/g parkade proposed within the critical root zone. The project arborist to supervise all excavation required within the critical root zone. Retain*
2331 Yes On Yes Douglas fir Pseudotsuga menziesii 71 5 8.5 Fair Fair to poor Moderate Conditional Two stems with included bark at lower union, one stem may be subordinated, asymmetrical crown, some health stress Will be heavily impacted by excavation required for the footprint of the proposed u/g parkade. Remove
2332 Yes On Yes Douglas fir Pseudotsuga menziesii 22 2 2.6 Fair to poor Fair to poor Moderate Conditional Leader suppression or loss, materials piled around root flare Will be heavily impacted by excavation required for the footprint of the proposed u/g parkade. Remove
2333 Yes On Yes Douglas fir Pseudotsuga menziesii 51 5 6.1 Fair to good Fair Moderate Conditional Asymmetrical crown, materials piled around base, slight deflection in lower trunk Will be heavily impacted by excavation required for the footprint of the proposed u/g parkade. Remove
2334 Yes On Yes Douglas fir Pseudotsuga menziesii 27 4 3.2 Fair to poor Fair to poor Moderate Conditional Historically leader loss, asymmetrical crown, irregular branch attachments, suppressed Will be heavily impacted by excavation required for the footprint of the proposed u/g parkade. Remove
2335 Yes On Yes Douglas fir Pseudotsuga menziesii 39 4 4.7 Fair Fair to good Moderate Conditional Some health stress, codominant with adjacent Douglas firs Will be heavily impacted by excavation required for the footprint of the proposed u/g parkade. Remove
2336 Yes On Yes Douglas fir Pseudotsuga menziesii 36 4 4.3 Fair Fair to poor Moderate Conditional Deflected leader, asymmetrical crown, small deadwood, burl in lower trunk *Building foundation proposed within the critical root zone. The project arborist to supervise all excavation required within the critical root zone. Retain*
2337 Yes On Yes Douglas fir Pseudotsuga menziesii 50 4 6 Fair Fair Moderate Conditional Health stress, asymmetrical crown, codominant *Building foundation proposed within the critical root zone. The project arborist to supervise all excavation required within the critical root zone. Retain*
2338 Yes On Yes Douglas fir Pseudotsuga menziesii 51 4 6.1 Fair to poor Fair Moderate Conditional Health stress, thinning canopy, epicormic growth, small the medium sized deadwood The project arborist to supervise all excavation required within the critical root zone. Retain
2339 Yes On Yes Big leaf maple Acer macrophyllum 15 3 1.8 Fair Fair to good Moderate Conditional Small deadwood, sub canopy The project arborist to supervise all excavation required within the critical root zone. Retain
2340 Yes On Yes Douglas fir Pseudotsuga menziesii 69, 33 7 10.7 Fair Fair to poor Moderate Conditional Rooted on rock out cropping, medium sized deadwood, photo tropic lean to the northeast, asymmetrical crown The project arborist to supervise all excavation required within the critical root zone. Retain
2341 No On Yes Douglas fir Pseudotsuga menziesii 17, 59 5 8.3 Fair Fair to poor Moderate Conditional Rooted on rock out cropping, medium sized deadwood, phototropic lean to the northwest, asymmetrical crown The project arborist to supervise all excavation required within the critical root zone. Retain
2342 No On Yes Douglas fir Pseudotsuga menziesii 44 3 5.3 Fair Fair Moderate Conditional Asymmetrical crown, corrected lean to the north, ivy around lower trunk, The project arborist to supervise all excavation required within the critical root zone. Retain
2343 Yes On Yes Douglas fir Pseudotsuga menziesii 78 6 9.4 Fair Fair Moderate Conditional Corrected lean to the east, medium deadwood, health stress The project arborist to supervise all excavation required within the critical root zone. Retain
2344 Yes On Yes Douglas fir Pseudotsuga menziesii 56 5 6.7 Fair Fair Moderate Conditional Corrected lean to the south, asymmetrical crown, some health stress The project arborist to supervise all excavation required within the critical root zone. Retain
2345 Yes On Yes Big leaf maple Acer macrophyllum 31 5 3.7 Fair Fair to poor Moderate Conditional Stem deflection at 4m, asymmetrical crown, historically pruned The project arborist to supervise all excavation required within the critical root zone. Retain
2346 Yes On Yes Big leaf maple Acer macrophyllum 47, 36, 37 6 10.9 Fair Fair to poor Moderate Conditional Included bark at basal unions, small to medium sized deadwood, asymmetrical crown, ivy around lower trunks The project arborist to supervise all excavation required within the critical root zone. Retain