This site is in beta — data may be incomplete and features are still being added.
Council Meeting/Documents/Report dated November 3, 2023 from the Director of Development Services regarding Off-Street Parking Review - Request for Proposal Terms of Reference
Staff Report

Report dated November 3, 2023 from the Director of Development Services regarding Off-Street Parking Review - Request for Proposal Terms of Reference

November 7, 2023Pages 188–20013 sections

A report regarding the terms of reference for a Request for Proposal (RFP) to review off-street parking.

8.1.b Off-Street Parking Review - Request for Proposal Terms of Reference
November 3, 2023Request for Proposal (RFP)

Construction Impact Assessment and Tree Management Plan for 339, 341, 345 Island Highway

Prepared for Boardwalk REIT

Page 188–200

Tree Inventory

Page 188–200
Tag # Surveyed (Yes/No) Location (On, Off, Shared, City) Bylaw protected (Yes/No) Common Name Botanical Name DBH (cm) Dripline radius (m) Critical root zone radius (m) Condition - Health Condition - Structural Relative tolerance Retention suitability General field observations/remarks Tree Retention Comments Retention status
2386 Yes On Yes Douglas fir Pseudotsuga menziesii 48 5 5.8 Fair to poor Fair to poor Moderate Conditional Dead snag adjacent to tree, ps fruiting body located 1m from base, asymmetrical, deflected leader, health stress The project arborist to supervise all excavation required within the critical root zone. Retain
2387 Yes On Yes Douglas fir Pseudotsuga menziesii 70 6 8.4 Fair to poor Fair Moderate Conditional Asymmetrical crown, ivy, health stress, slight lean to the south The project arborist to supervise all excavation required within the critical root zone. Retain
2388 Yes On Yes Douglas fir Pseudotsuga menziesii 66, 17 6 9.1 Fair Fair Moderate Conditional Asymmetrical crown, corrected lean to the south, health stress The project arborist to supervise all excavation required within the critical root zone. Retain
2389 Yes On Yes Douglas fir Pseudotsuga menziesii 25 2 3 Fair to poor Fair Moderate Conditional Suppressed, deflected leader, health stress The project arborist to supervise all excavation required within the critical root zone. Retain
2390 Yes On Yes Douglas fir Pseudotsuga menziesii 20 1 2.4 Poor Fair to poor Moderate Conditional Topped, limited canopy, health stress The project arborist to supervise all excavation required within the critical root zone. Retain
2391 Yes On Yes Big leaf maple Acer macrophyllum 41, 38, 20, 34, 30, 33, 55 7 11.8 Fair Fair to poor Moderate Conditional Kretzschmaria deusta, 20cm stem dead, medium sized deadwood, included bark at basal union The project arborist to supervise all excavation required within the critical root zone. Retain
2392 Yes On Yes Grand fir Abies grandis 15 2 2.3 Fair to poor Fair Poor Conditional Contacting 2391, health stress The project arborist to supervise all excavation required within the critical root zone. Retain
2393 Yes On Yes Big leaf maple Acer macrophyllum 22 4 2.6 Fair Fair Moderate Conditional Medium sized deadwood, asymmetrical crown, The project arborist to supervise all excavation required within the critical root zone. Retain
2394 Yes On Yes Big leaf maple Acer macrophyllum 23, 22 5 4.3 Fair Fair Moderate Conditional Extended lower limb, codominant stems, included bark at base The project arborist to supervise all excavation required within the critical root zone. Retain
2395 Yes Shared Yes Big leaf maple Acer macrophyllum 21, 23, 24, 22, 18, 21, 27 7 6.6 Fair Fair to poor Moderate Conditional 18cm stem dead, including bark at basal unions, extended lower limbs, ivy, some stems topped The project arborist to supervise all excavation required within the critical root zone. Retain
2396 Yes On Yes Big leaf maple Acer macrophyllum 14 6 1.7 Fair Fair to poor Moderate Conditional Heavy lean to the east, lower trunk deflection The project arborist to supervise all excavation required within the critical root zone. Retain
2397 No On Yes Douglas fir Pseudotsuga menziesii 48 5 5.8 Fair to poor Poor Moderate Conditional Possible historical leader loss, significant deflection/kink in trunk, health stress The project arborist to supervise all excavation required within the critical root zone. Retain
2398 No On Yes Willow Salix sp. 23, 22 2 4.3 Fair to poor Fair to poor Moderate Conditional Past stem failures, included bark at basal union, The project arborist to supervise all excavation required within the critical root zone. Retain
2399 Yes City Yes Big leaf maple Acer macrophyllum 25 3 3 Fair Fair Moderate High crown, rooted adjacent to mound The project arborist to supervise all excavation required within the critical root zone. Retain
2400 Yes City Yes Arbutus Arbutus menziesii 11 2 1.7 Fair Fair to good Poor 1m off pl, canopy weighted to the west The project arborist to supervise all excavation required within the critical root zone. Retain
2401 Yes On Yes Big leaf maple Acer macrophyllum 18, 16, 10, 22 5 5.1 Fair Fair Moderate Conditional Asymmetrical crown weighted to the north, included bark at basal unions, ivy The project arborist to supervise all excavation required within the critical root zone. Retain
2402 Yes On Yes Big leaf maple Acer macrophyllum 15, 18, 14 4 4.2 Fair Fair Moderate Conditional Rooted on slope, small deadwood The project arborist to supervise all excavation required within the critical root zone. Retain
2403 Yes On Yes Douglas fir Pseudotsuga menziesii 11 2 1.3 Fair Fair Moderate Conditional Rooted on slope, canopy interacting with adjacent big leaf maples The project arborist to supervise all excavation required within the critical root zone. Retain
2404 Yes Shared Yes Big leaf maple Acer macrophyllum 24, 11 2 3.7 Fair Fair Moderate Conditional Small deadwood, ivy, rooted on slope The project arborist to supervise all excavation required within the critical root zone. Retain
2405 Yes On Yes Douglas fir Pseudotsuga menziesii 23 3 2.8 Fair Fair Moderate Conditional Corrected lean to the north, rooted adjacent to rock outcrop, some health stress The project arborist to supervise all excavation required within the critical root zone. Retain
2406 Yes Shared Yes Big leaf maple Acer macrophyllum 13, 8, 24 4 4.4 Fair Fair Moderate Conditional Rooted on edge of slope, small deadwood, included bark at basal unions, possibly somewhat rooted in rock The project arborist to supervise all excavation required within the critical root zone. Retain
2407 Yes City Yes Big leaf maple Acer macrophyllum 21, 19, 12, 15, 20, 12 6 5.3 Fair Fair to poor Moderate Extended lower limbs, medium sized deadwood, included bark at basal unions, rooted at edge of slope The project arborist to supervise all excavation required within the critical root zone. Retain
2408 Yes City Yes Big leaf maple Acer macrophyllum 17, 9 5 2.7 Fair Fair Moderate Included bark at basal union, likely part of a historical larger tree, small deadwood The project arborist to supervise all excavation required within the critical root zone. Retain
2409 No City Yes Trembling aspen Populus tremuloides 11 4 1.3 Fair Fair Moderate Bend in trunk to the east, rooted edge of slope The project arborist to supervise all excavation required within the critical root zone. Retain
2410 No City Yes Trembling aspen Populus tremuloides 23 2 2.8 Fair Fair Moderate Corrected lean to the north, rooted on edge of slope The project arborist to supervise all excavation required within the critical root zone. Retain
2411 Yes City Yes Big leaf maple Acer macrophyllum 20, 22 4 4.1 Fair Fair Moderate Small deadwood; ivy, included bark at basal union, asymmetrical crown The project arborist to supervise all excavation required within the critical root zone. Retain
2412 Yes City Yes Big leaf maple Acer macrophyllum 17, 24, 25 5 6.0 Fair Fair Moderate Medium sized deadwood, asymmetrical crown, included bark at basal union The project arborist to supervise all excavation required within the critical root zone. Retain
2413 Yes City Yes Big leaf maple Acer macrophyllum 20, 33 5 5.4 Fair Fair Moderate Asymmetrical crown, small to medium sized deadwood The project arborist to supervise all excavation required within the critical root zone. Retain
2414 Yes City Yes Big leaf maple Acer macrophyllum 19 4 2.3 Fair Fair Moderate High mark crown, small deadwood, bend in lower trunk, possible historical secondary stem The project arborist to supervise all excavation required within the critical root zone. Retain
2415 No City Yes Cherry Prunus sp. 14, 6 6 2.1 Fair Fair to poor Moderate Bend towards the south, small stem is topped at 2m, wound on lower trunk The project arborist to supervise all excavation required within the critical root zone. Retain
Hedge 2 No City No Mixed evergreen species Mixed evergreen species 10 – 25cm dbh 2 1 – 2.5m Good Good Good Hedge row consisting of ~ 100 Excelsa cedar, 1 Douglas-fir and 5 Leyland cypress stems. *Road widening, sewer and water service connection proposed within the critical root zone. The project arborist to supervise all excavation required within the critical root zone. Retain*
Hedge 3 No City No Leyland cypress Cupressus x leylandii 20 – 24cm dbh 2 2 – 2.4m Good Good Good Hedge row consisting of 6 individual stems. *Road widening proposed within the critical root zone. The project arborist to supervise all excavation required within the critical root zone. Retain*
NT 1 No City Yes Douglas-fir Pseudotsuga menziesii 67 5 8.0 Fair Fair Moderate Rooted against rock outcrop. Utility pole recently installed ~2m from root collar. *Road widening proposed within the critical root zone. The project arborist to supervise all excavation required within the critical root zone. Retain*
Page 188–200

5. SITE INFORMATION & PROJECT UNDERSTANDING

The site is an existing multifamily complex in View Royal, BC. It is our understanding that the proposal is to construct 3 apartment buildings with underground parking.

Below is a general observation of the tree resource, as it appeared at the time of our site visit:

Page 188–200

6. FIELD OBSERVATIONS

The onsite tree resource consists of a mixture of native conifer and deciduous species that form a closed canopy over Southern portion of the property. The closed canopy is continuous with the lands to the North (see figure 1). The trees were observed to be growing in an unmaintained conditions, with many becoming overgrown with English Ivy.

Site context air photo: The approximate boundary of the subject site is outlined in Yellow.
Site context air photo: The approximate boundary of the subject site is outlined in Yellow.
Page 188–200

7. CONSTRUCTION IMPACT ASSESSMENT

7.1. RETENTION AND REMOVAL OF MUNICIPAL TREES

The following municipal trees (indicated by ID #) are located within influencing distance of the proposed development where they are possible for retention providing that their critical root zones are adequately protected during construction. The project arborist must be onsite to supervise all excavation or fill placement required within its critical root zone (shown on the tree management plan (T1) in appendix A):

Retain and protect 19 municipal trees and 3 hedge and 3 trees with shared ownership

  • 2229, 2230, 2231, 2232, 2233, 2234, 2235, hedge 1, 2395(shared), 2399, 2400, 2404(shared), 2406(shared), 2407, 2408, 2409, 2410, 2411, 2412, 2413, 2414, 2415, NT1, Hedge 2, Hedge 3.

Note that the municipality will need to provide consent, prior the removal of any trees that are located on Municipal property.

7.2. RETENTION AND REMOVAL OF ONSITE TREES

The following onsite trees (indicated by tag #) are located where they will be heavily impacted by excavation required to construct the foundation of the proposed u/g parkade and/or increased wind exposure caused by the proposed removal of the surrounding trees.

Remove 43 onsite trees

  • 2227, 2237, 2238, 2239, 2240, 2241, 2242, 2243, 2244, 2245, 2246, 2247, 2248, 2249, 2250, 2260, 2261, 2263, 2264, 2265, 2266, 2267, 2268, 2269, 2270, 2271, 2272, 2273, 2278, 2307, 2308, 2309, 2310, 2311, 2312, 2313, 2314, 2315, 2331, 2332, 2333, 2334, 2335.

The following onsite trees (indicated by tag #) are located where they are possible for retention providing that their critical root zones are adequately protected during construction. The project arborist must be onsite to supervise all excavation or fill placement required within its critical root zone (shown on the tree management plan (T1) in appendix A):

Retain and protect 125 onsite trees and 3 trees with shared ownership*

  • 2228, 2236, 2251, 2252, 2253, 2254, 2255, 2256, 2257, 2258, 2259, 2262, 2274, 2275, 2276, 2277, 2279, 2280, 2281, 2282, 2283, 2284, 2285, 2286, 2287, 2288, 2289, 2290, 2291, 2292, 2293, 2294, 2295, 2296, 2297, 2298, 2299, 2300, 2301, 2302, 2303, 2304, 2305, 2306, 2316, 2317, 2318, 2319, 2320, 2321, 2322, 2323, 2324, 2325, 2326, 2327, 2328, 2329, 2330, 2336, 2337, 2338, 2339, 2340, 2341, 2342, 2343, 2344, 2345, 2346, 2347, 2348, 2349, 2350, 2351, 2352, 2353, 2354, 2355, 2356, 2357, 2358, 2359, 2360, 2361, 2362, 2363, 2364, 2365, 2366, 2367, 2368, 2369, 2370, 2371, 2372, 2373, 2374, 2375, 2376, 2377, 2378, 2379, 2380, 2381, 2382, 2383, 2384, 2385, 2386, 2387, 2388, 2389, 2390, 2391, 2392, 2393, 2394, 2395(shared), 2396, 2397, 2398, 2401, 2402, 2403, 2404(shared), 2405, 2406(shared).

*Note that these trees are growing in unmaintained conditions and many of the trees were observed to have English ivy covering the trunks and canopies (see photograph 1 in Appendix B). These trees will become new forest edge trees and experience increased wind exposure by the proposed removal of trees on the South side of these trees. To increase the windfirmness, and reduce likelihood of tree failures, the English ivy must be removed from the trunk and canopies of these trees, prior to the removal of the adjacent trees.

7.3. RETENTION AND REMOVAL OF PRIVATE OFFSITE TREES

  • Based on plans that have been provided up to the date of this reporting, there were no private offsite trees observed within influencing distance of the proposed development.
Page 188–200

8. IMPACT MITIGATION

Tree Protection Barrier: The areas, surrounding the trees to be retained should be isolated from the construction activity by erecting protective barrier fencing (see Appendix A for municipal barrier specifications). Where possible, the fencing should be erected at the perimeter of the critical root zone. The barrier fencing to be erected must be a minimum of 4 feet in height, of solid frame construction that is attached to wooden or metal posts. A solid board or rail must run between the posts at the top and the bottom of the fencing. This solid frame can then be covered with flexible snow fencing. The fencing must be erected prior to the start of any construction activity on site (i.e. demolition, excavation, construction), and remain in place through completion of the project. Signs should be posted around the protection zone to declare it off limits to all construction related activity. The project arborist must be consulted before this fencing is removed or moved for any purpose.

Arborist Supervision: All excavation occurring within the critical root zones of protected trees should be completed under supervision by the project arborist. Any severed or severely damaged roots must be pruned back to sound tissue to reduce wound surface area and encourage rapid compartmentalization of the wound. The following excavation events are anticipated, which will require arborist supervision:

  • All excavation required within the critical root zone of 2228 for the footprint of the proposed sidewalk.
  • All excavation required within the critical root zone of 2251, 2252, 2253 for the footprint of the proposed u/g parkade and building.
  • All excavation required within the critical root zone of 2274 - 2277 for the footprint of the proposed u/g parkade and building.
  • All excavation required within the critical root zone of 2279 for the footprint of the proposed u/g parkade and building.
  • All excavation required within the critical root zone of 2316 for the footprint of the proposed u/g parkade and building.
  • All excavation required within the critical root zone of 2330 for the footprint of the proposed u/g parkade and building.
  • All excavation required within the critical root zone of 2251, 2336 - 2345for the footprint of the proposed building.

Methods to Avoid Soil Compaction: In areas where construction traffic must encroach into the critical root zones of trees to be retained, efforts must be made to reduce soil compaction where possible by displacing the weight of machinery and foot traffic. This can be achieved by one of the following methods:

  • Installing a layer of hog fuel or coarse wood chips at least 20 cm in depth and maintaining it in good condition until construction is complete.
  • Placing medium weight geotextile cloth over the area to be used and installing a layer of crushed rock to a depth of 15 cm over top.
  • Placing two layers of 19mm plywood.
  • Placing steel plates.

Demolition of the Existing Buildings: The demolition of the existing houses, driveways, and any services that must be removed or abandoned, must take the critical root zone of the trees to be retained into account. If any excavation or machine access is required within the critical root zones of trees to be retained, it must be completed under the supervision and direction of the project arborist. If temporarily removed for demolition, barrier fencing must be erected immediately after the supervised demolition.

Paved Surfaces Above Tree Roots: If the new paved surfaces within the CRZ of tree to be retained require excavation down to bearing soil and roots are encountered in this area, this could impact their health and structural stability. If tree retention is desired, a raised and permeable paved surface should be constructed in the areas within the critical root zone of the trees. The “paved surfaces above root systems” diagram and specifications is attached.

The objective is to avoid root loss and to instead raise the paved surface and its base layer above the roots. This may result in the grade of the paved surface being raised above the existing grade (the amount depending on how close roots are to the surface and the depth of the paving material and base layers). Final grading plans should take this potential change into account. This may also result in soils which are high in organic content being left intact below the paved area.

To allow water to drain into the root systems below, we also recommend that the surface be made of a permeable material (instead of conventional asphalt or concrete) such as permeable asphalt, paving stones, or other porous paving materials and designs such as those utilized by Grasspave, Gravelpave, Grasscrete and open-grid systems.

Mulching: Mulching can be an important proactive step in maintaining the health of trees and mitigating construction related impacts and overall stress. Mulch should be made from a natural material such as wood chips or bark pieces and be 5-8cm deep. No mulch should be touching the trunk of the tree. See “methods to avoid soil compaction” if the area is to have heavy traffic.

Blasting: Care must be taken to ensure that the area of blasting does not extend beyond the necessary footprints and into the critical root zones of surrounding trees. The use of small low-concussion charges and multiple small charges designed to pre-shear the rock face will reduce fracturing, ground vibration, and overall impact on the surrounding environment. Only explosives of low phytotoxicity and techniques that minimize tree damage should be used. Provisions must be made to ensure that blasted rock and debris are stored away from the critical root zones of trees.

Scaffolding: This assessment has not included impacts from potential scaffolding including canopy clearance pruning requirements. If scaffolding is necessary and this will require clearance pruning of retained trees, the project arborist should be consulted. Depending on the extent of pruning required, the project arborist may recommend that alternatives to full scaffolding be considered such as hydraulic lifts, ladders or platforms. Methods to avoid soil compaction may also be recommended (see “Minimizing Soil Compaction” section).

Landscaping and Irrigation Systems: The planting of new trees and shrubs should not damage the roots of retained trees. The installation of any in-ground irrigation system must take into account the critical root zones of the trees to be retained. Prior to installation, we recommend the irrigation technician consult with the project arborist about the most suitable locations for the irrigation lines and how best to mitigate the impacts on the trees to be retained. This may require the project arborist supervise the excavations associated with installing the irrigation system. Excessive frequent irrigation and irrigation which wets the trunks of trees can have a detrimental impact on tree health and can lead to root and trunk decay.

Windthrow: Where forest edge trees are proposed to be removed, we recommend that trees that may experience an increase in wind exposure be re-examined, once tree clearing has taken place, to ensure that they are structurally stable, and suitable for retention as leading-edge trees.

Arborist Role: It is the responsibility of the client or his/her representative to contact the project arborist for the purpose of:

  • Locating the barrier fencing
  • Reviewing the report with the project foreman or site supervisor
  • Locating work zones, where required
  • Supervising any excavation within the critical root zones of trees to be retained
  • Reviewing and advising of any pruning requirements for machine clearances
Page 188–200

Review and site meeting: Once the project receives approval, it is important that the project arborist meet with the principals involved in the project to review the information contained herein. It is also important that the arborist meet with the site foreman or supervisor before any site clearing, tree removal, demolition, or other construction activity occurs and to confirm the locations of the tree protection barrier fencing.

Page 188–200

9. DISCLOSURE STATEMENT

This arboricultural field review report was prepared by Talmack Urban Forestry Consultants Ltd. for the exclusive use of the Client and may not be reproduced, used or relied upon, in whole or in part, by a party other than the Client without the prior written consent of Talmack Urban Forestry Consultants Ltd.. Any unauthorized use of this report, or any part hereof, by a third party, or any reliance on or decisions to be made based on it, are at the sole risk of such third parties. Talmack Urban Forestry Consultants Ltd. accepts no responsibility for damages, if any, suffered by any third party as a result of decisions made or actions based on this report, in whole or in part.

Arborists are professionals who examine trees and use their training, knowledge, and experience to recommend techniques and procedures that will improve a tree’s health and structure or to mitigate associated risks. Trees are living organisms whose health and structure change and are influenced by age, continued growth, climate, weather conditions, and insect and disease pathogens. Indicators of structural weakness and disease are often hidden within the tree structure or beneath the ground. The arborist’s review is limited to a visual examination of tree health and structural condition, without excavation, probing, resistance drilling, increment coring, or aerial examination. There are inherent limitations to this type of investigation, including, without limitation, that some tree conditions will inadvertently go undetected. The arborist’s review followed the standard of care expected of arborists undertaking similar work in British Columbia under similar conditions. No warranties, either express or implied, are made as to the services provided and included in this report.

The findings and opinions expressed in this report are based on the conditions that were observed on the noted date of the field review only. The Client recognizes that passage of time, natural occurrences, and direct or indirect human intervention at or near the trees may substantially alter discovered conditions and that Talmack Urban Forestry Consultants Ltd. cannot report on, or accurately predict, events that may change the condition of trees after the described investigation was completed.

It is not possible for an Arborist to identify every flaw or condition that could result in failure nor can he/she guarantee that the tree will remain healthy and free of risk. The only way to eliminate tree risk entirely is to remove the entire tree. All trees retained should be monitored on a regular basis. Remedial care and mitigation measures recommended are based on the visible and detectable indicators present at the time of the examination and cannot be guaranteed to alleviate all symptoms or to mitigate all risk posed.

Immediately following land clearing, grade changes or severe weather events, all trees retained should be reviewed for any evidence of soil heaving, cracking, lifting or other indicators of root plate instability. If new information is discovered in the future during such events or other activities, Talmack Urban Forestry Consultants Ltd. should be requested to re-evaluate the conclusions of this report and to provide amendments as required prior to any reliance upon the information presented herein.

Page 188–200

10. IN CLOSING

We trust that this report meets your needs. Should there be any questions regarding the information within this report, please do not hesitate to contact the undersigned.

Prepared by: Noah Talbot, BA ISA Certified Arborist PN – 6822A Tree Risk Assessment Qualification Email: tmtreehelp@gmail.com

Page 188–200

11. REFERENCES

Dunster, J.A., E.T. Smiley, N. Matheny, and S. Lily. 2017. Tree Risk Assessment Manual, International Society of Arboriculture (ISA).

Town of View Royal Bylaw No. 695.

Page 188–200

APPENDIX A - TREE MANAGEMENT PLAN (T1)

Tree Management Plan Notes

  • The project arborist to supervise all excavation required within the critical root zones of Hedge 1 and Hedge 2 for the proposed road widening and water and sewer service connections.
  • The project arborist to supervise excavation and blasting required within the critical root zones of 2275-2277, 2279, 2316, 2330, 2336, 2337, 2343-2345, 2251-2255 for the footprint of the proposed u/g parkade and building and interior paved areas.
  • Any excavation required within critical root zones to install the proposed woodland path and child play structure(s) must be performed under the supervision of the project arborist.
  • Project arborist to supervise all excavation required within the CRZ of NT1 for the proposed road widening.
  • Project arborist to supervise all excavation required within the CRZ of 2228 for the footprint of the proposed sidewalk.
  • It is understood that the proposed woodland trail and child play structure area is conceptual at this stage, and that detailed plans will be provided for review at a later date. It is further understood that the final path and child play structure(s) will be designed to preserve the adjacent bylaw protected trees.

Legend

  • Existing tree with ID #
  • Tree protection fencing
  • Critical root zone radius (m)
  • Tree proposed for removal (X symbol)
  • Non-bylaw undersize tree
  • Unsurveyed tree
  • Site boundary

Tree Protection Fencing and Signage Detail

Tree Protection Fencing and Signage Detail diagram
Tree Protection Fencing and Signage Detail diagram

Tree Protection Fencing Specifications:

  1. FENCE WILL BE CONSTRUCTED USING 38 mm X 89mm WOOD FRAME: TOP, BOTTOM AND POSTS * USE ORANGE SNOW-FENCING MESH AND SECURE THE WOOD FRAME WITH "ZIP" TIES OR GALVANIZED STAPLES.
  2. ATTACH A 500mm X 500mm SIGN WITH THE FOLLOWING WORDING: PROTECTED ROOT ZONE - NO ENTRY. THIS SIGN MUST BE AFFIXED ON EVERY FENCE OR AT LEAST EVERY 10 LINEAR METERS.
  • IN ROCKY AREAS, METAL POSTS (T-BAR OR REBAR) DRILLED INTO ROCK WILL BE ACCEPTED.
Page 188–200

APPENDIX B - PHOTOGRAPHS

Photograph 1 – Photograph showing the English Ivy covering the trunk of many of the trees located at the Southeast corner of the site.
Photograph 1 – Photograph showing the English Ivy covering the trunk of many of the trees located at the Southeast corner of the site.
*Timestamp: Dec 14, 2022 at 11:11:19 AM* *Location: 550 Prince Robert Dr, View Royal BC V9B 1C8, Canada*
Page 188–200

Document Images

(13)
Document image
Document image
Document image
Document image
Document image
Document image
Document image
Document image
Document image
Document image
Document image
Document image
Document image
Extracted from: 2023 11 07 Council Agenda - Agenda - Pdf